HomeMy WebLinkAbout20091345 Ver 1_More Info Received_20100401SeSEPI ENGINEERING GROUP To: NCDENR-DWQ Attention: Ian McMillan 2321 Crabtree Blvd. Raleigh, NC 27604 Phone: 919-733-1786 From: David Whittington Subject: Granville Medical Center Date: April 1, 2010 VIA: Drop-off SEPI Project and Task No.: SC09.006.00 0 ? -13'-_5 LETTER OF TRANSMITTAL SEPI Engineering Group, Inc. 1025 Wade Ave Raleigh, NC 27605 Tel 919.789.9977 Fax 919.789.9591 Site/Civil Group We are sending you: ? Shop Drawings ? Prints ® Plans ? Samples ? Specifications ? Copy of Letter ? Change Order ? Reports ? Checks Copies Date Description 5 04-01-2010 Response letter, Exhibits 1-5, BMP supplements, & Geotechnical Report 5 01-29-2010 Full set of l 1x17 civil construction plans 1 04-01-2010 CD containinia full size exhibits and plan in PDF format These are transmitted as indicated below: ® For Approval ? As Requested ? Approved as Noted ? Returned after Loan ® For Your Use ? Approved as ? Returned for ? Resubmit Copies for Submitted Corrections Approval ? For Review and ? For Your File Comment Other u k v/ (C (ES Comments: Mr. McMillan, APR - 1 2010 DENR - WATER WAUTY Please hind the attached plans for the Granville Medical CKN+W43"49pow " your review. Let me know if you have any comments or questions. Thanks, Signed: V / ?(AZX?/ --J Page: 1/1 SEPI C ENGINEERING & CONSTRUCTION April 1, 2010 Ian McMillan, Acting Supervisor 401 Oversight/Express Review Permitting Unit NCDENR-Division of Water Quality Re: Granville Medical Center-DWQProject # 09-1345 Mr. McMillan, We are hereby responding to your requested additional needs for the above referenced project. The requested BMP Supplement Forms and checklists for a level spreader and a sand filter are included attached to this response. We are no longer proposing to utilize the grassed swale as a BMP and, therefore, have not included a Supplement Form for it. Based on the attached Nitrogen and Phosphorus calculations their export has actually been reduced in the post-developed condition. The area where we are expanding the existing parking lot has been defined at 5.43 Acres. We are adding 1.09 Acres of impervious parking within this area. Since the existing impervious is grandfathered we are basically treating the additional impervious with our proposed sand filter. By virtue of the site layout we are actually treating some of the existing impervious as well thereby reducing the calculated export below current levels. A complete set of full-size civil plans are included along with the BMP exhibits to show the full extent of easements and site impacts. If you have any questions or need additional information, please do not hesitate to let us know. Sincerely, SEP i ing Construction` ?f?r? D 1:/ illiam C. Piver, PE APR - 1 2010 Vice President, Site/Civil DENR•WAM WAUTY IAEII,MAND STORMWATER IWCH 1025 WADE AvENuE • RALEIGH, NC 27605 • TEL 919.789.9977. FAX 919.789.9591 • SEPIENGINEERING.COM Contents Sand Filter Supplement & Checklist Level Spreader Supplement & Checklist (incl. dated photograph) Tar-Pamlico Nitrogen Export Worksheet Sand Filter O & M Manual Level Spreader O & M Manual Geotechnical Report Exhibit Sheets EXHB-1- EXHB-5 Permit Number: (to be provided by DWQ) ? O?O? W A TF9OG r NCDENR ` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV) f. PROJECT INFORMATION Project name Granville Medical Center Contact name Bill Piver, PE Phone number 919-789-9977 Date March 31, 2010 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area (A p) 51,400.00 ft2 OK Impervious area 48,352.00 ft2 % Impervious (IA) 94.1% % Design rainfall depth (RD) 1,00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2.82 in 1 -yr, 24-hr intensity 0.12 in/hr Pre-development 1-yr, 24-hr runoff ft3/sec Post-development 1-yr, 24-hr runoff ft3/sec Pre/Post 1-yr, 24-hr peak control ft3/sec Storage Volume Design volume (WQV) 3,855.00 ft3 Adjusted water quality volume (WQV Adi) 2,891.25 ft3 Volume contained in the sedimentation basin and on top of the sand filter 3,006.00 Top of sand filter/grate elevation 458 ft amsl Weir elevation (between chambers) 458.5 ft amsl Maximum head on the sedimentation basin and sand filter (h MaxFilter) 3.00 ft Average head on the sedimentation basin and sand filter (h A) 1.50 ft Runoff Coefficient (Rv) 0.90 (unitless) Type of Sand Filter Open sand filter? Y Y or N SHWT elevation 458.00 ft amsl Bottom of the sand filter elevation 455.00 ft amsl Clearance (dSHWr) 2.00 Closed/pre-cast sand filter? N Y or N SHWT elevation ft amsl Bottom of the sand filter elevation ft amsl Clearance (d SHWT) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dspace) OK OK OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 5 Permit Number: (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (A s) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (A F) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (d F) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet discharge/flowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow-splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (W SJ? What is the depth of sand over the outlet pipe (dpipe)? 440.00 ft2 lJr\. IVICI W 1111111111U 111, UUL IIICY IIVtVU LU UU; II IU:ICQJCU LU 1.00 ft IIIU:ICQJC JUIIdU V QICd.I IIW WIII AIJU IIIU [UclaC UIC 562.00 ft2 ,.....L,....?....L.:1:f.. i .. .........:...1.,, ,,,,:.._...,1,..,..... ,.....I:,.. 456.00 ft amsl 454.50 ft amsl 1.50 ft 3.50 (ft/day) 15.00 in ft3/sec 1.66 hours OK. Submit drainage calculations. 0.07 days N Y or N Excess volume must bypass cell. N Y or N Insufficient flow splitter. Y Y or N OK 50.00 ft Y Yor N OK Y Yor N OK Y Yor N OK Y Y or N OK y Y or N OK 10.00 ft OK 1.50 ft OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 5 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. Z CFa6-oZ 1, Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build-out, - Off-site drainage (if applicable), and - Boundaries of drainage easement. O?J CNLa-o'i, 2. Plan details (1" = 30' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Vegetative filter strip dimensions and slope (if SA waters), - Proposed drainage easement and public right of way (ROW), - Design at ultimate build-out, - Off-site drainage (if applicable), and - Boundaries of drainage easement, ?Jl? ?Xt1s-off 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media, - Connection between the sedimentation chamber and the sand filter chamber and weir elevation, - SHWT elevation, - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable). 0'-"J ,JLLUbFO 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. suPPL.6MC-' 5. Supporting calculations (including drainage calculations) ?, yr wA<p 6, Signed and notarized operation and maintenance (0&M) agreement _N!? 7. A copy of the deed restrictions (if required). Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 3 of 5 ARIWA NCDENR C'?O? W ATF9pG y ? >_ y O < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I I. PROJECT INFORMATION Project name Granville Medical Center Contact name Bill Piver, PE Phone number 919-789-9977 Date February 4, 2010 Drainage area number 1 II. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 2.50 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Where Does the Level SpreaderDischarge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? fe Do not complete this section of the worksheet. fe Do not complete this section of the worksheet. % Do not complete this section of the worksheet. Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet, min in/hr Do not complete this section of the worksheet, cfs Do not complete this section of the worksheet. N (Y or N) N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below. Onto a composite turf reinforment mat to prevent erosion below the level spreader Do not complete this section of the worksheet 10.00 ft 10.00 ft 30.00 ft 50.00 ft 453.00 fmsl 440.00 fmsl 26.00 % Filter strip is too steep for a level spreader. N (Y or N) OK sq ft No forebay is needed. 44 ft/cfs N (Y or N) Y (Y or N) N (Y or N) 2.50 cfs N (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 3 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material cfs Do not complete this section of the worksheet Do not complete this section of the worksheet • w ------------ M 105.00 ft #VALUE! N (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. B 1 M Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 3 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. E I-131 - 01- 1. Plans 0" - 50' or larger) of the entire site showing: Design at ultimate build-out, - Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. C _-0 7- 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. ?LI) EXf-I6 - D5 3. Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, - Upslope channel, and Downslope filter fabric. I'JcwDGb 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. 8w' CP- 04 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. ON SJLGPLCAATAr 6. The supporting calculations. i /VGLAAcD 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 3 of 3 Tar-Pamlico Stormwater Rule 15A NCAC 28.0258 Piedmont of the Tar-Pamlico River Basin: Last Modified 4/1/2010 Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name: GranvilleMedical Ceater Date: 313112010 By: dm Checked By: Directions (same for pre-development and post-development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- a nd post- tables for consistency (bottom of column (2)), and also for consistency will the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through th e site, offsite catchment area draining in mus be included in the acreage values and treated. Pre-development: Type of Land Cover lre,t :SAL:* Fbrm?LI > AveLage EMC Colti nn Average E, 4 Columir . ores 0.4b ± 831 of TN; Ln /L 2 3: 4 of TP j i rn, 2 3 6 Transportation impervious' 5.43 5.09 2.60 71.83 0.19 5.25 Roofimpervit us 5.09 1.95 0.00 0.11 0.00 '41 a n aged per vious {lanlland+ear}?etl) 5.09 1.42 31.21 0.28 6.15 Managed pervious {tt'opland) 5.09 4.23 0.00 1.23 0.00 Managed 1)CI'YiOUS (pisturc) 5.09 2.04 0.00 0.62 0.00 Nvooded pervious 5.09 0.94 0.00 0.14 0.00 Fraction Iit ?crvioirsO 1 l - 0.56 T1 Loxd?ng 103.04 JP Loa diit 11 40 . Total Area of Development = :. f 9.75 TN Tzi . Caeff. 10.57 TP Exp.<Coeff 1 17 0 bl<1clyr) (lb/aclJ'r) :. . Post-development: Type Af)L andvver Area S 1V£ Formula Averai EPIC Colttrntt lvera<Ye [ tIC C"oluntt acres) (0 46 f 8.31 of TNna L} 2 3 # af'Tl' (nix/l,} (2) _1) 6 Trai?Spor A Jon in) envious 6.02 2.60 102.00 0.19 7.45 Roof ii»l?crtitpt?s 6.02 1.95 0.00 0.11 0.00 Managed pertiions 6.02 1.42 27.60 0.28 5.44 Wbode l pervlaus 6.02 0.95 0.00 0.14 0.00 l retiozt Inipcrvious (I) _ 0.67 TN I aad?? 129.60 TP ?° L 12 90 /VL /yr) . `C'oral Area o£ l)evelo??ataent 9.75 TNXj Cae£€ 13.29 TP l X17. C oeffi 1 32 (11?%aelyr) Ih/ac . Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post-development TN and TP loadings after BMPs are installed. Tar-Pamlico Stormwater Rule 15A NCAC 2B.0258 Piedmont of the Tar-Pamlico River Basin: Last Modified 5/23/03 Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Permit Number: (to be provided by DWQ) Drainage Area Number: Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. - Once a year, sand media will be skimmed. - The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/ debris is resent. Remove the trash/ debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as applicable) pavement surface. possible. Perimeter of sand filter Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the sediment and depth of greater than six inches. remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: Filter bed and underdrain Water is ponding on the surface for Check to see if the collector system is collection system more than 24 hours after a storm. clogged and flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage - Contact the NC Division of Water Quality have occurred at the outlet. 401 Oversight Unit at 919-733-1786. Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Granville Medical Center BMP drainage area number: Print name:Gerry Leighton Title: Facilities Director Address: 1010 College Street, Oxford, NC 27565 Phone: 919-690-3415 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Sand Filter O&M-Rev.4 2009Sept17 Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/ debris. system The flow splitter device The flow sputter device is Unclog the conveyance and dispose (if applicable) clogged. of an sediment off-site. The flow sputter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 Of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Granville Medical Center BMP drainage area number:1 Print name:Gerry Leighton Title: Facilities Director Address: 1010 College Street Oxford NC 27565 Phone: 919-690-3415 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 GEOTECHNICAL ENGINEERING REPORT PROPOSED EMERGENCY DEPARTMENT EXPANSION GRANVILLE MEDICAL CENTER 1010 COLLEGE STREET OXFORD, NORTH CAROLINA STEWART GEOTECHNICAL PROJECT NO. F9010.00 Stewart Engineering, Inc. 421 Fayetteville Street, Suite 400 Raleigh, NC 27601 T 919.380.8750 F 919.380.8752 GEOTECHNICAL ENGINEERING REPORT PROPOSED EMERGENCY DEPARTMENT EXPANSION Granville Medical Center 1010 College Street Oxford, North Carolina Stewart Geotechnical Project No.: F9010.00 Prepared For: GRANVILLE MEDICAL CENTER 1010 College Street Oxford, North Carolina 27565 June 12, 2009 S STEWART 06-12-09 Donald W. Brdwn "Jr., PE, LEED AP Geotechnical Engineering Manager This report was peer reviewed by an independent consultant, Harold D. Pruitt, PE (NC License No. 9551). TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................................................1 PROJECT INFORMATION ..............................................................................................................................1 2.1 Work Authorization ........................................................................................................................2 2.2 Site Location and Description ......................................................................................................2 2.3 Project Understanding ...................................................................................................................2 2.4 Geologic Area Overview ................................................................................................................2 SUBSURFACE EXPLORATION ..................................................................................................................... 3 3.1 Field Testing .................................................................................................................................... 3 3.2 Exploration Results ........................................................................................................................ 3 3.2.1 Surface ................................................................................................ 3 3.2.2 Soil ..................................................................................................... 3 3.2.3 Groundwater ........................................................................................ 4 4 ENGINEERING ASSESSMENT AND RECOMMENDATIONS ....................................................................... 6 4.1 General Discussion ........................................................................................................................ 6 4.2 Foundation Recommendations .................................................................................................... 6 4.2.1 Grouted Helical Piers ............................................................................. 6 4.2.2 Spread Footings .................................................................................... 6 4.3 Slab-On-Grade Recommendations ............................................................................................. 7 4.4 Seismic Design Considerations ................................................................................................... 8 4.5 Retaining Walls ................................................................................................................................ 8 4.5.1 Basement Walls .................................................................................... 8 4.5.2 Landscape/Site Walls ............................................................................. 9 4.6 Shoring Considerations .................................................................................................................. 9 5 CONSTRUCTION CONSIDERATIONS .........................................................................................................10 5.1 Site Preparation ...........................................................................................................................10 5.2 Groundwater ..................................................................................................................................10 5.3 Structural Fill Selection, Placement and Compaction ...........................................................10 5.4 Foundation Evaluations ...............................................................................................................11 5.4.1 Grouted Helical Piers ............................................................................11 5.4.2 Spread Footings ...................................................................................11 Appendix Figure 1 - Boring Location Diagram Figure 2 - Civil Survey Boring Logs Figures 3 & 4 - Subsurface Profiles Site Photographs Seismic Design Values 1 EXECUTIVE SUMMARY Stewart Engineering, Inc. (Stewart) has completed a geotechnical exploration at the site of the proposed Emergency Department (ED) Expansion on the campus of Granville Medical Center in Oxford, North Carolina. A summary of our findings, opinions and recommendations is provided below. . . F r of Borings 9 hs (ft) 16-24 Soil Types Encountered (USCS) ML, MH, CL, CH, SM Old Fill (ft) 3-111/2 (all 9 borings) Groundwater Elevation (ft) 453-458 Weathered Rock Elevation (ft) 4431/2-451 (2 borings) Hard Rock Elevation (ft) 443-4511/2 (6 borings) Seismic Site Characterization D Recommended Foundation System Deep Foundation - Grouted Helical Piers 1. The old fill encountered appears to be uncontrolled and poses a significant settlement risk for conventional spread footings. 2. Numerous buried utilities in the area that may Other Items of Note require relocation. Poorly compacted backfill in the associated trenches is also expected. 3. Depending on final siting of the mechanical room, its excavation may require underpinning and/or shoring. The owner/designer/contractor should not rely solely upon the summary table above. This report should be read in its entirety prior to implementing the recommendations in the preparation of design and construction documents. Stewart Engineering should be retained to perform sufficient services to determine plan/specification compliance with the recommendations in this report. 2 Page 2 PROJECT INFORMATION 2.1 Work Authorization The services discussed herein were proposed in a Stewart Engineering, Inc. proposal dated (revised) April 30, 2009 and authorized by Mr. Bruce Brooks of Granville Medical Center on May 20, 2009. This report has been prepared for the exclusive use of Granville Medical Center and was completed in general accordance with the industry standard of care using accepted geotechnical engineering practices. 2.2 Site Location and Description The subject site is located on the Granville Medical Center campus at 1010 College Street in Oxford, Granville County, North Carolina. More specifically the ED expansion site is located on the southeast (rear) corner of the existing hospital building. The southern portion of the expansion area is currently a grass-covered yard. The northern portion is occupied by the ED entrance, access drive and patient drop-off area. The ground surface slopes gradually downward from north to south through most of the proposed building footprint, but the slope increases at the south end of the footprint. Relief within the proposed building footprint is about approximately 4-6 feet according to the site survey provided by Granville Medical Center. A copy of this drawing is included in the Appendix this report as Figure 2 for general reference. Also shown on the provided drawing are numerous buried utilities and associated structures (manholes, vaults, etc.) within the proposed expansion footprint. These include one water line with feeds to a hydrant and into the hospital, seven sanitary sewer lines and five storm sewer lines. Also, during private utility location, electrical service for the hospital exterior lighting was discovered near the ED entrance. The existing building has a masonry veneer that is cracking and some of the windows were observed to be racked, both of which are likely due to structural settlement. The portion of the existing facility that is labeled "Future Lab" on the Boring Location Diagram (Figure 1 in the Appendix) includes a basement. The provided as-built drawings by Wilkerson Associates indicate a basement finished floor elevation of 461.13 feet (Sheet S-1, dated May 16, 1992) and a first floor FFE of 471.80 feet (Sheet S-2, dated May 16, 1992) for most recent hospital additions. 2.3 Project Understanding It is our understanding that the proposed addition will consist of an L-shaped, single-story building with an approximately 17,500 square foot footprint. The structure will consist of steel framing, concrete slab-on- grade and brick veneer. The southern portion of the new addition, below the "Surgery Storage Expansion", will include a small basement for additional mechanical space. The southern portion of the proposed structure is also being designed to accommodate the addition of two additional floors. According to input from Stewart's structural group, the maximum column load is estimated at 150 kips; however, the future vertical expansion area will require foundations to support a maximum column load of 350 kips. Floor loads will not exceed 100 pounds per square foot. The proposed expansion FFEs will match those of the existing building, as mentioned in the preceding section of this report, resulting in up to about 31/2 feet of fill in the southern portion of the expansion. The information presented in this section was utilized in the geotechnical analysis. Therefore, if any of the noted information is incorrect or has changed, please inform us so that we may amend the recommendations presented in this report, if appropriate or necessary. 2.4 Geologic Area Overview The project site is located within central Granville County, North Carolina, which lies within the Raleigh Belt of the Piedmont Physiographic Province of the eastern United States. Review of the Geologic Map of The Oxford Quadrangle, Granville and Vance Counties, North Carolina (compiled by Jarvis B. Hadley, 1974) indicates that the bedrock below the local area is characterized by medium-coarse- to fine-grained hornblende gabbro-diorite and quartz diorite. ,AW S' Granville Medical Center ED Expansion Oxford, North Carolina Page 3 3 SUBSURFACE EXPLORATION 3.1 Field Testing The subsurface conditions at the site were evaluated with a total of nine soil test borings. The borings were advanced to depths ranging from approximately 16 feet to 24 feet below the existing grade. All test locations were marked in the field by Stewart Engineering using the provided site map and measuring from the onsite features. A Boring Location Diagram (Figure 1), which indicates the approximate test locations, is presented in the Appendix of this report. Prior to drilling, Stewart contacted the North Carolina One-Call Center for the location and marking of buried public utilities. As an added protection, a private utility locating firm was sub-contracted to check for private utilities in the general vicinity of each boring. This was accomplished using geophysical methods, with only utilities in the immediate area (possible conflicts) marked. Soil test borings were advanced at this site utilizing a trailer-mounted CME 45 drilling rig. Drilling was performed with 21/4-inch (I.D.), hollow-stemmed, continuous flight augers. All boring and sampling operations were conducted in general compliance with ASTM D1586. At predetermined intervals, soil samples were obtained with a split-barrel sampler (standard 2-inch O.D.). The sampler was rested on the bottom of the borehole and driven to a penetration of 18 inches (or fraction thereof) with blows of a manual 140-pound drop hammer falling 30 inches. Of the 18 inches, the number of hammer blows required to achieve 6 inches of penetration is recorded for three consecutive segments. The sum of the blow counts for the second and third 6-inch segment is termed the Standard Penetration Test (SPT) resistance, or N-value. The soil samples obtained during the drilling operation were placed in labeled containers and transported to our lab where they were visually-manually classified and logged by a Professional Engineer. The Boring Logs are included in the Appendix of this report. Unless otherwise requested, all samples will be disposed of after 2 months. 3.2 Exploration Results 3.2.1 Surface Borings B-4 and B-5 were performed in an existing sidewalk and therefore encountered concrete (4 inches) at the ground surface. The remainder of the borings encountered about 5 inches of topsoil and root mat at the ground surface. Although not encountered in the borings, the general area also includes mulch and landscaping vegetation in planter beds as well as asphalt pavement and the associated stone base in the driveway. 3.2.2 Soil The following is a subsurface description of a generalized nature, provided to highlight the major soil strata encountered. The stratification of the subgrade materials illustrated on the boring logs represents the conditions in the actual test locations; therefore, variations should be expected between borings. Stratigraphy boundaries only represent the approximate depth/elevation of a noticed material change, and the transition between material types is typically gradual. Furthermore, it is often difficult to discern between clean fill soil and native material. The ground surface elevations presented on the Boring Logs and/or referenced in this report were interpolated from provided topographic information and should be considered approximate. Soils encountered included: Fill - Fill soils were encountered in all nine borings to approximately 3 to 111/2 feet below the existing grade. The fill generally consists of Clayey SILT (MH) and Clayey Sandy SILT (ML) with lesser amounts of Silty Fat CLAY (CH). The fill also contains varying amounts of gravel and organic material. The N-values within the fill are sporadic, ranging from 4 to 22 blows per foot with an average of 11 blows per foot. Given the variation in subsurface conditions (soil type and consistency), the fill appears to be uncontrolled. Residuum - Residual (native) soils are the product of in-place physical and/or chemical weathering of the parent bedrock. The residual soils, which underlie the fill soils, consist of stiff Granville Medical Center ED Expansion Oxford, North Carolina Page 4 to very stiff Clayey SILT (MH), stiff to hard Sandy SILT (ML) and lesser amounts of very stiff Silty Lean CLAY (CL) and Silty SAND (SM). Partially Weathered Rock - Often times a transitional geo-material, referred to as Partially Weathered Rock (PWR), is encountered between the overlying soil and bedrock or as suspended layers/lenses within a soil mass. Partially Weathered rock is subdivided into two classes by the N.C. State Building Code as follows: • Soft Weathered Rock (SWR) - Defined as "broken or partially weathered rock with standard penetration resistance (ASTM D1586) between 50 blows per six inches and 50 blows per inch". SWR was encountered in boring B-7 at an approximate elevation of 451 feet. • Hard Weathered Rock - Defined as "broken or partially weathered rock normally having Standard Penetration resistances (ASTM D1586) in excess of 50 blows per inch". HWR was encountered in boring B-3 just above the bedrock, at an approximate elevation of 4431/2 feet. Hard Rock - Hard rock is commonly defined by residual or native material of sufficient hardness to refuse mechanical auger penetration. Hard rock was encountered in six of the nine borings. It appears that the bedrock ranges from about elevation 443-4511/2 feet. 3.2.3 Groundwater Groundwater measurements were attempted at the time of completion of drilling at each of the borings performed at the site. Five of the nine holes were left open for 24 hours to obtain stabilized groundwater readings. Following 24-hour measurements, the boreholes were backfilled with auger cuttings (soil). Groundwater was encountered in each of the five boreholes that remained open overnight, as shown in the table below. Also shown in this table are the estimated groundwater depths for remaining four borings that were backfilled prior to departure from the site. These depths are based on the depth of the first wet soil sample in correlation to the surrounding groundwater table depths. 0-Hr GW 24-Hr GW Wet Soil GW Boring ft ft Depth, ft ft B-1 Dry BF 131/2-15 13* 458* SS-5 B-2 Dry BF 131/2-15 13* 457* SS-5 B-3 Dry 14 131/2-15 14 453 SS-5 B-4 Dry BF 131/2-15 13* 457* SS-5 B-5 Dry BF 131/2-15 13* 457* SS-5 B-6 Dry 13 131/2-15 13 454 SS-5 B-7 Dry 13 131/2-15 13 456 SS-5 B-8 Dry 12 131/2-15 12 454 SS-5 B-9 Dry 12 131/2-15 12 456 SS-5 *These depths/elevations are estimated based on the depth to wet soil samples and groundwater depths in the surrounding borings. BF=Backfilled Avg Granville Medical Center ED Expansion Oxford, North Carolina S Page 5 The groundwater conditions represent the conditions at the time of the exploration. Fluctuations in groundwater levels are common and should be expected. Common factors that influence groundwater levels include, but are not limited to, soil stratification, climate/weather, nearby bodies of water (lakes, ponds, etc.), underground springs, streams, rivers and surface water discharge. At the onset, as well as continually throughout the construction process, the contractor should monitor groundwater levels if determined to be detrimental to the project. Management of groundwater can significantly impact construction procedures/practices, schedules and project budgets. S' Granville Medical Center ED Expansion Oxford, North Carolina Page 6 4 ENGINEERING ASSESSMENT AND RECOMMENDATIONS 4.1 General Discussion Based on the subsurface conditions encountered during the field exploration program, the construction considerations discussed in Section 5 of this report and the estimated loads of the proposed structure, it appears that the use of conventional spread footings over the old fill will result in excessive settlement. This is due to the highly variable consistency/compaction and low strength of the old fill. As such, the expansion will require the complete removal of the old fill or the use of a deep foundation (helical pier) system. Given the quantity of the old fill that would require removal, we anticipate that a helical pier system will be more economical, less disruptive to hospital daily operations and will require less time. 4.2 Foundation Recommendations 4.2.1 Grouted Helical Piers Based on the old fill across the entire site, we recommend using grouted helical piers installed into the underlying residuum to support the structural loads imposed by the building. This will enable the loads to be transfer to a deeper, more competent soil stratum. Helical piers are foundation elements consisting of a steel shaft with one or more circular steel bearing plates (helixes), followed by steel shaft extensions, that are advanced as a unit into the subgrade by mechanical twisting. Between each extension, a lead displacement plate is also installed to ream the hole around the shaft and to pull grout down into the hole. The installation equipment typically consists of a backhoe, skid-steer or mini-excavator. We recommend using helical piers with a minimum shaft diameter of 13/4-inches with an allowable compression capacity of 45 kips using a F.O.S. of 2.0. The piers should be advanced through the fill and into the residuum until the necessary torque is achieved to provide the 45 kip capacity. If adequate torque is not achieved in the residual soils, then the piers will need to be extended to the underlying weathered rock/rock, which is about 20-30 feet below the FFE of 471.80 ft. Typically when helical piers are extended to rock, the piers are not able to achieve the predetermined torque and the piers spin on top of the rock. Therefore, since this condition could be encountered, we advise that the contractor include at least one static load test in the bid for capacity verification purposes. If the piers do not reach the rock, the load test will not be needed and thus the owner should receive a credit. For bidding purposes, we suggest that pricing be based on 25-foot piers with an add-deduct price for variations in installation depths (typically per extension). Total settlement of a foundation system supported by helical piers bearing on the weathered rock or rock is expected to be less than 1 inch. Please note that helical piers provide negligible lateral load resistance; therefore, lateral foundation loads should be resisted using battered piers or passive soil pressure around the pile caps. 4.2.2 Spread Footings After reviewing the provided project information presented earlier in this report and the subsurface conditions encountered, it has been determined that the use of conventional spread footings will result in excessive total and differential settlements. As such, the use of a spread foundation system will require the complete removal of the existing fill. Since this fill extends below the adjacent (existing) foundations, removal of the fill will be very difficult and require extensive shoring and underpinning of the existing construction. These factors will likely make this option less economically attractive when compared to the helical pier system discussed above; however, we are providing it as a potential option for pricing and cost comparison if so desired. Provided that the old fill is completely removed from within the expansion footprint and replaced with compacted structural fill as discussed later in this report, we recommended that an allowable net soil bearing pressure of 2,500 pounds per square foot (psf) be used for the design of building foundations. This bearing capacity should be used to determine the foundation sizes for the final loading condition (i.e. after S Granville Medical Center ED Expansion Oxford, North Carolina Page 7 the future two-story vertical expansion). The allowable bearing pressure should include dead load plus sustained live load. Basement foundations that are to be covered with backfill should also be designed to account for the soil loading. For bearing and frost depth considerations, we recommend that all foundations bear at least 18 inches below the surrounding finished grade. Based on the recommended bearing capacity and a maximum column load of 150 kips, post- construction settlement for the proposed single-story expansion is expected to be on the order of 1/2- inch. Differential settlements within the proposed single-story expansion are expected to range up to 1/4-inch over a typical 40-foot span. However, upon addition of the two future floors, additional settlements will be realized by the structure. We estimate that the reported maximum column load of 350 kips (total after vertical expansion) will result in an additional '/z-inch of total settlement and about another 1/4-inch of additional differential settlement. Please note that since the existing building has been in place for about 12 years, we expect that its foundation soils have likely undergone primary consolidation/settlement and thus any settlement of the new building will be differential to the older construction. As such, building connection details should accommodate for the anticipated movement. In addition, several of the proposed footings will be located near (behind) the existing basement wall and thus this new loading should be properly analyzed during the design phase. Soil forces may be used to resist both uplift and sliding of the footings. Soil adjacent to the footing will provide passive resistance to lateral movement, while the soil at the footing base will also provide resistance to lateral movement via friction. We recommend a passive earth pressure coefficient (Kp) of 2.77 and an ultimate friction coefficient (d) of 0.30 for foundation design. We recommend that a safety factor of at least 1.5 be used to determine the soil's allowable passive resistance and the soil's allowable friction. We also recommend using a moist unit weight of 120 pcf to compute the soil mass weight. The volume of the soil mass for uplift may be calculated by assuming that it extends 30 degrees (from vertical) from the top perimeter edge of the footing to the ground surface. 4.3 Slab-On-Grade Recommendations Based on the conditions encountered at this site, we expect that the existing fill will provide adequate support for the proposed slab-on-grade. In the slab design, we recommend placing a stone layer below the slab to provide uniform support and to provide a capillary break from the subgrade soils. We recommend using Aggregate Base Course (ABC) stone or an open-graded crushed stone (e.g. No. 57 stone); however, it is our experience that open-graded crushed stone can collect water during periods of rain and cause saturation and softening of the subgrade soils prior to placement of the floor slab. Therefore, construction sequencing/timing, and the season in which the stone is placed, should be taken into consideration. Prior to stone placement, the slab support soils should be evaluated to check stability and soil conditions. The design of the concrete slab-on-grade should be based on Westergaard's modulus of subgrade reaction (k). We estimate the soil k-value to be about 100 pci for the near surface soils encountered at this site; however, the placement of the above-mentioned stone base will increase the modulus depending on its thickness. We recommend placing 4 to 6 inches of stone beneath the slab-on-grade and using the following corresponding k-values during design, often referred to as keff• If the floor slab design is sensitive to K, we recommend performing plate load testing in accordance with ASTM D1196 to allow refinement of the provided k-values. We also recommend the installation of a vapor retarded/barrier below the addition slabs as a measure of protection against water vapor intrusion. Even in the absence of groundwater, water vapors in the soil can rise and collect just below the slab. This buildup of moisture typically leads to moisture transmission through the slab and could damage flooring and/or cause elevated moisture levels within AW, J Granville Medical Center ED Expansion Oxford, North Carolina Page 8 the structure. To reduce such, we recommend considering the use of a vapor retarder meeting ASTM E-1745. The vapor barrier should be installed per the ACI guidelines (ACI 302.2R) and ASTM E-1643. It is important to point out that cracking of concrete is normal and should be expected. Proper jointing of slabs is paramount in the control of cracking. The American Concrete Institute (ACI) recommends a maximum panel size (in feet) equal to approximately three times the thickness of the slab (in inches) in both directions. Controlling the water-cement ratio of the concrete, particularly after batching, and including fiber reinforcement in the mix can also help reduce shrinkage cracking. 4.4 Seismic Design Considerations Per the 2009 N.C. State Building Code, a locally amended adoption of the 2006 International Building Code (IBC), the design of a structure must consider dynamic forces resulting from seismic events, regardless of their likelihood of occurrence. As part of a generalized procedure to estimate seismic forces, the code assigns a Seismic Site Classification (letter designation of Class A through F) based on the subgrade soil/rock conditions within the upper 100 feet of the ground surface at the subject site. Based on the SPT N-values recorded from the soil test borings, the subject site is consistent with a Seismic Site Class "D". The corresponding Mapped Acceleration Values (Ss & S1), Site Coefficients (Fa & Fv), Adjusted Spectral Accelerations (SMs & SM1) and Design Spectral Accelerations (SDs & SD1) are included in the Appendix of this report. These values are based on the NEHRP (2003) values and obtained via the on-line U.S. Geologic Survey (USGS) Ground Motion Parameter Calculator located at http://earthquake.uscis.gov/research/hazmaps/`desicin. The following paragraphs briefly discuss our qualitative assessments of the other seismic-related issues. Detailed quantitative analyses for these items were not included in our Scope of Work and are not considered necessary at this time given the development plans and the subsurface conditions encountered. Liquefaction Hazard - Risk level is low - The soils encountered were of sufficient fines content and density to render them not readily liquefiable. Slope Stability - Risk level is low - Based on the presumed grading, significant cut and fill slopes are not planned for construction. Surface Rupture - Risk is low - No known active faults underlie the site. 4.5 Retaining Walls 4.5.1 Basement Walls The onsite lean SILTS (ML) and Silty SANDS (SM) are typically suitable for use as basement wall backfill. We do not recommend the use of soils that have high clay contents, such as the MH-, CL-, or CH-soil. Soil should be compacted to the degree specified later in this report, yet extreme care should be given to compaction efforts behind retaining walls as to not to exert excessive lateral stress on the wall. Fill placed within 5 feet of the wall should be placed in 6-inch loose lifts and compacted with lightweight tampers such as a sled tamp, jumping-jack or a small walk-behind roller. Basement walls should have sufficient drainage to alleviate hydrostatic pressure. This may consist of No. 57 stone encased in filter fabric (nonwoven) or a composite drain board, either of which should be connected to the necessary piping to transport any collected water away from the rear of the retaining wall. This may require the discharging into the existing storm sewer system. Also, where waterproofing of basement walls is specified, adequate protection of the waterproofing material should be provided to prevent damage during backfilling operations. Since basement walls are rigid and stationary (restrained from deflection and/or translation), we recommend the use of the at-rest earth pressure coefficient (ko). In the absence of the laboratory test data necessary to determine the typical retaining wall design parameters, which was not included in our scope, we are providing the following estimates for the soils encountered at the site. AW_ Granville Medical Center ED Expansion e% Oxford, North Carolina Page 9 F:Materiza I Internal Friction Angle% ? Moist Unit Weight, y Earth Pr Coeffi Active essure cients At-Rest Condition SM . 30 130 Ka 0.33 , ko 0.50 ML 28 120 0.36 0.53 MH 24 120 0.42 0.59 #57 Stone 38 100 0.24 0.38 Note: Passive parameters for retaining wall foundation design should use the criteria in Section 4.1.1 of this report *Effective condition. No cohesion recommended by NCMA orAASHTO MSE wall guidelines. **Retained zone only (i.e. not to be used for backfill in the reinforced zone). Values assume level backfill and no account for seismic (earthquake) forces. 4.5.2 Landscape/Site Walls The National Concrete Masonry Association (NCMA) recommends that mechanically-stabilized earthen (MSE) wall backfill within the reinforced (geogrid) zone have a maximum on 35 percent fines (material passing the #200 sieve). This criterion limits wall backfill to sand or other granular material. Therefore, readily available soils at this site are not likely to be suitable for MSE wall construction using the NCMA recommendations. However, it has been our past experience that low elasticity SILTS (ML) similar to those encountered onsite are often used during wall construction, but such a decision must be made by wall designer and the appropriate soil strength parameters should be incorporated into the wall design. For cantilevered or free-standing walls that are allowed to move without top restraint, we recommend the use of the active earth pressure coefficient (ka) and the other pertinent parameters in the above table. However, if the wall is movement-critical and minimal wall deflection is required, the at-rest (ko) earth pressure coefficient should be used in the design. In the design of MSE retaining walls, we suggest the incorporation of a chimney drain at the rear end of the geogrid (at the face of the retained soil), as well as a blanket drain at the bottom of the wall, to reduce hydrostatic pressures on the wall. This may consist of No. 57 stone encased in filter fabric (nonwoven) or a composite drain board, either of which should be daylighted. Furthermore, the designer should verify acceptable global stability and settlement in addition to the standard internal stability analysis. 4.6 Shoring Considerations The proposed mechanical room will be excavated near, and possibly adjacent to, the existing Imaging Unit and Surgery Unit foundations. This excavation is expected to extend about 9 feet below the adjacent foundation. If so, temporary shoring and/or underpinning will be necessary. Assuming that the owner selects the helical pier foundation system, helical piers can also be used to provide shoring and underpinning support if needed. If not, other such systems like sheet piling, pile-and-lagging, jet- grouting, and/or mini-piles can be used for these functions. Temporary underpinning and shoring designs are typically design-build functions performed for the contractor based on the anticipated construction approach (i.e. means and methods). AOL S Granville Medical Center ED Expansion Oxford, North Carolina Page 10 5 CONSTRUCTION CONSIDERATIONS 5.1 Site Preparation Initially, all topsoil, vegetation, pavement, demolition debris and any other unsatisfactory/deleterious materials should be removed from the proposed areas scheduled for site development for a lateral distance of at least 5 feet beyond the limits of new construction. If poorly compacted utility trench backfill is encountered, it should be removed and replaced to sufficient depth as determined at the time of testing. After stripping in the areas to receive fill, we recommend that the near-surface soils be assessed by means of proofrolling. This should be performed prior to fill placement or other construction and in the presence of the owner's testing agency. We recommend proofrolling with a loaded, tandem-axle dump truck with repeated passes over the subject area. The area should also be assessed with a probe rod to identify isolated soft areas that need repair prior to filling operations. Deficient areas should be repaired as recommended by the owner's testing agency. The onsite silts will be moisture sensitive and will likely become unstable due to the presence of excess moisture (water) and construction traffic loading. Therefore proper site drainage should be maintained during earthwork operations. If not, the accumulation of water will result in construction delays. Common approaches to reduce wet weather delays include grading the area so that surface water flows away from the site, sealing the surface with a smooth-drum roller at the end of each day or prior to precipitation events, lime/cement treating critical areas to resist water penetration and/or forming temporary ditches, swales, berms or other surface water diversion features. 5.2 Groundwater Given that groundwater was encountered at a depth of about 5 feet below the assumed mechanical room FFE, we do not anticipate that groundwater will significantly impact the proposed construction. However, pockets of perched water may be encountered during site excavations that will require pumping from a sump point. A perched water condition is most likely to be encountered in the fill mass. 5.3 Structural Fill Selection, Placement and Compaction Any material utilized as structural fill should not contain rocks greater than 3 inches in diameter or greater than 25% retained on the 3/4-inch sieve. Structural fill material should not contain more than 4% (by weight) of organic matter or other deleterious material. Structural fill should possess a Maximum Dry Density (MDD) of 95 pounds per cubic foot (pcf) or greater as determined by the Standard Proctor Compaction Test (ASTM D698). It is preferable for the Plasticity Index (PI) of structural fill soil to not exceed 25 and the Liquid Limit (LL) not exceed 50, as determined by Atterberg Limit testing (ASTM D4318). This corresponds to Unified Soil Classification System (USCS) soil designations of SM, ML, and some CL and SC in this region. In order to utilize the onsite elastic silts (MH), which do not meet the above criteria, such material can be used at depth of 4+ feet below the finished grade inside the proposed building footprint plus an additional 10 feet beyond the building perimeter. In proposed pavement areas, these materials can be used to 18 inches below finished subgrade elevation. Fill material required to establish subgrade elevations should be placed in 8-inch thick (or less) loose lifts. Fill soils should be compacted to the values shown in the following table, as determined by the Standard Proctor Compaction Test (ASTM D698). The moisture content of the controlled fill should be maintained within f30/o of the material's optimum moisture content as determined by the Standard Proctor Compaction Test; however, slight deviation from this can sometimes be tolerated depending on the grading plan. Such deviation should be considered by the engineer representing the owner's/contractor's material testing firm. Some moisture conditioning of fill soils may be necessary prior to placement, of which drying during the "wet season" always proves to be the most challenging. Granville Medical Center ED Expansion S Oxford, North Carolina Page 11 Building Pad 1 98 Sidewalks, Utility Pads, 95 Pavement etc. Non-Structural Areas 90 Note: Compaction effort of utility backfill should be based on placement location. It is recommended that the placement and compaction of structural fill be monitored by an independent testing agency working for the owner. We recommend that compaction testing be performed at the following rates: • Building Pad - 1 test per lift per 2,000 square feet of fill placed (minimum) • Parking Lot - 1 test per lift per 5,000 square feet of fill placed (minimum) • Trench backfill - 1 test per lift per 100 feet of trench backfill (minimum) 5.4 Foundation Evaluations 5.4.1 Grouted Helical Piers Helical pier installation should be performed by an experienced contractor with properly suited equipment and tooling. The contractor shall provide the most suitable pier, taking into account the subsurface conditions discussed in this report, and establish the required torque value to achieve the design capacity. This information should be submitted to the Geotechnical Engineer for review at least 2 weeks before mobilizing to the site. The contractor's installation equipment should be in good working order and have a pressure or torque gauge to monitor resistance as the pier is advanced into the subgrade. If a pressure gauge is used, it shall be calibrated to the applied torque with proper documentation of the calibration proved to the inspector for review; however, to confirm the field torque correlations, we recommend using a shear pin torque limiter for the first 10 piers (minimum). The torque should be monitored and recorded for each pier on a full-time basis by the owner's testing agency. At minimum, this monitoring should document pier placement, pier type, installation equipment/method, torque applied at termination, termination/tip elevation, cut-off elevation, grouting operations and any obstruction or subsurface anomalies encountered. Connection details relating to the pile cap connection should also be checked during pile cap steel inspection. The grout used in the piers should be sampled and tested to verify compressive strength. 5.4.2 Spread Footings Following the removal of the old fill and establishing the finished subgrade, should this approach be implemented, footing excavations should be performed using bucket with a flat cutting edge (no teeth) to reduce disturbance of the exposed bearing soil. Once excavated, the footings should be cleaned of loose material and protected from disturbance. This includes protection surface water run- off and freezing. If water is allowed to accumulate within a footing excavation and soften the bearing soils, or if the bearing soils are allowed to freeze, the deficient soils should be removed from the excavation and rechecked by the testing firm prior to concrete placement. When concrete cannot be placed immediately, we recommend placing a mud-mat to protect the bearing soil, but only following the footing evaluation. Foundation bearing materials, and sometimes slab support soils, should be checked during construction to verify satisfactory bearing conditions, materials and strength. We recommend using a 1/2-inch diameter, T- handled probe rod for an overall qualitative assessment throughout the foundation excavations, followed by strategically-placed hand auger borings and Dynamic Cone Penetrometer (DCP) testing for quantitative evaluation. Such testing should be completed prior to stone, steel or concrete placement. Unsuitable soil detected during this evaluation should be repaired as directed by the owner's testing agency. AOL S' Granville Medical Center ED Expansion Oxford, North Carolina Page 12 Based on the fill conditions encountered, undercutting and replacement should be expected in the areas of borings B-5, B-9 and adjacent to the existing basement walls. Replacement is recommended to consist of compacted fill soil or compacted aggregate base course (ABC) stone. The use of No. 57 stone should only be considered for shallow interior applications due to the stone's ability to collect water and soften the subgrade. Use of No. 57 stone as a backfill material should not be permitted without the approval of the owner's testing agency. Granville Medical Center ED Expansion `7 Oxford, North Carolina BORING LOCATION DIAGRAM VNM8VO NINON •oaoexo ..._?... ........, .... .. _.,: W M ~ Y . w 133815 333110 otol NOISNHdX3 a3 2131N3O 1VOI EW 3llIANVdD Wb E)VIa NOIlVDO] JNRi09 t1 I l l ?J M3 1 S w?= 09L S g g o o r- I \\\\ W O / \ N ? 2 Q^ _ 2 W / W W Q / D J 0 W N 2 , O U d a j 22 m `v ? I rn J D W W Zo J O m d =) O O d ? m I C ?EEM C r AJ. ?c 03 Ji? °C 1 1(? o Ro- jml VQ V C p W § A [?f 7.[V ^J V i fir.. 9 1k5 I L I CIVIL SURVEY VNIIOHV] HIUON '010 X0 133HL5 3031103 0101 -•'=?"-=-'•?w' .__ v NOISMddX3 43 2i31N3D WDMIW 3-IIIANVIdD 121 v m 3 19 xs (OW8331n9N3 1d3S AS O-7YVd3(Yd) AgnbnS IrnrD w 09= S q y N 00 f-Pa ti^ A. 99 s ,t h • v , 6 __ N a "rS In U-) ., tia ee 69 e? 1 tr) II it y N ` F II u Ia z= a. 90 x C C OI . O ° ? fa F - V / a ado > c c G ? ?r 6Q+ .. a 16 63 ca V) 9 CO ?I e 9 ? /0.4 x c0 La 3 . 964 , 1 \ 9 1 ?a _ a r n ? 0 c + 9a _- 04 N O J ` a + • Q Il / _ r y 69 6 , p CJ dJ? / Z? ' Gd ?• , " f? i s a _ d f - m f 7 ?? a (Y)I fa - - ?? U co r' hcov .... ?? ?, ?9a e v 1t ?0 1") M E c yg.? S6 -7L u co if II ^I t??w O c Ond 9 Q w -t v>p II c c0 > Y Q SOQ Lr) t InCVNCV ? a6• B -° by O C C c ) d O 4 In , (n u7 II @ u II ? I 9 -? . - 11 \ z - \ 6 op --? -1 a . . r--. r w O C C C c C? ^ \ .I mo, C ; ;>>> S ") c0 In ?7 V f l c c C c c N sf m' V) 'm, ;p . N O V h II If II t,J ^ N - p0001)N Cn IN to 1. II x LO .. w lad cG p > Ol by t, O W cO ?%? 4 C C? N ) Y C_ V a x dLJ ' II W it II z Z O C > O I '? W 7 Ec o m Q)U:r c O Ego m >>> a In .- ? c C c 4 U Q) CN a) 0 c m z: ' N l? W 0 ? tl 8 y L LO t II I ! f m w If c 0 g ?C, c? . Q C (0 c p ??5 ? F- ^ O. _ r Sa C + 13L 0 cQ " j1. -09 v) 0 6 log cQ BORING LOGS STEWART BORING NUMBER B-1 421 Fayetteville St., Suite 400 PAGE 1 OF 1 S Raleigh, North Carolina 27601 C Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/3/09 COMPLETED 6/2/09 GROUND ELEVATION 471 ft BORING DEPTH 20 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL BF CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB A SPT N-VALUE (BPF) A J m v tZ 0 10 20 30 40 50 60 70 80 90 p w j PL MC LL _ Cl) Q J :E U J 10 20 30 40 50 60 70 80 90 LU _ Q z a- _j p > ? FINES CONTENT (%) ? Cf) MATERIAL DESCRIPTION p W (n 06 U fn 10 U Z 10 20 30 40 50 60 70 80 90 0 4 OL Q "' -TO SOIL 470.6 . 0 0, FILL - RED-BROWN, CLAYEY SANDY SILT & SANDY CLAYEY SILT - MOIST ML 0 0 0 0 SS 5 9 13 22 3.0 0 0 468.0 :..:...: ...:...:...:...:... ............ RESIDUUM - STIFF TO VERY STIFF, TAN, FINE TO MEDIUM SANDY SILT - MOIST TO SLIGHTLY WET 2 7 10 12 22 SS 3 8 6 8 14 :. ...:...:...:.....:...:...:... SS 568 14 ...:...:...: ...: .:...:...:........ 4 5 5 10 10 20 17.5 453.5 VERY STIFF, TAN AND BROWN, MICACEOUS, SANDY SILT WITH WEATHERED ROCK FRAGMENTS - SLIGHTLY WET ML SS 6 5 7 11 18 ....... ....... 20.0 451.0 BORING TERMINATED Note: SPT Blow Counts are per 6 inches ofpenetrahon unless otherwise noted. STEWART BORING NUMBER B-2 421 Fayetteville St., Suite 400 S Raleigh, North Carolina 27601 PAGE 1 OF 1 Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/3/09 COMPLETED 6/3/09 GROUND ELEVATION 470 ft BORING DEPTH 18.5 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL BF CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB A SPT N-VALUE (BPF) A m F W EL p a 10 20 W 40 50 W 70 W 90 O w j w PL MC LL = Cl) ¢ W a g U co Z -j 10 20 30 40 50 60 o ao so I - W (D MATERIAL DESCRIPTION > J Z) Q z 1i 3: 3: a -j O > ? FINES CONTENT (%) El 0 Z) W (n o25 (0 U) 00 U Z 10 20 30 40 50 60 70 80 90 0.4 OL TOPSOIL 4 .6 FILL - BROWN, CLAYEY SANDY SILT - MOIST ML SS 9 8 7 15 3.0 467.0 :. ..................... :...:...:... RESIDUUM - VERY STIFF, TAN SILTY LEAN CLAY - MOIST CL 2S 6 8 11 ............ ........... ....... .:..... 19 5.5 464.5 STIFF TO HARD, BROWN AND TAN, FINE SANDY SILT - MOIST SS 3 6 7 8 15 ..... .:...:...:....... ...:...:...:... SS 4 7 14 16 :...:..:...:..........:...:..... 30 ML ..:...:..: 5 7 19 23 42 18.5 451.5 SS 2510" ...:...:...:...:...:...:...:...:... . 100 AUGER REFUSAL 6 Note: SPT Blow Counts are per 6 inches of penetration unless otherwise noted. STEWART BORING NUMBER B-3 421 Fayetteville St., Suite 400 PAGE 1 OF 1 S Raleigh, North Carolina 27601 C Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/2/09 COMPLETED 6/2/09 GROUND ELEVATION 467 ft BORING DEPTH 24.1 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL 14 ft CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB J A SPT N-VALUE (BPF) A m w a 0 a 10 20 30 40 50 60 70 80 90 2 0 I}- ui w PL MC LL 2 >_ cf) Q LIJ Co _I 2i C) U) ~ w J 10 20 30 40 50 60 0 80 90 a U w ? Z z J O O j p FINES CONTENT (%) ? w MATERIAL DESCRIPTION w < m a o ? cf) 06 U c n z 10 20 30 40 50 60 70 80 90 0.4 OL = • TOPSOIL 466.6 00 FILL - RED-BROWN, SANDY CLAYEY SILT - MOIST SS 445 9 MH >00 SLIGHTLY WET FROM -3-6 FEET ................................... ... 00 SS 2 323 5 ...:.....:...:...:...:...:...: 6.0 461.0 :...:...:...:...:..: :...:... RESIDUUM - STIFF, BROWN, CLAYEY SILT WITH BLUE-GRAY CLAY SEAMS - MOIST TO SLIGHTLY WET SS 4 4 6 10 3 ....... ....... SS 4 346 10 ............:....... :...:...:....... MH :...:...:...:...:...:...:...:... 14.0 453.0 1 ' STIFF TO VERY STIFF, TAN AND GRAY, SANDY SILT WITH WEATHERED ROCK 5S 6 8 7 15 FRAGMENTS - SLIGHTLY WET ML 6 3 8 13 21 23.5 443.5 ...................................... 24 GM WEATHER ED ROCK - SAMPLED AS CLAYEY SILTY GRAVEL (ROCK 442 9 SS 7 27 50/1" 100 : . . : . . FFRAG MENTS) . ... .. ... ... ... .. R REFUSAL Note: JI'I Clow (:ousts are pert inches of penetratton unless otherwise noted. Iddw STEWART BORING NUMBER B,4 421 Fayetteville St., Suite 400 PAGE 1 OF 1 Raleigh, North Carolina 27601 CS Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD. NORTH CAROLINA DATE STARTED 6/3/09 COMPLETED 6/3/09 GROUND ELEVATION 470 ft BORING DEPTH 20 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL BF CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB J - A SPT N-VALUE (BPF) A O = Lu ? 0 10 20 30 40 50 60 70 80 90 p [if w w PL MC LL 2 fn Q J m U H Z J 10 20 30 40 50 60 0 80 90 EL a) MATERIAL DESCRIPTION J EL Q z 3: a _j O ? ? FINES CONTENT (%) ? ? w cn 06 (D U) co L) z 10 20 30 40 50 60 70 80 90 0 3 ' 4: CONCRETE (SIDEWALK) 46A 7 . FILL - BROWN AND TAN, SANDY SILT WITH SOME SMALL GRAVEL - MOIST ML SS 3 3 4 7 3.5 466.5 ...................................... RESIDUUM - STIFF TO VERY STIFF, TAN, FINE SANDY SILT - MOIST TO SLIGHTLY : : : WET SS 2 7 10 11 21 ... ... ... .......................... SS 3 799 18 ...... ....... ........ ........ ....... 4 556 11 ML INTERMITTED, GRAY, FINE SAND INTRUSIONS FROM -13-16 FEET 5 898 17 6 8 10 10 20 20.01 1 11 11 450.0 BORING TERMINATED wore: srv crow uounts are per o mcnes of penemoon unless ornerwse noted. STEWART BORING NUMBER B-5 421 Fayetteville St., Suite 400 PAGE 1 OF 1 Raleigh, North Carolina 27601 CS Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/3/09 COMPLETED 6/3/09 GROUND ELEVATION 470 ft BORING DEPTH 21 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL BF CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB v A SPT N-VALUE (BPF) A 0 00 v w tZ Of W - a 10 20 30 40 50 60 70 80 90 O U) w PL MC LL 2 Q w ? 2E U Z J 10 20 3030 40 50 60 80 90 uj ? MATERIAL DESCRIPTION W < z 3: IL m 0 Z ? FINES CONTENT (%) ? (D Cf) 10 20 30 40 50 60 70 80 90 0.3, -2L- CONCRETE (SIDEWALK) 46P 7 FILL - BROWN AND TAN, SANDY SILTY CLAY WITH SMALL GRAVEL AND TRACE : 00 00, TO SOME ORGANICS - WET - CH 00 00 SS 1 2 2 4 3.0 . 467.0 00 00, 00 FILL - BROWN AND TAN, SANDY CLAYEY SILT WITH SMALL GRAVEL - WET 00 SS 2 234 7 :...:...:...:.........:...:...:. MH 00 00 66.0 . 00 83 , 464.0 RESIDUUM -VERY STIFF TO HARD, RED TO BROWN-TAN, SANDY CLAYEY SILT - 3S 50/6" 100 . MOIST TO SLIGHTLY WET THIN (-1.51N.) ROCK SEAM AT -6 FEET = °• • • .. • • = • • •. • • • SS 4 12 14 13 27 ............:......:...:...:....... MH INTERMITTED THIN ROCK LAYERS/SEAMS BELOW -13 FEET SS 5 17 22 16 38 :...:. ........ :...:...:...:..:....... 17.5 452.5 HARD, TAN AND OLIVE-GRAY SANDY SILT - SLIGHTLY WET ML 6 17 19 26 45 ...:...:...:...:....... ....... ........ 21.0, 1 449.0 SS 25/0" 100 AUGER REFUSAL 7 Note: SPT Blow Counts are per 6 inches of penetrah'on unless otherwise noted. STEWART BORING NUMBER B-6 ILS 421 Fayetteville St., Suite 400 Raleigh, North Carolina 27601 PAGE 1 OF 1 Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/2/09 COMPLETED 6/2/09 GROUND ELEVATION 467 ft BORING DEPTH 16 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL 13 ft CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB -i Z' A SPT N-VALUE (BPF) A w IL w a 10 20 30 40 50 60 70 80 90 o Z ? [if w w > w PL MC LL _ cf) co Q w co J EL U ~ Z J 10 20 30w m w 90 w co MATERIAL DESCRIPTION -j ¢ Z a -j O > 0 FINES CONTENT (%) ? 0 Z) w (n 06 (D (n m U Z 10 20 30 40 50 60 70 80 90 0.4 OL jOPSOIL 466. FILL - RED AND BROWN, SANDY CLAYEY SILT - MOIST MH SS 1 5 8 8 16 3.0 464.0 ......_ ..............._... FILL - BROWN SANDY SILT WITH ROOTLETS AND SMALL ROCK FRAGMENTS - MOIST ML 2S 877 14 ...:...:...:...:....... ....:...:....... 5.5 461.5 RESIDUUM - STIFF, BROWN AND TAN, SANDY CLAYEY SILT WITH SOME CLAY : : : : : : : : : SEAMS - MOIST .. ... ... ... ... ... ... ... ... SS 3 567 13 ....... ........ MH 4S 356 11 ...:...:...:...:.......:...:...:..... 13.0 454.0 1 . . . . . . . . DENSE, GRAY, SILTY SAND WITH ROCK FRAGMENTS AND RED CLAY SEAMS - ..... ... ... ... ... ... ... SLIGHTLY WET SM . '. '•, : : SS 5 5 16 23 39 .:...:... ..:...:...:..:....... 16.0 451.0 SS 25/0" 100 AUGER REFUSAL 6 STEWART BORING NUMBER B-7 (s: 421 Fayetteville St., Suite 400 PAGE 1 OF 1 Raleigh, North Carolina 27601 Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/2/09 COMPLETED 6/2/09 GROUND ELEVATION 469 ft BORING DEPTH 18.9 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL 13 ft CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB 2 w ? _j } U) Z) ATERIAL DESCRIPTION p Q J w w d I}- w LU CL Co Q Z fn 06 v U 3: 0 o Z a _j O (n M U a w J > Z A SPT N-VALUE (BPF) A 10 20 30 40 50 60 70 80 90 PL MC LL 10 20 3070 80 90 El FINES CONTENT (%) El 10 20 30 40 50 60 70 80 90 0.4 OL TOPSOIL 468.6 FILL - RED AND TAN, CLAYEY SANDY SILT - MOIST ML 00 00 SS 4 8 6 14 00 00, 33.0 . 00 92 466.0 PO?N >00 1>00 FILL - RED AND BROWN, SANDY CLAYEY SILT WITH SOME GRAVEL - MOIST 1>00 SS 2 3 8 9 17 :. ...:...:........ :...:...:...:. MH 6.0 >00 463.0 RESIDUUM - VERY STIFF TO STIFF, RED-BROWN AND TAN, SANDY CLAYEY SILT - MOIST SS 6 7 9 16 3 :. .:..... .........:....:...:....... MH 4 458 13 ........... 13.0 456.0 1 DENSE, GRAY, SILTY SAND WITH ROCK FRAGMENTS AND RED CLAY SEAMS - WET 5 5 12 23 35 SM 18.0 :.: 451.0 ...:...:...:. : : : GC SOFT WEATHERED ROCK - SAMPLED AS CLAYEY GRAVEL (ROCK FRAGMENTS) .. ... ... .. 18.9 450.1 rXI SS 50/5' 100 c STEWART BORING NUMBER B-8 421 Fayetteville St., Suite 400 Raleigh, North Carolina 27601 PAGE 1 OF 1 Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/2/09 COMPLETED 6/2/09 GROUND ELEVATION 466 ft BORING DEPTH 21 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL 12 ft CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB =- EL o _j cn of D ATERIAL DESCRIPTION p Q _j W d I}- W a Q z fn .6 j v ? 0 z d _j p (n co U a > z A SPT N-VALUE (BPF) A 10 20 W a0 50 60 70 80 90 PL MC LL 10 20 30 470 80 90 ? FINES CONTENT (%) ? 10 20 30 40 50 60 70 80 90 0.4 OL TOPSOIL 465.6 FILL - RED AND BROWN, CLAYEY SANDY SILT WITH ROOTLETS, TRACE GRAVEL >00 AND TRACE ASPHALT FRAGMENTS - MOIST 00 00. 00 SS 3 6 5 11 ML 00 00 ... ....... 00 00 00 SS 667 13 :...:...:...:...:...:...:...:...:. 00 2 6.0 00 460.0 ............................ FILL - TAN AND LIGHT GRAY, SANDY SILTY CLAY - MOIST SS 3 8 8 10 18 : : : : : : . : . CH ... ... ... ... ... ... ... ... ... ... 8.0 458.0 RESIDUUM - VERY STIFF, TAN AND BROWN, CLAYEY SANDY SILT - MOIST SS 4 10 9 8 17 .......... .:...:...:...:...:...:....... ML 13.0 453.0 VERY STIFF, BROWN AND TAN, MEDIUM TO COARSE SANDY SILT WITH TRACE CLAY SEAMS - SLIGHTLY WET SS 5 5 12 14 26 :.... ....... :......:....... ....... ML ....: 6 7 12 15 27 21.0 445.0 SS 25/0" 100 AUGER REFUSAL 7 per STEWART BORING NUMBER B-9 ,AW S' 421 Fayetteville St., Suite 400 PAGE 1 OF 1 Raleigh, North Carolina 27601 Telephone: 919-380-8750 Fax: 919-380-8752 CLIENT GRANVILLE MEDICAL CENTER PROJECT NAME EMERGENCY DEPARTMENT EXPANSION PROJECT NUMBER F9010.00 PROJECT LOCATION OXFORD, NORTH CAROLINA DATE STARTED 6/2/09 COMPLETED 6/2/09 GROUND ELEVATION 468 ft BORING DEPTH 21 ft DRILLING CONTRACTOR CAROLINA DRILLING 0-HR GWL DRY STAB. GWL 12 ft CAVE-IN DRILLING METHOD HSA AUGER SIZE 2.25 NOTES: DRILL RIG CME 45 HAMMER TYPE MANUAL LOGGED BY DWB A SPT N-VALUE (BPF) A o 00 w 0- p 10 20 30 40 50 60 70 80 90 z O cy_ F- w w > PL MC LL _ F_ U) U) > w IL IL U c4 H Z w J 10 20 30 40 50 60 0 80 90 o ? MATERIAL DESCRIPTION w Z < ? m p Z ? FINES CONTENT (%) ? Z cf) c 10 20 30 40 50 60 70 80 90 0.4 OL ??'. • TOPSOIL 467.6 FILL - RED AND TAN, SANDY CLAYEY SILT WITH ROOTLETS AND SOME GRAVEL - : : : : >00 >00 MOIST TO WET :.. ... ... ... ... ........ ....... >00 >00 SS 1 355 10 '.. ' ...:...:......'...'...:...:... MH 00 :...:...:...: ...:...:...:...:... 00 00 00 00 00 00 SS 2 33 6 :...:...:...:........ :...:...:...:. 6.0 00, 462.0 ......:...:...:...:...:...:...:...:... FILL - BROWN AND GRAY, SANDY CLAYEY SILT WITH ROOTLETS, ROCK 00, FRAGMENTS, ORGANIC ODOR AND TRACE INTERMITTED ORGANIC MATTER - SS 8 9 7 16 00 00 00 SLIGHTLY WET 3 :..:...:...:...:...:...:...:...:... H 00 00. 00, 00 00 00 00 S 36 9 ..:..:...:...:...:...:...:...:...: 0cx 00 RESIDUUM - STIFF TO VERY STIFF, TAN AND GRAY, CLAYEY SANDY SILT WITH 2.5 SOME ROCK FRAGMENTS - MOIST TO WET 455.5 SS 5 358 13 :...:...:...:...:.....:...:... ML :...:...:...:... :. :...:...:....... SS 6 10 13 14 27 ....... :..:...:....... :...:...:....... 1.0 447.0 SS 25/0" 100 AUGER REFUSAL 7 SUBSURFACE PROFILES J r-f) LL O O Z rIv, LLB U.21 Q LL M? W V) 2 = Q C) d C) . Z z 0 W Q Z W W O O 0- ? 2 d U v p? L J °wqP¢ W >, d' v?'n?i-W L Q m (n z f- U W Z W O J U C d la to to to v v w v O O O1 1(1 CSI ... .. ... ..?..? LL c n v u I LL F LL 1 - Q ff ` O 1 - a p J c w ¢ J I v. LL IL J I 1 ' t o \ w U \ ry U Z O IL 1 O ? ?D I M co I n W rolU m I ' O a ~ LL - -- --'-- ---- --1 L I J i w < LL m? J } LL I W C) 11 mo QLL V U) I LL. I II U' W W I U) V J0 , ?a W< , 2O Ur 11 U) I LL Za II W v !R Lo 07I 1 co d Z9 v v a v v uY N O V1 \` LLI L.Li \ LLI INX °za 10 N n N J Q O F w w K , K, r C\ rl N , cc v a (41) UOIIOA813 m q b r. a? m rn >; C O q Q N U C 6 W CA G j i 0 m 2 J ? M _ li O W O Z W U .? .< ?-'- z L+- o ? N ? z a V) a Z m X J V) z a z o_ W ~ Q Z OJ H H U U W W O O Of a d m q q e 0 c N •N Ul a? a? m? rnt; c 031 ao a? U C 2x a y? oS S i S a ?o?mm Q E2 W N I = c? z W Z W J C> U d 00 (41) U014DA813 a Q SITE PHOTOGRAPHS Photograph #2: View of existing building, looking northwest. Boring B-6 (white flag) in view. rnotograpn view looking north-northwest, boring B-6 (white flag) in view. ED entrance and stairwell to basement mechanical area in the background. IVLVUI UPI I %-IuZAC-UN view yr CracKing masonry shown in Photograph #4. Photograph #6: View of cracking masonry along the outside of the Imaging Unit (proposed Surgery Storage Expansion area). SEISMIC DESIGN VALUES 2003 NEHRP SEISMIC DESIGN PROVISIONS Latitude = 36.325945 Longitude = -78.593023 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0,Fv = 1.0 Data are based on a 0.05 deg grid spacing Period Sa (sec) (g) 0.2 0.179 (Ss, Site Class B) 1.0 0.071 (S1, Site Class B) Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1 =FvxS1 Site Class D - Fa = 1.6,Fv = 2.4 Period Sa (sec) (g) 0.2 0.286 (SMs, Site Class D) 1.0 0.171 (SM1, Site Class D) Design Spectral Response Accelerations SDs and SD1 SDs=2/3xSMs andSD1 =2/3xSM1 Site Class D - Fa = 1.6 Fv = 2.4 Period Sa (sec) (g) 0.2 0.191 (SDs, Site Class D) 1.0 0.114 (SD1, Site Class D) - - - - 9A,Ot%!x ?'•. .. AM-Or-IUY RWrJOA]R aF YAY ----- . . ? -i0F2/F - ?.r5 - - - rssrrz wr>aP vue oarw mrwe Svor ----------- as9zaxaprY.avrAS?m o LWKK ® 3„1LAPr R1Fa YA?w2 a S,aMH4m sow trn - -?- - s,vvxrs,w oc -,. -• - 1nrtR uc a Nxavr /1SMaMi ?' bipt1F62 ED ??044-r tl FA!fYJIEfM+t ., Aatxlat 0 ? ?2!„LAIF suvx p6 ea vx5r 6o G W1 -p-..-u- - 45!12 -? ? ? VIX%ild 4dtllE -/- - I - o?ema+u m? ur e sns -x rtvr .. salrrvav II ? / h / M a /+i >t 1 l •16;±? ?d 1539 ,? 1e a e /0.1 S,1 / ,e•lN,101A' CQn-rnir {w ??11 ar y >"? ? ? ?a p p P// `? l 6 `? , / ?\ «! J / ? ? P v0. J 1 1? eB ? _ z F aw.AlaSiwtn:v j vxeu'+¢ erot P.NW / i 1 e?m? f um ve ? ? SURVEY WTEL' wvL iH4 YW S A SLSAr K AlNMK Av Ei5114 FuerO a I][0. SLi.ChPS 9JL4 AS A Y.IC1R4 MG W YA? Cis 61gi A B7l0Mi 9.115EY. Wow 6P Te F +7-m; 67Af Pill 5e(pgp r 1 FreemanWhite wx2xw. 0.a vnarx wnaF atsE] MEET a s¢E 3numn x0. murfS S,oararK ePave eA>in5c w5e 29` L5lrnx YELL taw80'0ma i*aara?ro ? 8815 wd(2ek&d. aoAO Anxrt?tx?s AS 7eu AP aaaazn7t 0.'0 sAr2r aµvw?sPwv7tn eib lAS icu,l tgAPP.'B pCA\O BC UtN?ULIfxH Yx,VS ttar'aYe, NC282t755R3 W hNSfft'?51aln ,uhvwrvnrrchrexcSaa Yar rAlslar ucAms L2m5a rrosaK eArm aum? lure oaox?n wPrAnma 1112 vAi nnc a,:is sreh.w 704 b?32237pl? 701.828728 W 3i07E5: LftArz 9JIfD Iq 90. LOG>'15 0RE Fi G4 9E 6) 515 Y1}6nnrtt A4Y FKR MIS YAY %46GLffiD 5fA R1L 0.'0 FD]PAII 91l[ 3/AaE I) SLS MF Q 9.dAtt A A1Y [A4MLYI3. A'%kYECti p RMfS f-IAClF ASiS t. are rs toealm w>H w lac lna ewUoO wE¢ eusx P?+ w wrz ff n+s wx .la.aP el ?P,i P? M ff 1?? 4S5 YlP !-0i 2tMm6 W w N2A 2? 0f A1Y MY34 FfE(Y KA riurs A>E wn ffAnrs ILIf$ oxavz w5n I tP 1Y rmnsa ff PA37Gt9, u511F0 wr saw AH warwevn ar oA9m 1455 S W n A 0.01020{AS SLWaF%W?1NAgYby L?? PA,FL ! Iff3 Efi[CAE A%11f, PC01, N50 3-91 YN JYiCiP.1W; PAVk 21i1i f1rt4SE M8A 10. ]OA/. SEPI ? 12 G`dEVi tlli3 MOf AYhN Af LIC WZ 107 VIVff IBg GAYC I LuAms r r<5 r:? new nPnrna 7Vq km1P nawi7sA ? 0.??,F wmI Aaxewvu I, scvs ruwt awews+ ,m5:lw.'dsf.SdL.s Lite.. ° i frl Meer ab'e -(B)0) 637-0652 1 Roves D, gy-(10)452-2777 KIA Wk. [q-Qn7W 1C-(M)71o-1t2i ? Granv111e 52)622-1131 E ? .%- 6'av (zsz) m-m:t c Odv] 34ty WS! - (511) 60.3-2120 C+zmde ht? d C-6. b} x a J?M ? par s4'! ? 1 V .;r16ir / o iA,aAV 4] n ..?`? 3 f tz6 V t .? }9+55 4x:61151 NSZ`? ? ? 2 ? g ? f 1 i BS ?d W yy. yy I S ? 1 ? f 'y 1 & Yr BE ror ?r wmtP.i q_?',,id -_D •s,` 5 Y /F 1'n -77 + te ' SiN I w' PA Sri 1 wrna? Cra celwly, C-t I '6.TIXd-Prphan0y0 unw ^v+ Gron]'vz e LEed!cd Curter 1 " •- {.a d u.AaA? ' &a d Lodge of N,Q ,;,!5 Oeed Book - Page .* a 1 .ax a ?,u? ? fi:mv M•4M/701Y MVV.n P2+Sxett?S t^F•I 1010c.EN.sc Odnd, W21565 13 11 .,- " EMERGENCY e ' DEPARTMENT a? ? A a ADDITION, BOILER/ GENERATOR PLANT AND ` RELATED PROJECTS Oxford, NC . W92pg ¦ 22J.%,VARY2010 VIC"TY LEAP. NOT TO SCALE ]? ?&y Y ?l i? n y ( pk /ALE A or YAd , f-741 drexntry ¦ Nva®EW &htt wtry N YICP eddenda7rat3irs SOLS LEAP; HOT To SME CONSTRUCTION PLANS EXISTING CONDITIONS PLAN 0.arAerter • CP-01 ?w WADBNICLE LEAP: NOT TO SCAM LECEM d , NDTE4 - - pwAnvr t• EXSTL40 ER DROP OPF ROQ KUKNS LNI LT[IRE? Ati9 N SETTI M g9PIFd-kTY F v P aOLKLOMSS A SEALL OUE FOR PATENT 11TE n E'UE Q R nR tVO XN WSE TFUMI N=TA0000 SSS?O NWE FOR THE FOR ATION O OF THE CMCE -- -- v-- °"" OAS ----------------- -- FreemanWhite DdNW AWAkt Ll EAa,E? PHASE 1 NOTEs S pxa. arm s»r . t. INSTALL KW OOYESTIC VATER d TIPS LINE Ca'.\ECOR N MITT OF NOS JUT 8bI WCat&hd u tRS. YA'4V.° PAiWI / _ 'MST LL ?TTTR NEW k BA WATER & r QS 77352Nd, NC2S217S5.°3 2 .. .- - yep_ pp? turd Hi1b,A'0 1 INSTALL A£f ESRTO 1C u? f LINE NEW MAN N COLLEGE STRUT. 704 5232M ?- Q WASE 1 AW / .. 4. INSTILL RGROL FR M FOR OR A£1' ST ENERGY tOR M4L 7C4 ,623.2235Tmph? c T STORY tOLO 1. ROORECT SAMTANY S SAVLRY SDJPYAESi Catamt 0T HOS.'11AL "OUCH BLMA xtAa P Aw h• >RIX MIS I A AND E 2 at 1 10 FROM 2 R F MW W HO CAPE 5. k"DL iPA? 3 aaA 'V REDRE YCT 54? S44 OiARY SEYSA 1106FlTAL k YEDG7. OPFiOE OSlAR6 70 \ 0, C(f E45r W-,,,. /{ STRJOi ltlGtiC LOT B AND PART OF PA44R0107 A ® OCSP.rI P.'AON AILS \ fl1A5E 3 NOTES T{ F. BEON Kfd(POR NEW N D4M PLANT, OF NEW LO SEPI \ \ & CA' CMT tAVA TRIN L4 UC1%N OF 1T'C LOOP ROAD !.W Pl,?utiC LOT A PtOR / a CUSIRUCPM N PARxNG lOT p3, (' ` ? pNSE 3 NOTES xmw MET,- f, -.? CORNET 7Sf LOOP ROAD TO EV51NV ROAD. DYERi 7RAfF1C TO 1 LOOP a•,xP ROAD. Cp3TRYOt pARO%0 LOt p3 / ' yD „LASE , ROTE Granville ruY. ?Bp?., e..e ,.,.,. Q-0 p? / •' I F. SEOY HOSPITAL ED ADr R CUSIFYIC7 ANSWNCE DROP OFF. V•??•b°- A \ a COSTRUC7 ED ETRY LOOP. tCO totON5t > ? Dtad,NCiTS65 PHASE 2 Tim T0z EMERGENCY / ?G a Y Lir.Rrg00 0-475, DEPARTMENT 0 IMOT 9 °*> ADDITION, BOILERI PHASE 1 GENERATOR STORY • y PLANT AND RELATED • / r / r ` `; ? ° ?+0'' , PROJECTS f' J TA " L: Oxford, NC ` LOT B Pmiectm"b. / 4•$ A SATES I? , 10.70 1072, f A &-a Y" STORY PHASE 1 s'?A S c 1 ?1 \ 1 r°??" 1122JAWARY2010 ?,: uzzz ,F ,::1-I V1V?,? Ir LRAWIEFAIMY ORANYLLE COLLEGE SCENTER T 957E 1012 1010 , 1010 COLLEGE ST traAnty uu n-LEVR SR<X WIDNO IC - avd Rd X 4QOEIV / C // .. _ PHASE 1 t AY t cleC?d A o .,' •??, 'y?, -- rilllllllll't da?aiedrrdwkm S l i Na HALE DATE ... _ I ....... i' z ? t BEC ;..?. L07 A ? o NCSR 1539 El FFE31 sd PDb1k a/n9 + f ++ 4PHASE 3+++ - _ trn ?? I + + + + + K { ] " - _ _ - .--^ vg CONSTRUCTION _ - _ ` BtF7 - 109 PLANS ---------- -- ? x PHASING f/L PHAS -1 PLAN W?7. E7 T Or 'Ile County, N.C, Oxford Orphanage SheetYu,W P9 xPL Granville Medical Center CT 0 C 00 ed Book -- Page Grand Lodge of N.C. s 13 p07,1p' CP-02 xvc e u do a'xe r . as LEGEND Qd / o - _ _ - 0 GfNENAL DNOL nON NOTES I -Nr . - pyAV yJrt-p-Nr 1 CAY31UCt0e 9WL 1fAFY NM THE IITLFT'f OMtA Ab] HOWAL WT iT IS TO DDXXM OR W ------ 1muE -" MST" AWON U £5 Aff E piCpAYIEM W?ia OONS7?RUCnOH D?a? R 0 2, S U NOTPYTEAKITECTATQV- ---o- - - sR?'a SrW RE ? PaHrhq 1 OdIXRAN 9Wi OCQR H RLlYS ACC[RDAO TO TIE FreemanWhite --o Nwr sASr i Lal CONTRACTOR'S APPRO14r1 FliASNO ILA4 AND WORK SCHFEAM1E 4. CONTRACTOR SCOT. PRVhY A YA:YINI OF 4a PALWS NOTICE _ n AugOUtiOE+, ' 1 TO HOMR/1 PRIOR TO DONO AYf %QRK THAT Sal pSRLPr 4845 Pd 0.% 81W. G? snvutrx aour an f 9Lafl10 ?? I NMAL F*SM7& OPERAVOn5. Lharkta,NC4821T-SM OKI 6. HOSPITAL W5I APPROW CON RACTOR'$ PlLl4M FLY. ERCK tp1O _ r i 8. CONTRACTOR eWL YANTAN ACCESS TO THE EXISTING iETAL 704S282S05 ELafP.YO EAST OF Ip91T1L 7. CONTRACTOR 9UL4 COPiD;HAIE W1H ELECiRCx TANMACTdi TO VwAN E*ST.NO EIECTRCAL COM'Nscz N 70 THE Y NR9 AC¢Y ' ;? W91NNO. ANO TO 0001MATE AYY F¢TOCAT W Or TM B>'VT°laT EYSR.1 EIFCTRUL FIRM LWDEll THE PROPOSED EULM . a cafmcTOR siE L AM YAw N NONffSS k0 ECRESS LA'OSGt41A? Aomss AS wuL As ADA ACCE55 TO AIL S fl AO. ?A'6 t: w¦x RTf + ;•r ! / R AR]1L ALL PHASES OF CONSTROCOOAL VN-?VN LMR]gMPGILP UlS J/ gSEPI •m? t>wr xsvrtet ` 1. Fearrcrm O ?C65aix 9]ial \ o ussyv ? J L!A Iltp w1a'r',lw"Aa%1e'aw tat ,? o ru - u e e r uc Q??oi ? "v '? ara E r { Y ,? a ?Xro'+ GCiN1Y???2 I-A r L MIT ??4tiA •i 0 I '9 r' ! -- - vnTr ucroff?mo / h. ? / ' ` :.." Gr?Nedd Ceeer asc xauml w ? mvm / ? ,? , Tap FH / ,. 1 Y mt\,?1 ?" P EMERGENCY (NOTS*W) I DEPARTMENT t us1 AsA TO ec aTAea / /,. , 1 e r / AsPPaI ADDITION, L/A BOILER gl1 `` uscauw auRWwx nusO yd? rom¦xx ,1 ?a,' ?' r Lat `` / / STORY / ac GENERATOR ® PLANT AND rer. ra xOUTn rOS? ?;'°° /1 a '?pE: } ' /' ?? RELATED ---Pm.uruvaawewa .'f? / / ::'R ifs % PROJECTS W A nT-4 yip, C ?' o? Oxford, NC f _ '\ x SATES 126, 1a70, I0.12L?IO?? 1 ?plgj ?pryPl S G Y._: STORY w W ¦ $;40200 // /= - ',S,S ?4 ) ago P kROS q Top Fli > ?' N4RKE4 j'?° ? ns¦p ? ¦ zzaAtiuARrzaao Flan-470.1 migw 's A Aro wa Tw.r i / / 9 L ® % mmlw? Ern rata a»c Eesc aalrr art T}_-' a wa a? $ &?9 ,, s 4N Orel _ j , \f I nu°sE°an aEma - - ?8?.4ts5t IN A. / 4 iaa?[avnnr ? 'T? _ _ 7NO e / 4 / L \ Y N W ?' = - rtwx Q 1 ;4l?sracE "lift ;0 NO / L/A fj",rs.AU?erao}- f I 1\ - I 1 ?+: k C} rE gyoi.4 ti ar«kz WSxA+meWfl1E FAAnY ' Ccnaele .T ^'CUwete Sy W J ewAER?AE, 4t)- 4', Nqr p YEPOht P.A _ --^ °1 prn1?°'•r„ 1 ?•` CAAN\11E uEOax CENTL4 i a 9117E 1M2 - T •., xk„?„n,.,"• a I0I0 0 E,O, r I )I 1 IPAn-LElft BRtlf BUW.\'0 frW.) lr` =- s aanl Rd a K ///I r Icuwoew aeOtd by / V ww?r,.,. Y TNC W wax xi ¦ hCP yZW ? H?iTm //I IbW ¦ION I p(/cT] ``?\ (??/,',"?'.' 1: !I r-A Ego 1 WLOGV Bdk,lddf[PAikfB // j? / + AspPdl ` ` _ - u(Ne it f0. Mp) Pu:i n.) oug4 89W 194r W-f6 V NO HA1lE DATE I) aWLLO" Pahh9 \ ( 1 j3 t1A(Fwh Lol R Cj •?+ l ELEC \ tat u 1 ( 1 1 / N C j ` IpFEY i? pm, ?/ x, d 7 ASWLT / I ]a0. k P1111a .} b ?- ! 3c?RWRO / WRm R dR 41 y Q / m FTa[e mtr 1 5•rk h t 1' ?.1 lu € i h tr? / LIA L! % aa'Z W Lqa L N bHm] LVT p ? Ea,w?E 1` t WPER,? JI` Oa, NCSR 1539 (IV Public 0 CONSTRUCTION ---^-- € ?? xo PLANS y \ ?T'gwaTV T DEMOLITION - - -= a - _ -?? - - - - ^?- - ^ -- - -rcrvz= _ -? - - o- - PLAN p TJI{, Gronvlle County, N.C. I Oxford Orphanage - - - Px NO in Granville Medical Center KalJ pmwo[taxa. Deed Book __ Page Grand Lodge of N.C. ehcel Ekw457.43' CP-03 ?rE a ? 2? LEGEN D. NOTE WAMNAKE EOML - vAaarlrr o e auvrv MY m ?,Sv A ? a? iiR l?a'oc r rwr-w-uY rau Irra rrro»rsarw awvuLec cns - - RUA%7 RMf-a-R1Y OCO®gY6AK 6Y H?OG6?A1E?my NO Y?59.9 KR6?".ArpE IL4F?RA4?a?k§r ?. - - - - - - - - lOl3H / i ? ? ?N/ti'.r ItA9R5 W ? f?J40 R mr%n aT?+o?RRfM'h3. u IEIF. A3 ElrteE2 M>rrPrA`SE -- - oa77.e ra7aa,waw ?Po ,,'?/ , x rsaro 7sTU,p4 ASOnw.9asarxfisra r. c«arHwrums ura vosaa r -----------------"" FreemanWhife eaaa wrurs AeACaw, ,,nn ,? W OUTT r'r m?i AYUAA[A KT?E r st: romam2ra?su''roisff 4v s?3Y y1n EYr RI" g asw7aATaa¢rF nua xaaax.fi,w WA rtsvAn 6r cc wmAnaA ? uWreAw / l Fssienvnrnq sm,ss°wts's Am 0? TUBu cw x uTa etvr rur ntl?snw. ar vxirwm asAr Ar 8M Bd 0A ILW uxx l.c Q l /lr / ' '\ 6cs wx furRmman_cra ceoa ? rrmoa?m erFarrw aw ar?YrA Lh'j0t.'Ncmjj-55W ra um m r ° /? / \ mnwevn mwL x mouae KS mxe a n a u w z a a uon a.w smAt a Raa 704.5237237 {dam raA?n s'3 _, var£[mtn uattura swxPAnvu PAr xora w.vsosa TSnlmnrt } / / ...:--•"' sc3N a vrs7uv nE ro x avsD xaA.a a 7 01 323 7233kr ,N \?'Y? 4?"':.::_, \ ` nulsvvr,w mwua sW?crxes a srmas7o€smfVre w.rarw+rve,w An eexr r wetly r>an er uors awsm svscWi 4 [I>QP 1[MP 1 a tThIULPR 9'All AL50Via,W Mt55 Aq F496 f fbPA¢S to RIYACSMI6 MfffilM? YALL H m nn x sv/our ? IX:E ! 1 7Aass u ssu.s 2ru,s-B W ,u s.ers oA?HS w 7ma9rm r+Aww• nc a.r rr+a swe ac ,ae?oo a uwovrLOrr \ a two wus a ooceTaA vnw,sACnsaxs avnms?v aTeu? ras?srou ?:_. w.6xmr / ?? r? ..__, arm z / 11 raasw ?a?>ic'?a??r ° r? , , r , ?? gle2srutruraa0u.i?eYfn,'?0N ?SEP o c / ?/, ar ®oae+tr Ar x2 3ti ? us vur f j / J 1 t t^'a ? ? { umm a re?.en wu er ?c waa,m. w g? us srim /' 1 / ?,// ,/ ? f -L/A Vit \ F r tRAP DRA:NACE AREA 9011US 0" REV TOP 0V 'E7 19FNtE S7 AEE AREA Nr1R IENGM 1 034 Ac 3%I6 464 IS%b3 467 612 ft1 436 Ft' 4' 2 0.K AC 7.15 436 ,3x37 4Y7 612 0' 436 fl' !' 3 O.:d Aa Bd9 451.3 25.X1 455 F728 fl' 7,,66 n' 4' AF.45 wM kl1E BYt GVLl7D 6f PJYJi. £ami6 [ .cvn a ?7m ...!]role rrrr lea wrswurrw e r G Y e.ms vtx,r?Nan). 1 4 n . eo,1°B W 1>B 1:f 4niuT ilP Fipo , FRI FA 1ffi 1i?i7i u.+0:sr PA s1!aVUm1 n.KrcLS of ,E es a ? L uu °lAan KCeiu 4'xI?WE acYN A>a4 YNE GAi!?6Sf >LL BE f£0W.0. L 1D6^aAAY ffiA3 alLL1AW K5kN1 50.-MPR 2 uc4rts n.'L mWUnY tFY5n FoR AfTRmaYOAE YlN 11 GK a suc sralu.3TSN rrow ,s u,amAT OAr2 A -Granville e sn? // ? ,' + a 2rryAmr s ma 7w nw,w rw xmemT p _ t7 A///` / V p1 I tsWHnGTVH11mPAV60 /rYA4YW115 fAK"•"v •....• X Aa0 // T t 11`?y / J 1??\ 5 YfiA WS[iYM11 KiMr#S N4K Ifa1kEMYGE.AO V/ wnrarmns.? ,?. / / / ?P1 7/ {5 AUCCaS Ni Dtl 5 E NLtt ??W. W.. r. ?.?.. res. asa ua omra / Q-?o" / f ` f \1 i smMT? w's'°c w?i•?wu, rwac.a tGa+an^a?F.'Ca,'a BMW sauv sFrass ,63---- PA'R.OTWR Y,JOt elC a? / o ' f , , 1 IEi6p1AGt O'.E?`P1 GrM BUFFER DISTBRBFO AKA Os6a6,HC 21-%5 4a rav. o>,TVn vwA ?C s, ° 1 Splnl A 1 I- 1!i 2 0.51 IXC69tl4 VATTM1'D ................................ 111 vaw. xrrDrz aJ¢g / Q 0 I / I ZONE I EQFFvt 5 KHTM 1705F a12 AO 2Q.E z ¦a7ETx 4M g (aro A EMERGENCY rwr. ser. wsmera muc ?„ ('o ! DEPARTMENT ? T? ADDITION, ® 7RS. e. coo oa x rv exm. r?ymos mrza urrxa ?/ / u/`,_ 7 / .•'.? 1` ?``3`??? SVQ) / GENERATOR \ t PLANT AND xV¦m» t ?' " ?` os? E/A}t/? RELATED PROJECTS ` ter. `Q STORY MCK F.,o.a a - ?, I 1t 94 l rNPAYF 3 / % e0. } ` 6S902L'3 1N 9 / iw,3 f day +WTE6,078, IM 1632 y ? `_ //6 I j 1 ?, ¦ 22JMVARY2010 f2i£` , 8 <•iW.a:r / , ? vin, 47 aam, ?t t'' e 6 -_ x.7,1' _? - mo+-,a¦C?r??vAa o / e3.".cTaaa by ss ¢iK 4P / E/?A /: f , , r u1reJ .. v-13lTQa t;: 0 4, l 7 tl "2, k.c. 3' dmn , s g ?.-1 one 1? ? { r? eTA.VYYtEFAUaY ? ?Lr ' ?-xe«i? a ' ' ! / i ¦ Iwavew } IlEOQYR PA t CHM EUMMCENTER ! SATE tO12 &eCkWby Y 1 \ IMTt-MlE OR-CX HADNO ?Y r:i - - p?,? Rd/ 1 ¦ 'r. J / / ..:.:. t ` ?I`??-_ mid ?sreTaaa rr !/f 7 ?LELI,rt wtw? / edded.I-4skm !/ U _ 0 1s r A - t? .J ?A I 6-8 ?, ? ? Tae esal , A ? ° NO HIDE OA7E $ ? 1 OTA- ? 61y? 4 } t/A \I - CONSTRUCTION / /-CS 153 7 t . d° PLANS ,..?- 60/PubliD R/1?4 SOIL ER ?/ _? - OSION -- PLAN 'Gra 'lie County, N.C. ¦ CP_04 `sz P%Nd h GronNlle medical Center G7ard-07 honogge C-" aC0 't0 ad Book -- Page J Grond Lodge of N.C. r ` ?R fle1Fi57.45 Dna sx 6LOPE6 WON (ID/Fi EASr or E0T B p 4 LEGEND Qio? ? ?wso aWaPAamruvn?vusacu+AAa3n ??weufa nmu ... ,--: ? . ? -. - _ esfrA ??a?BI? x fuw W sut c-c: kxsw arr rm msPCSSUN saAP?- n?.Ow uD GPPtA F••"" ] 41E IgIti010YWE5 A4] 4CViP IRl BC IaN4P?A?016d10 IXSM P7Ali] gtlP. wA e19 Ot,? = n?31w?P0+X/xg?Wixxu?3.iivi?Aw?ie¢??E A?1?C70?VGU1 g! etlnk _ ra.n owP ars & P6vumxs¢90.EYLOa3xEP f6CNOPxO W FreemanWhlte "' «- - - - rf?P.1EiFAp Aiiii d I , / .:_ _ X31 W IOG9L 60.4?M V calf ii#wmlOC U YT. WUL m" PA9a49NA= .]S P6ID.IGYr ORr7S>uCi \ P:iUPlII F.PiGP? Pa Pxftwt Fll PiW310141 tEMfK-0l AC PARJ3D PA9UL \dr} - W3NA4ff?1 1fl140Td£YY-AN-i61A1 1.E flr-V7-ml] RIAM 6Nbtul $U5 Red 08R&Wd vrvP. crn:EiE -"ONE HUL" o ' vpx iM Charm's. NG 282175597 ® PPS'. ml Al1P - _ WMSTI U[ fAMFV-47 ------------------- STORY / 1:? '. iD10 _,S n. ?1 ?` 4 1? -ipi ' Y ms¢ PMO . h ...::_ . 7u(E ` PAR ANNO ..:. LINE T ABLE LWE LEMTH BEARM Lt 4M SWS4-GT Le 100.73 SB4'221b'E L3 27.76 NOMWE L4 lain N70'07001E L3 e2m WT5454N Ww fAaQVI fl7:p3 Q- t AV 1143E a) NI 744.5232200 V3 - 704 $237[331.. ?tP nfffAY m eP7aR (ir} - CURVE TABLE [\17H? 7??JT CL9iVE LENGTH RAmt15 rSE A ? J p4l 145-01 E43P9 / ? k ISb4b 2a7s7 ' oo. \a f e d cr ' ? ? r 1 c r c 4gNAY0,kW J?r?``O? .........._ ? ? ? / a0.1f0flEPN ''J? ? (?wa'?-mb`'? 3019cmeTeu f otw,nc27565 Top FH i?.r. ` .r '? ffiTAVTA4C0 E3ev-47r. 1 /7} asACeoWE EMERGENCY _ r r / 1 xa.PU?rom (N1T Sw} ? i' ? c 19x¢1pAYlq DEPARTMENT "?,3 Paps r ?e ADDITION, BOILER/ ONE 41. %y o? STORY ! I ?7` GENERATOR PLANT AND / o to RELATED r. r t nT ?L W C 6 areA PROJECTS 1 \ 0.101 5 A4P 6E v?" a-14 ? y4xi. r r art > \ - mo a ? oVOau a Oldotd, NC ' ?? / u u tfAV?n g °`RW \ ' \yy r \? = w, lEn) ?, A?7ttv]? 9A1LS 1032, 103Q 1033 ` a LOT B i?- y L"71 ` slonr " eSEOZOO ?® .,6 •' G,r Q?? ,t data a 4 t ? ?0 TV fm " 22JA'.VARY2010 sl'' R / EHw470.1 d' Ate" 1\ ?' J ?9{ • ur -` ><?er7? ra j/?1 mu 0.m-RS lre. seau "+ xV]A'mm-u4ra}.` fl ?lx nua ejrPArm opt > e erv. vrre 77u / ,V/ 3" Y ?_? ? 3690 r \ ?rr ? ' (I / ?? easmnnl rrr ' " }}J?a i -_ uAsw`Ea 4, u14 ? 1 ,'oruY 6?p?•i JI ` r'°VruWxw1N0PS?aas nn •r` , °' \?b ( - Ir1?1 ??I Y . cmetmPn i-ryq?y Y3[STVC12391ATAI DI l / (ol lr `?` E4 WF RE NIA MO 4+ l \ N6NM1%E F1+¢Rf7s \ I _ /?C AF "tRN V f 9PF.1NX WR4'E ,,......",..,/ / ??A: SEAL C-897 day \ 7 a=- Eatwvarnvr (tI] ; vv lv WMW u P L.. `' ` ' ?. (AA\Y:13E YEDCAL CENTER \ \ WTE l012 ? , , . ?' a ~ ? TML9 N80-1• Dsvn''"vim' WATI 1010 muEX ST \ a n Yd 1 Ps[-?.'t.e ?? m -LENSL SIR" f=-" Ffl0FQ3ED &q,* R& d-- / - -? EIkAO340Y \, ;, :,:r.. - ?v. A m-u a amin° i u 4 .x I lvda wr„J . ICtnT:vr=w // / y11 CEPAHTMWr \\ aE mu ?_ Ps AF d T v 1, f FW YT v ADDIIfON \ \ iWfID ?-t/?? R( R( v „0.f ¢! A( ??R [7Wl'kN by `?1: ! \\ ?L fi.••' --- t __ ?+?I Ij4 Y R A[ `A( 6WUi 0N20 a WGP No U&ME \\ 1 71 `xy?• ac edd 7afreisE? `ri? f jl \ ' A e ?I P v6JL(?u,a I ewe s¢ O3 A Ts] 1 U ELEG arMil S E°nTAir t S . swam omnr o+- 4 (TrJ I x U 0' ? ` ??` I-I' rr?o WUre?3aAns rcA ? r?+ T• tP 1 .} € a?i, (mk ? ,r, d0. 7? r ?* r 4 ?'. PANVP?sxrrov°?{w'-°.? I tar V`r I Fl = A94kt ri '.h" a -a \ / 16 f?l frol d 0 0 f S1 rr/` A f[II[':VT\\ ' &( Re A" Af C'jlb / ?`1"??4??\ \ r• 1Ss t7 ? \ ? F9 AS W R ( n, (4a,e art O D N rr? W1L'LT t P ?. `''-? t Horn W PNRCAl/1 r^\ v rr ,rr a P. _ i i 1 ?. Fu A oo '°' ? (4 v r>m, CuK AVIa \ ,` a j >p! ? - ?,/ : `?snPA ME ?. ` nNP ?\ , ? VP>p we nr t ? n ?• ? w' 0[w L p- }} la3nn7ixe aw / A / ' ? t1 1 J _, 1 , ti?~?? -- •C??,1 pu ?.r ,/ AWA IRIr.O]RiW1I %} 1 ijN- ZCm9 13 / - \ ??? 0 IT?.m?na NCSR 1539 ? -. ?.- V, om sPm W Aa cm Pan1Pr I BU,F ' C CONSTRUCTION ASP1lLT PA1M BF f1AYl?kB O[f10. uvaeau 1 xd PLANS ('1- { Tap or Td?\\?\ 7g LAYOUT Gra 'lle County, N.C. Oxford Orphanage t* Ha h GranNlla Medical Center "` of C-t. ed Book __ Page Grand Lodge of N.C. Sze na ba 6eti•457.45' " CP-05 Y71E ? H ,10 3UiC Y .• ]1 -. f ....? ?? C FreemanWhite __ 'F- f f tt? /j ?PaYtq B845fiedaat8,4il. a , ial 7s2730pMra? wr ?. moon wn ?r ., 7 RrsEpi G p?r ? vaasrnn rx an rro xase uun r?, ??J? ,;?? 1 /"?3? v v.. we rw i:'w''+?saa z weIrt ummara a,v eurs?ccruu / (I , `b1• a . fi.FS?i` awiv are AE aE mtn rc smaor? \ a >t` //// ! Lasro - 1sd?dt ,/,F• a ro'a rknu ?nrs ma ?ou?erx rxa ?runa uu ???1',? j? ( t V P?`"g r ?„ f ?'?°?; f mss` ? f ? \??f > tat r?,relAsl;A cfr&r.. :, ?? \ -- s6lococge5t o ?z r?? ?) 0 ?? i tn.;. {d otaro•NCZ7s 4-3 4? ram EMERGENCY E1rv-AO? DEPARTMENT j f Pty f ?? " ADDITION, BOILER/ GENERATOR PLANT AND RELATED ?^/? ?3 } ?t r f r a, ??+ ?, ?`, J V ?• 1 t t PROJECTS 1 " Mufave t5cv. If _J ( Oxford, NC .- 160 / ? ? ?? ?t s 1 ?'? ` `SJY?? t ?s, ?dt j'? •//?? ? `vi , yy? 1 ! 1 da's // / / ?, a< 7t e.,f '? .._ c`I /? `1 F _ - tl}• ?, _ 7 i rf ) ! \ ¦ 22 JAAUARY2010 r 1 a El 470.1 . 01 ff t f/ , }?? ` ?? ??? (/?P ?''? t1,'????Z?, f"s?? l ?' °+ t ..6•. ?? _..1 r? /" '1! / 7 'q!/,4?Ihi ,RAF ?.4 t 111 !,, ... I ?.N??????% =1 ?Nn??un?xy2 t \h Itt 1 - mu ? ":y y.C }t { Y _ 1(4ADEVl ??F 33 Z' 13 /f '? e t, ,.nrF ! 1 addea?rreris4Rs NO NAME DATE Raw eai v-. -? f. /'. / / ???",?'•=11 ) j 41 r / f tl _ JJ ?{5$ p n i4 ,-' t ? r.f ?rfJ.i .-.. ?o 1-7 :`. I,\ `.... 1 _ liGl?=E lss/ 1 f { C k T ://' f I<_.?•?l? CONSTRUCTION " xtno-a r V? 2 - 1` vJ PLANS GRADING OE PLAN ( ft{k . r \ aK Gra 'Ile County, N.Cnt. l bxtard"4rphen c-p K N.0 m Grannlfe Medico) Ceer F- c r4r Cmuate ed Book _ Page _l Grand Lodge of a.eC. rP.0 r 07AV v ?+ rxE e u m x4e r • ss E;,1 C`s LEGEND aa1T-OF-WAY - - RARROAD MGHT--L1' ------------- ---------- EVSTNG ROAo,4&VFWALK EASEMENT -? --a- SIORV SEYAR p1P£ CATCH BAS,V O SANITARY SE%,ER TIAMME P SAR17ARY alIER CLEAN OUT O SANITARY SEiIER UNE -.--- -• - -? WATER LINE DQ WATER VALVE ARE Nrorw7T vffl WRIER METER IIECMC BOXAMT 14 LANDSCAPE LIGHT' '0' PodER POLE GAY WRE -?M?---•M? ----w?+.-- OVEWfEAD POAFR LIVES 1t COUVITNVCA770M MANHOLE 0 CROSSWALK SIGNAL 0 GAS SIGN GV W GAS VALVE 9? aks METER --.n.-..-c-- --c- CAS LWE -- --?- UAYKR670INO CABLE LIVE - s ---, --+ UAYTERGRWA'D TELEPHONE LINE .......... . .................... OMAERGROUA'D OXYGEN LINE IRE"c w n3eACrAr m f ? - ?, WISNI 61f9C ..,.' 5, i I ita w65 ? I 0 ??? ? ? fnlrenau I , s, ` rN ti102 ?? `? ?, GR f{5110 L04[i? G ;skit ? t? •? 1AII11 LrH,L 1' 1s LUIr)11vC \` M4 E';fe S 10225, 1030, 10' sT,??Y i ;' LIYUK - 0?40? G0. -- 'aM ATLKFYI NIL Ir UTUTY CROSSNG d OWATiCN AA,BPA IW VT1R5 epr. 57x. DaTipi Uu1TY TAP. p .. 1 a' urtA wE a3s25 se S163f K525 x 0.64' SW'aT KxN Y awcm' ,SSA, J ?1!E 1.3L6 Y S x? , V u 41eB I.N41 ,37 s pCa'W91 b 5 i' 4>Q lK 15116 r ewbl KSw e a• ura I# 136K w* Sm N1V2 T i' Max 1PE {6111 B' SwEW! a,. ?. e a• rAnx ter ,x» r swww wow 9 tr SSOifI Kali ' tSE ,SSaO w Tr amei 11a2s e u? we ,xim 11 a' Sn1T.ar car. nFY. MU k 5 C'9bF MSS. 51EC ?SG1. 12 ¢IV swx Mx/ a'ImL , w w 6' R1fA 1AE 15356 m IV swu 16461 ,'fltvkif ,6565 r6m51 16361 u ?swuv K6ea rsma w6e+ w r sra? 1e1K n• swum K1m n a sulraa< Kara Y s1a>L Knse I'S+ldIAPr ? tY imd K1Sf n Y SWaI wu ¢ Y SM¢fAif /9IJ7 m ,Y swBi Kau r a sewvxr aslw 2' +r sra6s Kses a'swTUr +y>t n r swa Kass a• swTAir roses 15 I6'sma eN. pa.uuxa ¢uR44E pla. ? 24 SN91 w,6n 15' V' Lf1APf ,aSK 95 tr nwi Klm Y Sw TAN H 6 6.3ac 1]2 BUN! tY F? KaK 11 ,r swv ear. r?xx Kaw k,lx c SB'an Ir it wNx 2A Y s1aB 6w. lu+l w7y k pxe maalr 1r iw rou H a•5Vn49Y eaP. pfV. K203kU9C0?1t m l6[P6. N iuwx[r ilw. peY 1 16112 x IMWNf Mu¢A IK pLV. >I s>VU eve ial ?Nti V swoar uux N Y Sul laF. 21tt NS51 k pee BxAR it 3K OAfA U Y et'1 Bpr, ¢xv. Hlll k p(G W W T IS' Yt10]RA 55 asp Kxa e'swuxr +uw ss Ir srov cea\s e• awuiY Ktxx x I:•smu eir. luv. KUeel+w maxr+Y sn mm 37 S+GB ewr ,lav Irsi 16351 a Ir a+a r aw. wci k uvkw r awvar » Ir sw?eor. Ka56aumaw¢urt>; urc W 1t.65'xNl ¢ MBA WI 81MW W Y SAWUtt w sT1A1 eua me Katie au a ir:eael ¢ uTm ns: 1x uraix lne2 a•swttrr n a Yswuar stir, iux ,eanklxeawnuuA Ua 9.r iA59m oBCp ,• NBI SRYAR s >m6? i r `U v4v FreemanWhlte 58b5 Re009i5Pid. GheAOCa. NG782173593 741.5251290 Pm -?-?MATe?tr??f? = ?sEpl , V$,3 n.q e {? rr. ? -,. :.- Grernr'k F1M?CaDer coTOGor5y3s WIJY Fr11,LY ? .NC275? fnr: 1012 EMERGENCY DEPARTMENT ADDITION, BOILER/ GENERATOR * - _ PLANTAND K? PATFD) ? 03 RELATED PROJECTS Oxford, NC ¦ awnao IN 22JM1UARY201D SEAL - - 7530 a't hAERV @,` 11L I ' L SEAL C-H37 rheum by m V - ? fl - - / - a BUFF ?`- NO HAVE ?. i -L EIECTRPM s F'A c: _ p Tax Granville County, N. C. LEGEND PROP. STORY SEWER _...R._.._.._.._.._.._.._.._...w.- PROP. PUVP CONDENSATE w? now , G ¦ PROP. STORY DRETS PROP. ACO NEUTRAL-17AT10N G PROP. STOW INLETS p PROP. SEMIDARY ROOF DRAM PROP. WATER LAKE ?y.. PROP. FIRE DEPARTVERT CONNECNON ® PROP. eACXFLUN PREVENTER PROP. ELECTRICAL CONSTRUCTION ® PROP. WATER YETEIR -e-o-A-e- PROP. GAS LINE PLANS -? PROP. FIRE HYDRANT ®5 UTILITY CROSSNO ® PROP. WATER LANE CATS VALVE OVERALL UTILITY PROP. SANITARY SEWER PLAN 50.0. PROP. SANITARY SEWER CLEAN CUT 6LC r a3tnv_ r PROP. SANITARY SrNfR VANHOLE ........................................ ..... PROP. S!LT FENCE b ?y ? ne to ,_------------_--___-.., PROP. FLIEL LINE - PROP. OxYGETL ATARI! e c CP-07A ... :.... ............... ...................... :... PROP. OXYGEN U1N1 SECTIM A-A 905[ 9 w a iMN TY CROSS-SEC 5.._....... _.,_ ..............h,._.,_ PROP. NIGH PRESSURE STEAAL "" 9wn r . x LEGEND - B].LOIPY IaF IMti/-4Y -------------- ----- . RA A>f)/5[(Ifef FA4HK p ara Blvi _ _ _ _ FNP. SW31 SYR ¦ A exr.sWV rurs o raro smv ears %L Avv. swaur RwT ow+ ° an r ,3-. / rdahl.rY 4 IY&RAO "I Sul"< sE 1W0 o0 ( r r<is} of r. ,? uazY Bda.h,wsr T?Nta' n D?.uY,r k ,yr ?aY eN klb Y C5/.11YakE YEOIVi CEVTLR IOTO MUM ST IrIIL Ln1 MCX RU DM m0 NCSR 1539 60• Public RlVd) -- -, !J--A1 i `PRC - - - m - f reref1 -? W Pft NO h O-,a0t .# afc-e r1.Y=ssa7E .? In,ww I?.vaw ?w Ni N _ wa a ---o- M NS1 f O:fA rn ?? a G ~-T ?? o0 z c 08 _? ° WATER P A ro eN ? a L N ii i m a Crck x- Granile Cedlry k'"?t?'il(tq GranVile AledEcal l Center Oxford Orphanage ?' - t sheaf ndra>g Deed Book _ Page Grand Lodge of N.C. r.RB e w >o rva ,•. aE CP-07 „-swar / '' acer BkN13 0 0 DRAM f SiSTN N01T5 L NL swv s.x PrE 4Wl H axYOB'FO wm+F,E OAS3 rc(x5?Y o-n) UYLSS Rxnx wramaYas Rl rauucB Srrrauas 94O. BEN IQWAaU .vr B?R0.[ N]V1AY A`0 bLYilt <E9P1 YrA•04 fi U'YEA O*?.SC WRO Ui 2 esE LL1C06 9aN AiF ueamue k0 Po Q.\1fA OF WJtI¢ a9SNk5 .H M L>ffiTAt 6 Yl}ID B6 xYl flA90>b YL{PS 1nOf A3 MIr P419i0 N TEBTYP AtlY N'S'ECIHY Rfa eRD1OR5 (OIiWA!£l I Th SPoAI wauz PRq Y4AR RRA NO IPEI sTPAx¢srnv swiassar Wxxvc nsTCra 6Y 4E Mi4S RVlQA NOOi W 4E M1MGSIT G BIOPIC wRUtWi W IniSY LE D?3tER1la WV5 N AxwR W RIBOIY 15itrc. w lFW'+S ?uR ??, otPx? R R???BBLR 2 H wfR'LFA 9LVL YANLN AVI flnlatl BWY MOMS. m? lOSM14S t III6I+.CN16Hy1trfn?Rfl>rxYe'A,4I SKM NbT E£iW,IR A9 YU E fG?JCPoi WCEE ?Ol?IDWIDFOElN F9F5 A'h NErs f0196F P.WV3Y FreemanWhite 00.w? Aaxa araW®N 1[LYeJerY.k LE ff?siKa RAS I:O warnssaa PoA+YV xrplaRr Baiua arB ratmmluaa wx/AW .. iVrxWf RY hID[N arx 6 sQ uv-1-SaFRSgI G [+Ynsu n 9b15Red OZ4 RSd. 'fro.?mrw nxEwrz tr,x sisnN n.c issO.?F mn Clwid!?, NCY8YI7S543 3 704 623-=*P'-- avon ' 7041232Mf. ffL fBdL-hUIE5 ?feulx; ID[teGT?xn L ? v? ?i iu nu aw L ? RNA VnM UUSrn ?ttFawt/?BOlwr?L 1 ILL VLIR.a W K ascvlm W OTr 6 PVUO PID,t SfAVIF> [C4L5 NO aHV?GlN4 B ax[awwA B%v+GSrE W YTSWK k! OY_Y,E A?FA4 W W RrS EPI Bax m ce x,au w.r wulor wn W toamxra ax6irn%oeru+*e xxaz nvna g SW L T ???Granyille Qttrrtta kd LMxT 101000lYge St 4A#d,NC215e3 T as Tg•nJi T.P fu E3.-47& FiM."'. EMERGENCY w.w?a; rwvB DEPARTMENT WT WIN) 5Si ADDITION, 4 1 1 soILERf GENERATOR 0.,a `?,M1 STORY PLANTAND is 1 RELATED PROJECTS iynegY x W ..t r anzsl [ ?`y_ ?y OOrdl NC I --y ET '? ipncaY - ?? Y(0.?n511 2fpfCd 0Wr8J All bIO f.. SUTTS 1028, 10aa 1002 ?.I ¦ 8970700 0.aY STORY Y SR*( data 0 22JANUARY2010 r M)•naex F ._ M h seats g?gSNROf '71W .: Bremer t 0:1)00 u 24 v U-7 Me H?SEO? matt Inuw €t ` a 2s In Y`.1 Rx. BI 1 - : Ali NtRaauM6 ? , I - t-L4T ?` II - wh'NwP S•R?xi uwhvnic rwlY -..- ......... ?? la>,:Nxm Ifewr Nti4un utwc reBUaea 2 P. SATE 0f 1 dmm 171 W I Or Rd. N KIW9EVI I nvw• ke4ua r, tlrtrkad6/ a4sss S ® Na ¦ Wcp 4auo aaw ro W-dalr &kM ?MelInnn ® Na MVE DATE 7t FLFVTRCAL R (RMYCMIId %x V f cc mm" y NtM.N r!C V I xU1r mmm ua b oa Ny0 V New2 t rmriax:.., Ui' a-1s x iaWI Ne4un 9 V p ;wWO rL ?? 7 m Nyw ?- ICY /Oa4t£i / ?' Is-le P vt R11a / % B1'a RiER f ro I. xe ua uV Olz imrYn suvav vxi S-0 1s• sw.cw r! awarlT w ? • h °o CONSTRUCTION .law o? or.ANS IAk1n w I ?1 \ L GEND .» .-.. ?? NltlM1t/lEF Awrt?-qr -------- lNllE ------------------- - . w.T - lE qg RR4PYxx MIY 1/9o?NT O q¢A ¢¢F - RCP. a18 k0 &it01 art- fR'P. klR% IlE ® iR'P. EbGIN ]RYP? W 8 RIP. qiA YFIFR ', ?. TYF %Yit411 R'4. t1YA VF Gff YALK T4y.IXfi91 f%P. iH N?IANRT O:AP.IC9a 0 7-0-- 115. GS IeK A ?? I / 1 ^d ' a Ov GENERAL NOTES P 1. CONIIUCTOR WLL BE PESPOhSBIE FOR 1M"M THE LOCATION A'M7 a a?.1 DEPTH OF A!L ttsTA'0 u7unE5 PPXR TO O:h`$TNUCMN. 2- WOADNAIE ALL UT11Y SEWS WTH 7K S IMIRNTS 7 ? ALLI TT OrY OF 0160RD UNJTY swmAW DEALS AN) SPEOW-ATOS. 4. CCRIRICTOR IS RESSPONSBIE TO RESTORE ALL 0TT-STY ACAS 70 / -? -? AH MAL TO OR BETTER THAN CONDITION PAKR M CONSTPIMU N. r, COgMCTOR IS RES°0.'SRIF FOR WORMILUNG SARVl ROUTING AYo PAym ANY mN%CIaSE umm FITS / aE &A.ONO ,. STORY IM k t. WSTIIL I' OWFSTIC RITE4 TAP NTH 2 PARMI,EL eIOOLO° - PREV9ITERS ON EYSrM NE N FRONT Cr HOSPITAL ERITND TO / L TAPE AC um w T A H OF AwDNC A1% W5711L 6' F6RE IA.E f 11TH BACK S FLOW VATERAS fS 6 CON'OECTED 70 AE FAIR :E d INSTALL 6A7E 1 YILVE IE A rrFR FA FIR HIDRKW. YT, 01" _ WAT F11 LFASE YALK [PEN N IsYIL INSTAR tlC11E 6 FFWY 10 ETE RW sH Sun L A , / Rxlt g1ER ?mR 1, INSTALL CAF ON VALVE AFTER WATER AiEN ME RaIOVED. TElRTg9(9R \ ml ti \CO ? ? +S K'e / Q-6 p? / gtFA 1!H V. f ro V yv ucnlx morel~p? i 4F fS LE9EIi 1 J r3, Rz ?-1-`Q? ? / pE7p g101 $R/AE `. 1 ?I -~- / - TAX .3 V-47& n ."m FT fiaPAAT ? uTw ss? WBSND 1KK'E ??. O.4 srarr y Y E °,C y /f< WXWR / fAOQMPo I' / l?? ?k ?{ L7LR / ? rF4 / / `g• A' SC q4A OF SAh31025. IM 1032 // p D RO ?TCiIlMflrE ,? TORY / ! f Du. y.,?, Y ' - IEkR Rl«,.°0) V ® JijPpPA? , ?,? % -00 ITwc o W"gm YE Ix-A 7 - NCSR 1539 _? (60' Public R/W) ? nTSpsvT.wTw II. s I oTANT?uE FAUar `. NEO'Q'.E. PA LF,A, LHANVUE NEUM CENTER r { SITE 1612 1010 CEUECE Sr - k'R-TELH3. ERC% PUtDM x V ._ T 5M Rd O tBM1d. Ch.e, te, NC 2'lNMM 7045232Id0 V? 704523MMf- ?SEPI p! YM Tb 11+/.pIC PHI 1°1. f/.4111A P IuG f Or'rsr A'• [ Granville WdflS4k fs-dT,teN°d al aB'?f SECTION A-A 1010 COBeg°SL uT1rY CNO54-SECDON 0 WU.NC27`.65 EMERGENCY DEPARTMENT ADDITION, / BOILER GENERATOR T RELAD AND, \ \v RELATED PROJECTS i Oxford, NC . asomo 0 22JANVARY2010 SUl - ' A?1ao 5 ?? "'61AELpR, .nnlAy G pe`1a?'? _ c-av x.a. I urn°'- t °A+6ICm ,n (TMau w?l maxnty ¦ 1C7a:9EVi a-kai al p1q l U:fw II riv r . 6du&WdlT8t5b4n5 B vrd w. yM NP. U 0 li NO j- IMME DATE fly ? Z 20 V :Owv. / 0 tl Ia IF.-10.v. "? C V ? ?";F AWRSI / y Y U q4R IE'91 MA Q d a0 ' Wg12ItfF 1 © O Q Cm b •` u oill ' so olroHmEm?rR .. / r I? .. _. . . ?? 4c1 ulA 12R ?g .Pp/AA i 0 rw ob CONSTRUCTION R?L.A,1 52 ? ? ?? r D L? Ir 1? T o of LO _? PLANS PLANS 77 - - TC ' A I r Da'a YOStSh WATER PLAN re.e . q g TAU Granville County, N.C. f d O ^ - . ussnT ax PxNaeh a r,: o ucan ele Granville Medical Censer Page Ceed Book J rphanage Ox or Grand Lodge of N.C. r - _ -- a ? ? B C P- 0 8 - ?? ?. ?-. ?-w?M. Rv0.4rfut rata. swab Y[R xan-a-E+r ? ? vav. atta utss - - _... aumdrwr-z-?wr n wm. sroy wESs __--- - - - _ ......___ 055RiPnM/XCWlf (ARtL1T 8 StirP. fltDOtOE P#rE5'lW I.] GA194W -# vOP. AG NYRWr {?} LI?ARY SCKR iANRTF ? T4.LI5FA IaF WEYiaK vva. sSNTrai ? 91WU.iY YTR liL4Y tN irs Tav. s'iiraar sc9 cu5M ,E YIIW YHK AxE AmtwT t't f 3 ntt[aevMUr a? »xv FYE on rml e=' . -- u6wsAm cbrur , -4- ,., . --"-t-° 4eCfFRJIY W?rR7E l+.i T ESrgir ~ ? WCO ]404 .. - Wa iA wa, rta rx- 'O1P.r# lR A Y 1. ??? a s 1_.«. Op0p - 1 \ si f%SPItl ? nQ ? ? m V. EV. - ?A a<ffi ?rw ?xn ?i ` s m?.a' ?uW ?? TRaxrc? art IBIK W r+ra t__- ,-„ V AIdGW wW14fQ W NffiM WA79T LW PUN WALE: k = 1/ Bmt a GEhm Al NOTES t. CQTTRACTOR WJL BE FE&0175&E FCR 1ERFYHO TFF LOCATTCN MD Owm OF All LASTtiO UT41TES PAOOR TO CON5TRUCTOL 2 OOORD.'LATE Al UTUTY LEADS WTM THE ARORTECTATAENEOVXW. 3lARi i All UT5FTE3 TO BE N57AllID TO OTY CF OXFORD UTEFTY STMAARD DUALS AND SPEOMATON9. 4. O NTRACTTN IS RED' VOLE TO RESTORE ALL OFF-STE AREAS TO AS ECWL TO OR BETTER Ti44 COAOIPON PRW TO CChYTWCTM Q IXNINACTOR 15 FESNNSRw FOR COORDNATNO STRYAE ROJTNO AM PAYM MY FRAKORSE ORTTF TEES 'm FEY MAISTRNcTm sEC UA'F 1. N'STILL 4' COWESITC WATER TAP WTi 2 PARAUA MEOW PREa4NtEn OR EASTNO LNE N FRM7 OF WSPI'TAL DUU40 TO BUAD' 2 TIP msTm WATER ENE N CDIIECE STREET WSTALL 6' FF& LAE M9 4' DDUESTC LNE A NSTALL WVNECTON TO FKSTRO WATER €RE N FRONT OF HMPETAL FRCM NEM(Y NSTAILEO WATER IRE A BACK FEED F*SnTAL WATER SWPLY FROG TSR CCLLECE STREET COKCT(W 6. IY5TAfL eAmicir nmNwTFR ON rxsma 6' WATER ExE HEAR OM ECE STREET. 6. (LASE VALVE ASO RrUMS EXSTd'O WATERA£ AS NEEDED FOR ED ADOTIOL W , 0pg0 . ' f _ irrtirt??? I ? SAN T s n . , ? a4w Sq Vr?OINTR - I I ----------- I Sr-..$'7C (E f -Niel PLNI ?N n?caIXiEZ a°'4TWET Lr atm. Tpp. ItRA weE APRLLIT N Am R]V uT Fnnru h wu fP9. CRKF wr. 4av FTk rt4r r? ?- Ne 4Taw ark uffi w i rw a?Tc O W5 01 50 14 W 14 % 14 3! 24 65 5 w0 44 50 u po H 'L % w 04 w IT w s WAT9i L3E PAOFI E SWE KKRL L = SERT. L' • 3' 1 1 w w N I pp1 81? rav ? IX WNE IX 15'!161 WR 4Ua0 T E ?° '+' arP ? ?' . y4 rum ar. i' WSNA l1P. k I 1 T 6 6 741 FreemanWhite W"Red0aF LCr . CKI&M.NC282umm 7015237030 p`QW 704.623.W6 f. g SEPI y6xatam ?i?w'n' if Lim ?m '? Granville 1alBCae?rst oAyd.N'G 27665 EMERGENCY DEPARTMENT ADDITION, BOILER/ GENERATOR PLANTAND RELATED PROJECTS O)dord, NC W 85OD20 dalz R 22JAMFARY2010 Seel$ &tu _ gIJ. - 720 E cfRt? AQ:P 'rl'T MC. 4?`ar i??Af'?5E o-a3T t k.E• z' QY.gp?4'Mr,rin Gann by N KOQ'0EYj d*dL R6y W 'RCP e&EBdalrW.25ATt5 CONSTRUCTION PLANS SANITARY SEWERAND WATER PROFILE sr. tr-bL eTm Ewe WW N» Two A4v 55w 54w SAWAW SEVAE 1 FROFLE W CP-10 54AT. 4' • 3' %4E ? u b R.v[ T. ad v AN Fl E T' r 9F P? SR 9EU.'01 fA ce ?1 FFHAX iffi''# XRWL 0.16IP AAST YDO A - A rI ISLIPRESISTANTMANHOLESTEPDETAIL ws XS Feaa w vF• a mss mrr io s: w nrwc nDa ? wl o e cevAnrto De b eE1m [ Pd rx ur Fua luR¢ M F1A'a Pt WF wx XiFA54 m BE ? emla naeE snG Xx X• Xi RFE FRl1 r¢ rP,ir X¢ uu wFa Ott latiu ° D? ? DA ra vie ?? rw+T XUT r?lr tc,f srFav lea. A / XiYltf Si2afR VFG xtll nxuo w,luw Fyne r r:mm 'A' ns Fu ns,Ff ,E,n as> ac - Fr d• f x X9ER Nn R[ m EE 6. L41a ?. ASMAID Bf DTf 0 PLAN MEW aY Na rmxa A,E m EE vTnrArx m.YT n4' WATER SERVICE INSTALLATION µ1R t Xd 1. vS Fbuuli I -ZK C'"et A 5'% SIX 2PIf 7R]fIAF9Jl3?C [SM7AX YCPA SYLL FEpdA?'11¢fTe ff IfFSi [ii??VRiO?OT?K?F1iA 'io?mw? r? A190] 1 K rrAE 1• ff fLL 3X1 cow OF)X OF&34,VSDHW A OWN [Wt WWA x ?? W,KfA MfCFW III ? S. A W DA.1(F FAQW 7FRA MM V= Siff m SEP6r ]EP, 8R I Iq tlQ 9NL K A`h'A, 0. ll.6 Wd S Fu 6 Tf AShRi Hr9UT 90.E 1? A9?p6]1?LL44?F?ET AJIT frpd9rd STANWL) VAI-VF- BLA INJ WLIAIMV f10. b]. $t?\U,40.04 SJO n PIPE BEDDING & BACKFILLINGICLM'D' u N?Nda7 SFR6 6 A- Oaor Pr 84w1 b?F ?+? !1 Sam Inck pp d Icaoe ?4' eA Z S' ?T FreemanWhlte SS45 PW OAB F Ch.&ua.NCT8217SM 704b23.2"30pbo- 705.523.2M rdA gSEPI IAY?L,rFy,?LLo '. mi 01. Ite1M• ???Granvl{le (`ifdTlTd N1&A Center 0F5.d,NC27w5 EMERGENCY DEPARTMENT ADDITION, BOILER I GENERATOR PLANT AND RELATED PROJECTS Oxford, NC projetl rurbr e50M dab ¦ 23JAh'JARY2010 °$ s s n SEAL - n9l A a .= gx r?`uFU nplen,mr dambJ ¦ KV0.lYcY! tl,?kdJ DY ¦ wce IFJJe^dalre,Gfora CLASS-E°SEWWO X CONSTRUCTION III- OFoN CLAS$'A" DECDifIG ?_ ICIGHT. 90016e. PLANS Fvc ?rER J E PVC RHSE6 SEksn 05 a A PJ'E w,Ea DETAILS _ u H?FinCOGU u e X• aTv a aresm 1m1 rsl a Fe wn 7-71. Yff l6r fiCE 9AVLff _.._ NSO p wR?l P YgAi ra 1a.wuvRr•.t wm f oaa oMr.,,>u r rnEC ru.? sru ac ecurn faux hurr.. cf nxxnsatk snral xFem lx •sFdw rwuX w?_? 1 VkM. [AAXE +EaF,?s]r r) r) sit msd PIPE BEDDING a BACKFILLINGI CLASS "Ef- W- " A I - CPA I 1 8'02 g PIPE BEDDING &BACKFILLINGICLASS'B' m 4' WATER METER VAULT XTs arc a msamT m mw ' xls -" aY[ m tt NA9 drlea igTAErAFIM, td[R xrfFat. rrP, cAra A? Fpm t,srw. nASPHALT PAVEMENT PATCH DETAIL k !lm ra nrax nn r.x ?m ? o-ww xu r? r.,oec...s tr curPro r: a STANUA€ 5 HYI)RANT INSTALLATK)N swlo srAmAXOS s.o7, e FIRE HYDRANT AEO WYAT Th[ f-0 US?H'Fbfl03 PMYY ?+.F&SfAlnt USX 9.kFRE ,••?'?. F U06cvFRD wI. Irm FU r. •ary.'•( urs •, ?. wre r3EWlWY.pttF[ ;F?„S_ ?? d.l'ye.•1r W4 Dir•.eeu e:e. n 1, ' ,.. 1x1115 ?!' a VALVE BOX INSTALLATION AND EXTENSION DETAIL X,s ? u. v.iry vor nLU.sf. -."an?aan4 • 1, f u f aFr ure 41 DIAMETER PRECAST MANY16LE l- s PRECAST SANITARY SEWER MANHOLE 4' TYR-1 25' .R•Q ?6?sd?a43P ..unf eu _ _ pp4d'sp664, e FLA I 3'-0' 4v rau a:nr,hhi FTC NJhI 1[ S ftttn,n.n x.furp, lain NW wru -?? 1 `?? '.? or?c anrom'A -44 c+?sr?r?cu`-' . '7IIl? II(p (E[E .,,`N ,, .?. ?'.?a_ r .emu aFw?E ' r'`r?9-Yt"?F5"? ?X?' ?IP IN.YI afYirl 7 WAItKl Iti111 MANHULL UUVLK c ass?_?° lac.... cups eBEDlY PEOTAFQi' HMnE00.AY.DKTF.E III REWREO FOR C-900 PSC PIPE CAST IFION SM.A REASTOAEEO CI;II FffS "'-'9 v1 A=tinil'°i°w`e'ie'xrsf l"°e1mce ?n r.°?°eol 1 tuai LTporoFf,td n I n srOFm :rA?.AA01 PIPE BEDDING & BACKFIIa.fNG/CLASS d 8, C' e a 641E NA,T_ NORNAlY APED TOP Ef GRM'M K DsW Ff41EATO2 OR VAS OR A/3GNVff 810CK FOT OVE NUE WiaLVLY aottn 4 WSa:•RF fLOCN FOR , 3' Di lA? P.cSpI;Y ?. POS vc OWUVDE 12• V+L TvcE M SOF OF PP. /STdiY 1 SrCI URINE A006N3 1. ALL AnO.E VZQ' 9 VAMIS WAT wE ADEOWir pE4V,CE (TYCE nrL OAEIER OF Tw AssnmY OR E91irmi moj 2 AIxAE UaW NDRATED VAULTS ZW BE 155E 105 APPMSD ADM C@NANO ENCLMA25. a STEEL ROD$ A•m WETS SISYL FE 7A4' FAIT TTFPED GOLVAUlEO S WOe RL 1!HO WIS C9 Aiidlfa 10V DO.EIE 610! SUE WTLDI M'IX Et I-I OYME Vp AO WE mml T94E v0ts, sxt uk1D WI ON M. 6vtklum IRNII SD:% IND ICTTEyT V8 r SF9 WL AEU L= Ri1DE 66t-T-Wvt NGOW O)R " ACCt PXWE V NAY ffNOM Wh PW V L,RYR VA ONEV N EUI COM-Ok IBNEE PPE Sfftl6S DOUBLE BACKFLOWPREVENTER 1Ds SRO. SPOORS EN{LCSE ENDS NTH {NWT 1. All AH0.4 GMIND YNRTS VJ5T NSVE AOEQIPLE DFAN' bE (MOL Tiff OA.VET01 CF THE Asswmy oft COUVNEA'Q. 2, )ZM CROM vNRRATW VNP3S 164T 6E ASS_ 106 APPMSD ABOhS GRDANO ENClO64dS a STEEL ROBS AND DD-TS WALL BE 3/4' 10T DIPPED GALVANIZED. &ORM PAIN 114" ODOR TARS D kwo' D NN. [P{aE 6Ca SNA S6 w EA m L ". LTU A?0 qE 1 NIXE "71 Txa CM'ID as m1 DY3'. FDLATATE iR2E SDJ% Aa DERLNR ART IN 5 P9 NIX MD Dom PXlU WE-T-OM Xl D7VMR IDRA FAME 4- PENCRID N4a1E FPO 6f T MU N F Dl O E %E PPE SADES MME u LTm 1 S ON UDiVe PNIRTA i1ryF5 Fm NS 0Prt63SPl VAR Lta 00. nBACKFLOWPREVENTER 3E OyCYR 8lIX% Fpi R4N9Y LKI 1C SFZE A$ Y WE/WPM VALVE a4,-ar d,d TOP VIEW 3000 PS SOLID CONCRETE WW1. DE USED AS rOOTM FOR CUCME MN PPE. VALNE 2. SEF STANDARD RFAcnom EILDQX nAY'£' N.l. mnw a: o.A, r TAcPNC SITENE NDrts SIDE MW {. NNCr Sl A NOT CONUCi 60LTS OR ENDS OF NECISWm JOINT MLNOS. Wlu S% W-10 AND W-{ 1 FOR AREA a CONCRETE BEOUltUD. 6 STANDARD WATER LINE TAPPING ASSEMBLY u6 PPE yu? -/ / -w -E TD aaAa4 W STEEL EN'CAS©INT APE J "D5 CU, FT. STONE fS ELEVATIUI (s Pl R) h'm STEEL MDERS MAL *smuts' WAIF 8F USED FOR E6PPoRT O< THE CARREM PRE MTKN THE CASINO PRE CANKER PIPE m l hoA? ? h 10 s N SLf c L VA%%CE NICESSNT ENWf@I A 1TCESSA.RY GF,DE DFJ.NAVCE MC ESS 10 EIRE W161 iFFOAE55) AND SUPPORT. SECTION S7EII 57RlPP5YD nCARRIERPIPE DETAIL IDS S A 1T l m 1 r? ? ?I SECDIX4 R-B f~ta ?? }?--- r svl -? F.-rive T?G? SIiO[MI SAONN itA WDWN W76 B YARD INLET GRATE DETAIL - ?6 w a awo !?, IaflA aq ? a \I rn. y,•?laa xvaa nP.v srav Ras DDNN D01N /w?a[ 3-PA! eta s r1, r-?flxNS Y .,'. C 'rm@xoaa slmmir, ? ROD REOUfU_VFNIS saau Nom sew wsNPwa! laaRac NaraP 6' W! ` 1 21 >ViP 6 L sm axa Aa Pals >vAL D:l/. NN wsti cau?. R W9+oES'.,i Tor e>'+o 0lrs ceaecmaval ms aN-a S )ES'lf60 YiOi'NGL OJ1GS W a I8A R Rl f><rQ 1D VERTICAL BEND DETAIL vz!y K$ I I 1 ? f .: 0?_ klddLVJ CWJCAETE EUOORCA IO,Y.), .m nrt rcu a d4 Na acs w 'vw' e4?. w '6" '' u?R 4 PA @,I @ 3 1 O,E 4A 0.1 0'A 6 1 1 0,1 0,1 8,i O.l A ' o-a os as e,i a,i 'a @,? I• O.i 1,4 cs 8.6 as 0,e @a , B,i OS e? u 0.1 1.2 0,7 0.4 0,4 7.a IA 0/ ra 1,F 9.) 1.6 0,! 44 a=r1, h,2111t1m?v k fi all pi•rIe hr F,,. K.r?E wzrel. if ef"i 11 @10. OR sr.{Ab.ARDS STANDARD REACT ON BLOCKING /-3-'\ CONCRETE REACTION BLOCKING DETAL m R-3071-8 (PANE RN E1E41TCH PONT As0 OWE OR AP FA ED --fhdsw fN me DRUars 6' R f8 10• N FEI IBT6 ? GR LES? a -, KKL VW SEE PUN ID1 1. k WIPE STEPS AT 16' O.G {/Y CEPDR NAT 2'FEOh F CEF M le FWtIV--" I / , 6%6129x129 n CURB INLET DETAIL 'ff FreemanWhlte 6bF3RLd0a1ELW. Cam, NC 262l7?54J 704b232231O164.IM2Mfa[ RSEPI •®4?ii?r? L!u ???,Granville pi.5n. [?.nsv 13mY3e MIXI;wC.1- SOI wege% OAd,NC27665 EMERGENCY DEPARTMENT ADDITION, BOILER/ GENERATOR PLANTAND RELATED PROJECTS Oxford, NC P'*dit i50F ¦ 6SO1f00 ¦ 22JAtUARY20f0 ass ?iti uROr",'•,.,, Am - 7430 `a ?rP s116? /,?s` -42ND ?'p?Ya`. SAL C-2137 &ra t'j N KwauEW d dsd O N vice edjelda I reUs1 CONSTRUCTION PLANS DETAILS NReI narbN N CP-12 i NWA"DfD lc k L Vu*0 ""4 90k'C kD BEXsG PIE1976994 H vm rev Tf WE FAT cu 9tl M AD ?Y16 E W Po53 Ot S=EFS a OR LA mEEu N6UflL 3L Kt 9.1ld?Ik4AEW L DY.VIL 9145 WRDNI' S e0A idA tAFNA0111 WATERLINE TRENCH DETAIL (DIP) !yhrrs L' NDL1t ? F DTP. rl worvvm6 FDy Tmatva "f r NRF A W9 RE' N9 a SA[U IH PK ftD NS IY FO! N 1 DIG19lL E 20 L21'O wd It. W 1 Ia'NE 10 i 3e ".4 L6O Irv{ 1r FPE OR LULLL FNRD NOVI PAL Ph ta'MGYA E rn i wWsweA RR h Lxrirxe0R4'T@'L 1d "NeNT RIDE0 N R m WeD31 O m ND eLBOE YW.?$ A]TP.WL L SLL'IPa(Rp BAD l? i N {fPC{ OD:V WAIL AE 1G54PID f001 RE ? aEf adrfl W M I&Eal a [f L401 fi491 YARD INLET DETAIL t m6 IFLIPORMY SFFMO SCHEDULE Tile Et0¢ Se?sv DOWTIN A TDCOM ROM OF CPFA l MM R H W OR SM 2( A SNPd P0a9l0 6@5715 L m mm Smml Rl[A FKA' IUR vAA\'L ASS l1W fNSl6@LG6® SUES 10A VAX= an-z' L m Mm SFCEEAT?.WI @AMI FRf. I A 0!?lW AiA tO A 4DIQi TQ"C r0o' [06mS Y{?E RA.Q A01f§ Y.fk'4Y SadF lAl¢ PAdI V-YT B tDPNmm fAS o Po pomt, twj;909Oi(S OR BLl17PSAEY4O13'E pAG 01513.SP0F iOFffAif BiASRI tlNl/ IIWI A Y10.N dAFA- BAL m 6 xp-bm ad m m:,w m OPEC; NL 4WAT-LAYN smell uvF hW A SEISPT ON?OL 0.','F Y.9 ff WWM PAR 30 (NWC Y MxcrC or H )M (OR F CWME01 M Lis GEAI'01 F 7SLYLT 005?f LS A NM1WF8 kT ISAn AS WI 0. Vdu$016 9(UA H p 6A9? FAIVtl3 B O1S?A9WI OiWC014 C. UVVWG 40w EE =1 F V F Mx9: i!%lY H NNE pR if 099. 0. OPEC 0.V£A7k1"PAK M DC AYm(rFridlIIL PLAAASPFD .. YYX, N9l?PJ1. ?R6 FLL qt GJF AO__ 466 LI I? 9lb BFI Mc OB pls M 01 O! CLI 0.9 S 0i s. FPa'SL v.Cf ltal & AiAAEO Po AB1S 6A'HT D.YXSW/u -r? Liyff(AOFd 2A S?lY1Dl V.060L S lp 7[9 W T@H a fOm 181D'6 N.CIQ mw amm l FwW OA . 3 A1f4 V"n0.9 9FWSNC CILS S AT gvwa ,FAIO R n [P v 504 Vb1 OflT A? 90F ff!x 6 ffP{nWlS Ytp tLYIPW ESID. t TEMPORARY DIVERSION SWALE wa 100EAs a nxc Fran a.., STANDARD TREE PROTECTION DETAIL m rrf3 W IK XdX ?L40.IDs1m Foal IAh Ui Fi31 N'SS C fBGLlYA YA9V.Y! 904 / RAVE WAv'M4 fLY-S9F M ssacx wxF9wcix FWC(rsmW !'s, m f '?. GCE KIM O 506 ff WiM% Vs19081ff RAA F\VNL SpI OIL uT¢amalNlnl ypyumERa?uw?. 9059iLLff RAYDR'kAAV1 M FWFA9AIRPOi to 0UA9 T{I 494'[491 /AO rawo9?R LfP ViPA SS$ HR OF 301 RA N.Ff[?IX AYA Yr0 ism f? ??M+f HMT 1`0 r1Q kPJ6tp PI;{k Li0A0.Y NRMff Pa1RL RA'M' ?.1YS POA'OiE ma vuffaw?eF Grff tl9uR rsTC+RS 0tti4'>A1 Y6DmACA F¢P Opon4 RATAO11RCai FA AIRAi TS NbZ491Aa 5111,1 0. P/1PAIE4 EOi T{E INi'&?G OtiT 109: A4? BYiIF MaIA'Oi-961 pAU 71@AV? \\\Y V? mar. 10M S'm hd 97545x N19"W fAiC 69N0 fUR7 ? LO1R 16'0 'R f0L?L1fW P 106 R'ES AS IOF AmNa! SVIC SSM TAPMM qX2uNYhy IfftV(pL Wit /7INM FAA: W'Iw FW fEVl I/O AcmF SlmuNx RONVS NxY SOP6 Y9Nf sow erA9Xrma gFP WH RVmI ff r0I X W M 75fliV p'd' FM ?p0 Ld701 k10IlUp 570 NID 1'_`I97LA0 CbFA7i0 61PA'tm &RF WAl41M-SOP " nTEMPORARYSEDIMENTTRAP =1 us H Kamm Ob1Fl8uL PE?Ytl tv".4 A0? Art - DMW kM H 6NNT AAAAWd H (XOC W IM FC9 0'Am P 10LS - IlO H 1VA1FA! H.OaAl r N RLE CLCIX or IV 0% - R6 M OXiR ff [f OECf ONR Vhf I FCRS UN9R LiIX H OASR FYIS R AO?A iWAO -?S{SB 90Qff HVVR klWN9St - LA9FE SOY H YpN.R Sek'AO 401101 O?E5 TNAYS HNC ff H IPw'S1 VY R H SYE 015\!!9 a H10P ff H [Ox4'kg101! tl'^? 1xY1 - La LW 2 1* pf x 500 pE OX96r LYSl1M C 5}?p+s{a Sa[ (tic w evAT ara?mA.vr ams A x at uaAS 0 a L uwae ea+n -cYt{yqE 1?Hp'dN Bk6A0 FLL°F?P9 HxL3RS AN AO mI W AAO 1v90-? IXY O0.tltR Aa30 H G9l ONSTRUMT10N SPECIFICATIDNS L NAT SWf W[{US 1r0 [iCA9059811NH RM ceA M1A9IAa>: IOJ w L FI6HbY'Ek EeH B&igY A"IANVIPOr3670P N•+'?t0?!A?IFA V?HWA16 H WJXL FIN; SPWOOakR 15N&'v0HO+?+Bm°S (NYH EAp$%IPTA FFIaD+ks6R P[11 U[LmS06 H W AS 540 ff-d'DS H 09NLL L SFlSPATO vmAa#54THPACOiRH979fftf ItA6 Vk6HSYEG HAE PACIXffHON9t P/A 3 Pxw H1k7Nfl OOABM.a Ff07 kT L(Y61 oFU nx opEtWC cm 1A1Y at ruY as Aa m t UX ?. Q EI4 O,RP S-l AL'P k?GUkl E F# 9Jk 1:R t4 PkMRAm AWV. iiE SAft ?A3.W dN 6 39dE T. G6A iW Oilv'6. IY.Y Mu SO" O1+WIX'A•63 B1p10.EIX 9/14 hE Nf S96rW GWFfF 9dOPE L = THE DISTANCE SUCH TINT POPoMS A MO R AltE OF EQUAL ELEVA7M4 A L R FCH W$NTO NrAb X AD NIl W LOPH 6FA v OL1 S'k I D'N S R lU4Cq v H 7n OPiYa811 rNA 2 ROCK CHECK DAM U Yiaran Gau RR3 A-p Sat st¢at Imx gA P P h (am) 50rn RASCP m eY = 12 W+ 10 9166186 Lm. "Sw W-VW OW ble'm Nd 1Net Pa ta40 k EvnieE Nd ggvav kk*et alk Nka otl tow Wh ylk?n leqa k/w. } b Wi a7y Pie:B'1? th JaA a 415 amr YM 8--59- Il'- eb wd 1F. [ m rce'ce b w k'Wa1 wa. Yfd PAYS ql xrP Aq lk wuil- m&*I luAa/k klml seey?FAem saee uu em I.."% rd AY P>-SAP. m A4 PO-41 It ld F? rd. 1FYa. ii r&.1-kIs ra b taI b kP luart eel k7a 11! b kpd- Omwir d r.8e kge>®ae ?1 a4 Y?Y.r7 a!. 6e Aml7 kn edYTe >q'EN m OI hY a Wif ran am Pena ar :t,+ M.bV eel laOO k/ore 10.)N7 hove. FuAroah A++a??m?q rtta?D°dL?ea+xredy? ?9?ead1Y kd. A as ?6'da d my k3j1 m M e.P m e r.A?.q E+F lw F khems la*ekn p:.Ak Fell aa'P+? Yq Se cAVtl oxea Sfs e N, SA ? 6 d °®F k,®C hSaA N 1.d Ya.+Fd.o k*=add} 11 WN b Avea1 &W Fi Haim- 3 PEPMANENTSEEDINGSCHEDULE rxr,a YCA PoSS !a' N Wlld FWt6ID SOFPWFmIHDi ff 17'-m'm AnEwaltl t STANDARD CATCH BASIN iYARD INLETPROTECTION - A7s ? ckrN?) Ip MW bgdw LSN f' Psivi eA C? rtfi KamkYOaEiI) R M AWAk Ik3IlmlYQ OIJ.R ff IYYA 6149 loom* ffwa AAE 9m•G D 6 W5'A3UN-fe I -NA m 3]LAALVY\3 ATil11REIlFSOF nO ZU OlN3F I}?IFIk fES3Y ?? RA 01 N41ppp PA. Aa[Y 5'MI W L16R4 Va[A59XP, pI54 Di A u W0.5[9(X49544T VA91 Stll?i OH FEI® 6A WWm00YC TJL IMA V7wC FW N67B N1SAxpai N101, R1CS1H x0 YlM ReW.ar FOAR70 t?1 a E:{R cuWA, S1,Y dM0 9e3V Eaomad!? h sesw 7or? 3;5 faNn) cant.t? u X H mCY011110 V.NTV$ A SYYLALIO SUA'WSS W ff A?lPm A A M9: ff m l°J10E 9?u dAs r+ArA n.w-A?x n . Au m 5JL11LYkP?"S ImOY ARNI]bS05 ff 571105 O1 RRY fA09l/uE 88/0 rsmA•wx llkbok7ro 7x Wa>E 7r1ru ? IIk01 ,RY 1.W5IaltlE S'mA MOOt IIW of vol4 RN wX1, NFDF C7 A VA01 AbOdM m]- A 06( Y,Y 41476 m 1&AYSYDR fAN ff lop m AYAm 11nORG W0. vMPXtl FPQiH F WF)I N of IEW Alp/.`: rLAO. A0U7¢ER4 MAGI SSFNSIII'g1LM{ FABOI IX 6Q UiPti 4 TEMPORARY SEEDING SCHEDULE IF , Az If VY YCIl0L r5 991 I71 stl9m Smf -FPSS?0.0.55ii 771111FRff? 35>?SLUt __ `? _ Srt RNEY wAAS s6mrLr A $Q FIN.Y 519VE IAl: 4)l iwrt US -- FldAYI(YWCO: 21°X.ufflM . I-V IAA: Matt l6k SS F0,1361 UGOAW NSW Wx ITN RAlll lF]Ol FlACdI[ 75 na Am GdT 5W{ SPUN BYIi@Olmi'1R1E aA YrarY DY4'1Aa b£ IS mm kYFl6 ?-rH1 SW-" CAAIt YFDi N9AI 91' I 9894141 Fag! rr P' maL SA'E [IXtfSJLIE f9Fl1Al F:lJS 6'8141 Sp7VA9)S 1 s6EVDka KR 27 sE $"km GP ff wO:vS VFf£hSERfF 5 w 9O4 6Y w XR405fa1P11Evf++01 !}kv tt 5849LE am AA ceaI A w M 018 f1?C !Fl 0CV0 uw? A0.CPA lR FR:mm ? r7AE ISAITDCAVCE W4rNlPV.G(?R1K rW7RN FAal NR00ff SEVYAV fAKNL RWE S'lY4i Aa bTsJF MATH AP.T [iO U?t Atw4mm geMG$K4 Si S&%FQ Pd A]1VL.'FOWOFiAfH?OllpuIUHIW. 6 NA maAm omme Am Ro r77ca HOA:UOAS4P hw a tf ffra 7,rc OEIXHS+_A9AE R9014T f1Y leW7ace?APta PWl'fAlY O1Lt H{CPN CFH 4UW mD0A55A N8LYC IS R ffT11 Tf LEV FIXA CF H DAhff+rAL fOFOCNY Fl£ MY SSSeuLtt ff H 1164'}YATm 9IXV ATIE l0X 64V£ xa av Aw sum rRYr H sukv 5!m ff 1? Aemw saTaH PP01RYAi m NL cean 7ft5 rmT H umeT rolAa XNS?9NP fYN aE 9tw YvmwxrtA msRCP91 stud saec nTEMPORARY SEDIMENT TRAP OUTLET DETAIL ,_iv m 47 FreemanWhlte 8M Red0&&W. Ch.&d%N028217-1593 704•8I32137ph" 704.8232235 Fax SCrSEPI ®1i1'w ?A e? ?,o d1vA1 999. 1%nn AN?pGranville Y =,gntr. cla 70IVzdcd Cella 10300c-ja8t OAtN, NC 276% EMERGENCY DEPARTMENT ADDITION, BOILER/ GENERATOR PLANTAND RELATED PROJECTS Oxford, NC projadl-tS ¦ 8500200 dam ¦ 22JMVARY2010 7937 t$ ?tiAdQ 0,r` C-1131 tQY-'+6 " NRC, drexsltT/ d*d4 db/ RCp addal4ll(ar 57 YPL PL I. Rr SITIFN3 ceiFlF fOFfV W 0.Ct{ f06S9A99i ErN'Cb b IBA = ?kk7d 01 SE _ ' L FW TZV P01 H SM AX SM MAY E16D 6Y p8 YA 810" r ' ham A 'dE T , H V-c VGK CNi SFM, i69 T> DE -? c MAX- IG ar ecm Psp3 msm 75'w PVNB 6i0?OFUd. CONTFIOU aAN4E1 I7 t'AL._ ? x Pula Foe YA)Eq?SFAr81EN E'AWPA5W 0.51 VAFO f-0RtiOPE mrAF1ATK)N tV A £6 4Wr A+ kAN1v Ur L }?+* \ S: }!'-- • Y J OMH 005 m W H F.91L MT4 4DN ? ArN IIT IN10AY H AS1 AVl . 4f?kl m4Rt?taiXln,IA4nq PUU m F } N QL?? Na pnsw m iF'1. v ?E Ni9t 8w F'9A®NV. . ggy Knm Gf WA'mUY NPJA 'ID WHiWl01[Af 2 RRI At i{TV VCF SOV eTNnbbO tF hAW?IXAI'p!x)NOE RIOI Nat A3611mvIY Fa^1 ffuvai ElcCYD 4lO0H10.9BC PotSgv FD? LL4PC B1.Y1E ?S41M 35'IGY+? 1 - ^.i'.?i..'s1r?. N'3r?;?` IT'IC[ ••. ':: WIL? t;tabs 4?5ttuvaPrnAMaff 6W+ES/a?At3 HrYOBl1RlY IY Nye)YA9NH Fai10.16Htmt% PAOP12 Ab WVK11TK7 iS`OI AFRA hMtr PAttM NI=WM?&WPF t11FU?¢nnicl a lHS t?4NIDN W10.Y 1Y (at Suul a?tt aNv 3011 M91Nitf WUGM /37M?31TN?LYLZ.A28.NFRAAVTS MA ° u¢,r erns ?? ? m SKV?YflSDi•A 1050.9AFlR BYft/va 9a<1Wm/aB NR4@]FltF 40tsa05 ?R9pNNH5tA1[PA11W10.[G Y{N L9b9roV1 W[MmL ll49Et/51N? " EO°"bb d mtE°9?IX,° G°W"`" F P CONSTRUCTION ? op 7- tttR v VAUU0. BuMLtS YFt 8 S1.41m rn x1P.911m1 Y-J' l LE ISesIPSa+) e.SaAr 7armR or FlAYRT ? W t?r? vR? 196aks mrE mzxxc{a.Yrn NAwl ?,>ry7, Ns+ aao spr ?,r»?wxv?awtaa PLANS DETAILS to CONSTRUCTION ENTRANCE Cy" )t SILT FENCE OPENING 1RZ N ? •s 1AlICb$ t{VlV Srii[ pl S[K IE 316 RG1W 12 EROSION CONTROL MATTI NG R alwr -rb? • CP-13 _PEAWNENT SEWN -$.0EQVW- ascrR, K IW?C - eu1Tw \ H k ? ::? as 1 b , f( 7 -?^ ? _ Y • Y' F (? fgUA59E B. W] SHVL R [Q6RCk9 fF 5IIU QOtm area YRS StASPP33 SRa RYIAi PA%3 b' XtE4 K 54aAY94. evxm gut! P?PP+S x YA,cutY W1AJ alum mau ? a3rAm er AFftSAG t? w x h»Lwt-reP Ydr YNm ass A sRn tw:m 3pDM Px AIie4`7) xt exam w auAPg AT 1fe N'!E M? Am?imc?vrr tt ®u® A la%l lE. X 1h LPAOfi f09TOF (Yq Yp 3Pe]gl Wtm} 80EW S{YA R RP930 Yq A R5t L`P.vA FPYF 0111 A10 A% LYRWO't p[WFL lN91 Q•AL COLLAPSIBLE BOLLARD NM A49049,nA RPA,? AW A3vNW Y AN5451YE vn uRar Llw_•.L a ? SWnt EQ'lP.l awPa Agee k6 A:1 sPEaxxtas +Y! ¦pAra]nIa PSSxm ?t4,r A rA?P hwx ¦ Wfi YA,gPAP iR4tt suu ? 1Ze usESt ,2rt Plali H SFtiae 6Y lMX A•,Y+ORIYS N>-aA ?? a 9T5 9a 0.1-e R M-5 OR 9"ll 0.]-p b L4.. SA. P65i mP W I rl r+-S[fFP OGG IL?' .JI fWM3 2 ACCESSIBLE PARKING SIGNAGE A R sxn S? Funk tle IA' PAZ sAVAa a vASmrt Set41 1' WA Ft?? :?;•}:?.i5i+:;??F:i<.ii+<o:;?%i:.??::?<Si:P?c{,'?°.:i:°?:r:-',':r- ,,? NWKke FPIPD:Ee Ed? g,L PIJN BM APrF 3SLam A9YKi PA'ASE 1 CMi •III?1 III ? 9RryfF V OAiiCA I?.?.y ••.WL•Filfk SF] d' 5ttY41f A 4/5 Pu m 1le 0.? 916AfE R PAYOL%t s x ti i ARUEJMII'aa YN F/d'PA]Y 9ULL Ef %felm X k IVaFR smwK xr 4 Ynek4.5 t]aPSp wane esLt-r? sA sEa rce A'ALOUl Am3 srm3 F£osmoits 1 D£ 1/Y EVAkHe1 JR1t M1 & 3WED Ai lr X@Pf4A 1 A S/%' nPksa Am tPt SE KpA•¢D>•Ya ?E 4%vAR A%3 AMTRW STmtnA€ nCONCRETE SIDEWALK Yy. -11d- BN e \' 91LL0C 1!Etl ?PPa 5tutm A aAab tee Yli %ue SQ PSR A LfP4N aYv ASr x Pam ? LLa49n ?c1es aY kRLNT Aa P sc Aw auL esTA a CONCRETE ACCESSIBLE RAMP - h15 r a' ;r L'Ap nsR smeKUra oc4P3Ev auY?3 Y. r co]SaPAAn a xro OP QaY OR ASS 9RXMF 2r018 d PAIR a .mw a xw b=k t >5 wwK PELP[R o?az4na aMSa _ serN VeAC?PL Pwa m3Mexral ,tixls ' _ -Ate ?`- , _P•;. x1/Y PwAma.rNS LNxr or. • " g -. a aw P9 P]tdFiF LLNdlt 4' Sp3i LLlM1rL ?.FA4 fAP - t3'? ' `' =:. A LW.8 KY8+AH RW6 PTaJlt99WE IEFf '• _ '. •. ?.- ? 6t PFP13tfl365Rtpk ne•`]a MAOt ' _ 9tAmAm3t?ERYJr03 PR PYDe AI PEVR 3/6 N'iFRaSA.'Y?Y P-mEPRS • ? sum -e' RY m?[x FOR Pu+c3 : L Au wsES<xa r rs Sou PE r?3P • u aw+ Yq un Pv]x AAO sAPaFA 4 AAtltlAMa MW a2pi ASV"uY StupAm LEUA Hitt of .OTT YAR9AL 9141 OTtaY W arna 1%5-2 V =71SLNR4.m SLOFlEA.PLS Fp4 g v,lai ww PAR.. tAx[ L A9f Swd R0.W9 VOFA 11L 0.? L PISIL¢ X-9w Stt - -'\ SITE BUILT SAND FILTER n CONCRETE CURB AND GUTTER V?y 73 VAN ittE 4-933 J2- TE H C1R Px5[ E]Yer- NPACIm P.BTh'E 6'LT3 L RE SFa4WbFR aOiaaP.4 fI19ACitl1 i ?STO Q0.P11fYR L aLW 4PPY q-YR PAVAV OP.1rP4 ML a 9EYry?A3JCttkm W?YOAVE W t6INt vAwRA, W svKff n¢ eR Pmo Easmsca AL w PJP1?044 MSE H JSN113 YlY R VRe X-LN 0' N-EmR XRramAR vxvm a Y%KOSa4 Ymi fE PTRASWi 4 mJ.W.4 fw [E L[.Y.ES'A? n19.i53 RPA.Re fA] 0.1k1LFA.IR PALTi Pax.x Y M e[u34 PAtuS•[t Se[i01 XRx m.S PANA gut!fE W i/0.RA AT TIA I AKRPL9AC e TK cvrtacroe Rrui R Ptsomi tP WA AW exvt9R W ABPA'E PQtAtlF? eLa NASE lm/1't 0.rWffeAR FANG PNOS W 4AaY Y?0.uF PAYYSi aE AL M 1D%t414 Rbt m,gcit vcNl k ?i Im ` PFTifttlW PAWAT PRW ALL Fk4ES S? KfY4 saga aPAN.R11514L PsF a Au Eaten ce aaL.z 3 HEAVYDUTY ASPHALTPAVEMENTSECTION NS KAVr u9rt NIC 4.m .RAtMigga y e' Ape qx*cs% d cr A:rie'ftLE Pwhriw 3!' PMPL ]u,r f11AP a p un t Axa YA?A F IHdi01aA9'KE VI' Wt PASS RW '? dP/V 0.t?aJ?W?7? lA? $ 3/5?aA 11rmswX iP eAv Ar tr ae. 94A9c mu sae 7rI?,?P>?Aw Jpxt SEVPA 1 Att St44 PxM A 39-C1Y 0]fRi4h StS+:q a Step P9 (ASN CN} x PTVKta AAtt vxLa9ACW AS 1s Fr aaEl YAx ce u Aale1®a x SU4 a E9ANMI pMiR 9'W.a lARR Ai PoFl aLE4 Y»: ce u mum a x SkAV uP YS# wxsisP vAVxnT Nu /d]rs MYtd% ?Ltt mm e CONCRETE PAVEMENT i"Kils l/{'v0F wPI m Yeo e?3' ??? ,+Q vrectsr aAPnR as sWP tTnA• aAtws 0 ?s7ku 5ffiA43eR AWS .lL. Yi• '? Aeon 9Kf PNStS HW SuV Vrr? (7\CONCRETE CURB STOP N's Fee frP53 IF RW 9RAfE C.1RE 'ski A BSAT EUa E 0Id la9l4i PANY. SFSiVY D?Atm &6'AA.R L Ir WFY.11 FAXfCI N3 - AMR 3 mas-Tat vAnw ¦.nPav [ Ann a Ytanc ? x ifl FVAT.I ATT CNItt Or. a xw P9 mkxtE w+wesue wu P.w l LVA 14PBtlV QRM WPUAQ BUiI IEEI u I{pAP:S(At6 a AE[a nn-] 0' N.D]I StAMyAmS d em?uwb FR Po45 A`0 StLCPybq S ALL COStuc[a aMT39WLY:IILL1 YH J:Fi fAAR Af0 5FNL4 h 1DYAVAY2 YH k2tlt IiLVUY SbACAm a4t Hitt u12 w vaRR W '12 tm WII A11wi5 s WC1¢Y SECAGN6 r W fENS uo 4wxPAa5 L !iC sglS Ha WV VIXA N1 oA0 a Of333k nCONCRETE FLUSH WI ASPHALT NQ? m FreemanWhite 8815 Red0ak EkW. CfwWe,h'C28217,%93 7 07 4 23 2230 9h 781.52321351.% R?tS3EPI v M.-FU o ie2lw ???Granville G'd'MABNEECJ L'fP%H ISidcae9esL OxbV. RC 17565 EMERGENCY DEPARTMENT ADDITION, BOILER/ GENERATOR PLANTAND RELATED PROJECTS Oxford, NC prgedr..te, ¦ ewamn date ¦ 22JMWARY220,10 ePdid, 0,4' t'd••_ tll,, 731 Y c "s93 fH61MCLa $ q!((A4 Cp4,?,r C-2117 F =y N.C, dram b7 ¦ K4U0ENf tlierAMb( ¦ VdCP eddaclalm ira CONSTRUCTION PLANS DETAILS ¦ CP-14 TPFfr19 P_X YPFA!£ w.rct x?lGR 5YX BASE m? ipPKRR zeaAx Pn>re 1. Sa aE0?:1NS IOt PACO'iAllK{ O%@Kp%1 t 111LW RaiClAla L atAL 4 fR a-SR PANq pPRAtpg PLL 1 M?StAAEtOt YAYOKESE PoA5P4 POP SQPAtaWi WSR.WOF IH 4R M A5%4OTS 41AtWA CaL 5 YLy w AT I.YD Pi-fID1 0F H- ? n PAS Arw A'am;umL w aYgAaWx s Xrv?r Pm mwPw4 L; kRN.1F PPePFP3 H0.laID FN X>WwAR M F N93AS5 N FA PAYSN se[a W F/JJUR XEEaFFPAT PANO 9Ut1 SE R . xcart wwcsu+c ec ?cAw RVAA3'A] AKY.PYMV w scmac XsEN]m RISE [MSY AmA7<YIF,]ESAIR DANA txpt W PYkR 9?0.aP 1AwPNi tPt3 At RO I.'IXR i4 WP. 1. ?YWe41Niff ?A?t FA1Re1kJ PA50.A9 cMRM0 /LL PNSS ff mi 6 wa m¢n?a a N?FAl4Ral SVII d ASPHALT PAVEMENTSECTION m 5-tl r-p' 1'-d Xn%tnP r4a. ar.A Eevs TQ'vaPu vwx?.Aa?E s? ?]t? aittq °rna?od a ? o 1 } q c> o z z P V ?a .?v mo o P n z r, ,- e yt -, 0 0 1 } # c ?+ N 4 ? '?I \ J? ?01=i? Z Q P } i ? ? l? ?!? ? d ? P oQ z w Q r ?? y s}{ f j 1 f? J L }V'f U' zLLI fl. F ? r`1 1111 ? ? ? p 4 ? i+\\ ? U } ! ,1 tg \ u ju con CCU Q Y \ ? \ - \ gay ? •, O ? } o it \ 61 C3Z Wp ¢ _ I, I C) x g ?t cv p`. } ?? I I \? 1 1 r {i I' a w .nn C3 W C?i U) I 4 12 .. a 1 ` F ? _ ?? ? i ?a \ ? ? - s•a a t.. ? ? ? - till Z7 -? Y ajgl • t 5, , mac; ? ? / ?[ _a{} 4" i ¢?Z71 O E E W O Z t"000 0 p O ?s to ttrnWaa p p z ? O Q ¢ d d o O .`yv ?o m p a a o N rn n°°z•-== an 0) 04 y8 O 9 a.-4 - 4 ? lnl 5 O 7 Cl H U-) ? J D U s ° °o w U) z W d V) U Q w z -- LO Z LLJ >= w UOU LL 0 ® o °} W F ?0 €- 0 ° <Z0. 2L V? oY o z ?w I z Q -i o _ w ?Q to L m J o 00 L ZQ Q D ? ? V) U) 0 <0 - L TI 'NIVi A - " N CD ?- . " rn Q ova w X Q W U w " - Q Q F- . F- €A co cr w!E 0 cV - ?QLL ? ofy - LW ? 0 C7 L3 ._1 w zID° w o DIOCG i3 Q o c u u < 6 af rn<o3 N7 U4U? c Z O . 0r N p O ?rnai'd c c ? Om N sx a rn u+ pUZ??c O Z? Y r uv z _ ?4ad3 Q Of 3 0 O r I J V C'4 H s w ¢ 0- < 0 4 ?_ -- i w z LLJ Ld ? t 1 1 1 a- I ? ?? ? s S,? r z SSS S? ' o m to l , t # Lij 0 r I / ??! L z 00 C) C) o \ r \` to ' / 1 1? EiE 9X / j L f 0 ` / 1(3 N ? ; ? 1 l 1 ! L W x j l ! W LJ EI W l r ??z V)z^u ;D Q J z9d ,?? Q Ld €i ` to z Q w ! a W ?? ? CO ? d 9 ?L Im Imo, Elev=470.13' (NAVD 88') LEGEND � SURVEY NOTES: BOUNDARY LINE RIGHT-OF-WAY ^ / VERTICAL 88 CONTROL HORIZONTAL AROLINATSTTATE PLANE COORDINATES NAD 83(NSRS 2007) THIS MAP IS A RESULT OF A SURVEY OF AN EXISTING BUILDING OR OTHER STRUCTURE RAILROAD RIGHT-OF-WAY `I SUCH AS A NATURAL FEATURE OR WATERCOURSE. THIS IS NOT A BOUNDARY SURVEY. U ^ THIS MAP IS EXEMPT FROM NCGS 47-30, AND IS NOT TO BE RECORDED ® — — — LOT UNE v �� -- NOTES 1) HORIZONTAL AND VERTICAL CONTROL BASED ON GPS POINTS SET ON SITE UTILIZING VRS. -- - - ` --- EXISTING CONTOUR MAJOR 2) ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. d a 3) NO BOUNDARY WORK PERFORMED DURING THIS SURVEY. 4 ---- - - --- ---- EXISTING CONTOUR MINOR ) / /y' + \ ALL LOCATIONS OF UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON ABOVE EXISTING ROAD/SIDEWALK EASEMENT ® �I�l i ' ' / GR APPURTENANCES AS WELL AS CONSTRUCTION AND SURVEY DRAWINGS PROVIDED GROUND A URTEN ' � �i/ ��� �' j l`� - BY OWNER, AS WELL AS DRAWINGS PROVIDED BY GRANVILLE HEALTH SERVICES. /6es/ % ' % i \ LOCATIONS OF UNDERGROUND NON-VISIBLE UTILITIES/STRUCTURES MAY VARY FROM — c> STORM SEWER PIPE Q ^% LOCATIONS SHOWN HEREON. ADDITIONAL BURIED UTILITIES/ STRUCTURES MAY BE ��jo Asphalt ENCOUNTERED. NO EXCAVATIONS WERE MADE DURING THE PROCESS OF THIS SURVEY TO ❑ CATCH BASIN '%j /n°r' Parking LOCATE BURIED UTILITIES/STRUCTURES. NO SUE LOCATIONS DONE AT THIS TIME. 5) THIS MAP IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY A FULL AND SANITARY SEWER MANHOLE e z i '' "'"` Lot ACCURATE TITLE SEARCH. �; i / i h i/ !Antenna ~' 6) THIS PLAT IS SUBJECT TO ANY EASEMENTS, AGREEMENTS, OR RIGHTS-OF-WAY OF RECORD C / AMBULANCE 3 +° PRIOR TO DATE OF THIS PLAT, WHICH WAS NOT VISIBLE AT THE TIME OF INSPECTION. SANITARY SEWER CLEAN OUT O Y "~ ONE BUILDING SANITARY SEWER LINE {{ 7) THIS MAP NOT SUBMITTED TO OR APPROVED BY ANY PLANNING AGENCY. 8) ALL BEARINGS ARE GRID BEARINGS UNLESS OTHERWISE NOTED. �� \/ STORY 1040 t METAL Z 9) WITH THE EXCEPTION OF EASEMENTS, ALL LINES NOT SURVEYED ARE CLEARLY MARKED BY W— w WATER LINE BRICK '\ CARPORT 5 DASHED LINES. 4 - �- :- �` j' \\ \ 10) PRECISION = 1 : 10,000+ 11) PROPERTY LOCATED IS NOT IN A FLOOD ZONE, AS SHOWN ON FIRM MAP 3720191300J, D4 WATER VALVE / �'%, /� \ y d a? AMBULANCE PANEL If 1913, EFFECTIVE APRIL 16, 2007, ALSO FIRM MAP 3720192300J, PANEL # 1923, �-� PARKING EFFECTIVE APRIL 16, 2007. 0 FIRE HYDRANT`�1, SHED 12) EASEMENT WIDTHS NOT KNOWN AT THIS DATE FOR UTILITY LINES, IF ANY. '/' 13) LOCATIONS OF ALL FINISH FLOOR ELEVATIONS TAKEN INSIDE ENTRANCE(S). W WA TER METERj i / j / 14) SCALE FACTOR: 0.99998354 ❑t ELECTRIC BOX/VAULT \ 4/ Utilities: LANDSCAPE LIGHT p�o+ c 4>S +a I Time Warner Cable -(800) 897-0662 POWER POLE �� ..._ ��� ; j - > ° � � i , + Progress Energy - (800) 452-2777 a� a� _ Public Service Company of NC - (877) 776-2427 - GUY WIRE / \� -- vw vw — UNDERGROUND POWER LINES /Tdp=4 x.131 ' i{ +k� "�� + A h°. / nv(16)=4 39' I f j'\\` j / / Asphalt / i ! NCOL - (252) 492-4317 / O 6 / _.f._ Inv(out)=471. 7' Parking ! -wv, ---\Nv OVERHEAD POWER LINES Z? I Embarq - (252) 977-9011 !. �O -'' ` '/ f t`\ {� / / Lot / x % Oxford Water Works - (919) 603-1120 © COMMUNICATION MANHOLE o CROSSWALK SIGNAL / �`.,\ / Ex. YI %I' f i "� Asphalt Top=474.60' % Parkin i. o a nv In 473.67 z G GAS SIGN / (tom �� / O= \� / !� h ! �i'v +a Inv(Out)=473.48, s� Y' Lot 9 G\J D4 GAS VALVE a° 9 do / j' - _ g ❑ GAS METER._ ... / w g —g— GAS LINE C1 ` /; %' / 9 0 + b° �' I W ` \l W Ex. JB —uc —uc UNDERGROUND CABLE LINE J - T" 4 \ To FH Ex. SSMH nv(1nn)467.58' r , - } ' - / lev-475 92 Top=471.43' Inv(Out)=467.41' t t UNDERGROUND TELEPHONE LINE / \ \, ,�", Asphalt \ ( \ ' // tia 1 ° \ \ BRANTWOOD 3 E nv(In)=465.44' +° �', %. L \ �ti ' NURSING HOME nv(Out)=465.20' UNDERGROUND OXYGEN LINE a — r * y ' \ � /:. Parkin, \ .�•.> 4,. PVC �� i '�' \ \\r o I 1 \ (NOT SHOO - / -- --z' \ f ✓v"r, a " \{' Ti / - Oe oymv/�/iit V` v \ \ O {+ ;Asphalt -- Parking REEL LiA + Lot V ° 5 RCTREE i \ 4. SHRUB ONE 2 „ STORY NpBRICK a� \ 0c Ex. DI ToP-475.05'FENCE (5'+ 0 ,4 STREET SIGN 9 � � o �U Vo / Ex. S / Top= 7C In n)= NOTES: 1. SITE IS LOCATED WITH IN THE TAR PAMLICO RIVER BAISIN. VICINITY MAP: NOT TO SCALE QUADRANGLE MAP: NOT TO SCALE R& ' �qi\i rv�P�" j �- p \ •/ `� b2°�{ / _ `�� Ih`° I �� a� / l r r .\ \��-._- rte' A > a \ / . i 0� yob• N v /A � � '�, b'�0• � \ � ! /i' i • / / i-- —_ —._ .-____._— _____ _.—_—_-- —__ __—__ �� -kh----- 00 5 _I�p+ Asphalt a°° 44�-45310'' +° 0In)=453.66Drive ut)=453.48 J 0-0 _ - L�b - i / -- r --- - --- _ _ -- ; --- a - — A _ 40 /-`-�� Tz P of -Ditch _ _ �+ �. Op Of D K 4a a� gavel Walk 0-- h } o Ex. JB CB Ex. JB Top 458.40' TO Ex. Ex-\ 455 -- — - n Inv(In)N=452.40' ��B Inv(In)N=453.10' + �o Top=458.O�TC.) — /� '�- Inv(In)W=451.85' Tom• Inv(1n)W=450. ahs Inv(In)=454.40' - Granville County, N.C. _ S nv In S-453.46' PK Nail In nv{Out)=450.70' nv(Out}=453.72' I Oxfor-d--Orphanage Ex. SSMH �. nv(0)t -451.72' Granville Medical Center Top=446.47 �c 8" ( )- orner of Concrete Grand Lodge of N.C. Inv(In)N=436.13' A Deed Book__ Page Elev=457.45' --IInv(In)W=435.85' Inv(Out)=435.55' 0� Ex. SSMH r Ex. FES ' nv=459.62~O Z O• Tap=458.13' I 2„ VCp ' G N Inv(In)=455.62' Ex, SSMH Inv(Out)=455.58' I Top=447.62' SOILS MAP: NOT TO SCALE SCALE 0 25 50 SCALE: 1" = 50' FreemanWhIte 8845 Red Oak Blvd. Charlotte, NC 28217-5593 704.523.2230 phone 704.523.2235 fax S - -Pi ENGINEERING & CoNSIRUCl (DN RALEIGH, NORTH CAROLINA 9 1 9. 7 8 9. 9 9 7 7 1025 Wade Ave. Raleigh, NO 27605 CHARLOTTE, NORTH CAROLINA 7 0 4. 7 1 4. 4 8 80 www.sepiengineering.com infoOsepiengineering. com Granville H EALTH SYSTEM Quality Care... Close To Honze Granville Medical Center 1010 College St. Oxford, NC 27565 Oxford, NC project number ■ 8500200 date ■ 22 JANUARY 2010 seals \`\IllCA Ro lirrrrri 7 ESS/ SEAL = 7490 = G1 NE 9- t!//IIIIIII\� \`�t11111Ir171//,,, \ &ST,,'% OR4 v F , SEAL C-2197 N.C• OC 2010 B Y trrnl11,j1 FreemanWhite, Inc. drawn by checked by ■ addenda / revisions THIS DRAWING REFLECTS ALL CHANGES PREVIOUSLY MADE ON THIS SHEET. VERIFY THAT PREVIOUS CHANGES HAVE BEEN INCORPORATED INTO THE CONTRACT BEFORE PROCEEDING WITH ANY WORK NOT SPECIFICALLY REFERENCED BY THIS REVISION. N.C.D.E,N.R. DWQ - REVIEW BUFFERZONE IMPACT EXHIBIT DRAWING sheet number Q EXHB-01 i ~ 1 ~ l _ _ - ! rl ~ ~ OVERFLO I LEGEND ~ , - e ~ asr-' ~ r / \ ~ ----1i1 .458.00 BUFFER IMPACT AREA asa.oo ~ . ~ ~ - ~ ~ K ~ . ~~h~ M1 ~ ~ ( 453.40 - - BOUNDARY LINE .w - ~ + / - ~ ~ 453.40 - - ~ ~ ~ ~ ZONE 2 BUFFER: 7.031 SF (0.16 AC) - - ~ - F-WAY ~ ~ ~ ~ HAMBE RicHr o ~ T; ~ ~ - ZONE 1 BUFFER; 5,903 SF (0.14 AC) ~ RAILROAD RIGHT OF-WAY ~ ,i ~ ~i i ~ ~ ~ ; ~ ` ~ ~ D 1ER, - e~. / _ ~ " ~ STREAM IMPACT AREA ' LOT LINE ~~P` , 45a . ~ ~ 60 LF PIPE = 240 SF (0.01 AC) ~j-(~~ EXISTING CONTOUR MAJOR ~ ~ , , _ i~ .i- _ _ _ Opp / ~ _ _ - _ _ - _.--455 .454.5 _1 _ EXISTING CONTOUR MINOR ~ ~ ' . t - - ~ SITE DATA 8845 Red Oak Blvd. _ / ~ - - -BUFFER ' _ - / EXISTING IMPERVIOUS: 8.75 AC Charlotte, NC 28217 5593 - - - - - - - - - - - W K EASEMENT ~ . , ~ - _ - 450 ~ EXISTING ROAD/SIDE AL / _ ~ ~ -v STORM SEWER PIPE ~ ~ ~ i ~ ~ ~3 ~ti ~ ~ - - - r 704.523.2230 ass II~~ PROPOSED IMPERVIOUS: 9.76 AC phone ~ ~ 704.523.2235 fax 1 ? CATCH BASIN ~ : ~ ~ • - ~ j ~ ^ 1~ EXISTING PERVIOUS: 6.28 AC _ , - - - _ - ~ _ - i _ ~ _ - " _ ~ PROPOSED PERVIOUS: 5.27 AC n - ~r S SANITARY SEWER MANHOLE ~ - - _ ~ - - ~ ~ i - ~ ~ ~ ' i a - - - ~ ~ as - - _ ITARY SEWER CLEAN OUT ' oa°aOOO o a f~!)itc-h---~-~ ~ ~ ~ i ~ ~ ~ r- a ao o a TOp_-~ a~ aao! X~X~kkX~kX~ ZONE 2 PERMANENT IMPACT: \ 1~ II SAC" 1 C 0 0 OOaO / _ qA - _ ANITARY SEWER LINE ~ ~ ~ °aa°aaaaoa~=~_-_-__ _ - _ ----TtP oE=Dt' . ~ • o\ j rOp a)9' of ZONE 1 PERMANENT IMPACT: )~GIlVEERTNG&CON5IRUCTION - - ~ - ZONE 2 TEMPOI -w -w WATER LINE - Gravel Walk - _ _ -ZONE 2 TEMPORARY ~~tch - - ~ CONSTRUCTION l ~~,--455- V'`----,_` ~ ;.m.~ GRADING 1680 CONSTRUCTION IMPACT FOR RALEIGH, NORTH CAROUNA GRADING 1680 SF 9 1 9. 7 8 9. 9 9 7 7 D4 WATER VALVE - ' ~ 1025 Wade Ave. Raleigh, NC 27605 FIRE HYDRANT tiro CHARLOTTE, NORTH CAROLINA WATER METER 704,714.4680 www.sepiengineerfng.com info0eepiengineering.com o ELECTRIC BOX/VAULT EN~AR D BUFE I CT -GRADING LANDSCAPE LIGHT SCALE: 1" = 40' POWER POLE Granville - - ~ GUY WIRE ~ c. ZONE 2 TEMPORARY HEALTH SYSTEM Quality.Care...Close To Home w c ZONE 2 PERMANENT BUFFER ZONE 2 TEMPORARY v UNDERGROUND POWER LINES CONSTRUCTION IMPACT FROM HOSPITAL DRIVE ACCESS IMPACT FROM UTILITIES 165 CONSTRUCTION IMPACT FROM GranVIlle MedlCal Center UTILITIES 1,681 sF. 1010 College St. - -°vw°-- --°wv~--- OVERHEAD POWER LINES 350 SF. SF. 8~'~ P COMMUNICATION MANHOLE 6~'qd 0. .0. O '0' Oxford, NC 27565 ~~P CROSSWALK SIGNAL ~~P ~ N Op OOp o GAS SIG p0 p 1, ~o cv e GAS VALVE - Z ~ R , ~ ~ EMERGENCY g? GAS METER ~G ~ DEPARTMENT a - - g GAS LINE 9 - ' - _ _ _ _ ADDITION, -uc -uc UNDERGROUND CABLE LINE 1 - - t - t - UNDERGROUND TELEPHONE LINE - - ~ BOILER op of Ditch M M M , _ _ YGEN LINE ~ ~ M /1 r:: o°oogo8a°o°8 Top of Ditch UNDERGROUND OX I Top of Ditc 'S h ~'5 ~ o°o0°00°00°0°0°00° G E N E RATO R ° _ Top of Ditch TREEL/NE Gravel Walk _ cra~e~ wail< PLANT AND V ~ TREE ZONE 2 PERMANENT BUFFER ZONE 1 PERMANENT BUFFER ZONE 1 TEMPORARY SHRUB IMPACT FROM HOSPITAL IMPACT FROM HOSPITAL CONSTRUCTION IMPACT FROM ZONE 2 PERMANENT BUFFER CONSTRUC110NRMPACT FROM RELATED IMPACT FROM UTILITIES 460 UTIUTES 1,8x2 sF. PROJECTS X FENCE DRIVE ACCESS 4,263 SF. DRIVE ACCESS 6,411 SF. HOSPITAL DRIVE ACCESS 717 SF. SF. e BUFFER ENLARC~D BUFFER IMPACT P - - PROP. CURB AND GUTTER ENLARGED BUFFER I PACT P - tmLmES Oxford NC SCALE: i" = 40' SCALE: 1" = 40' ~ ~a~~ CATCH BASIN DRAINAGE AREA 465 PROP. CONTOUR MAJOR 464 PROP. CONTOUR MINOR ~ - P~` ! ~ "6. Ir,,, ~ ~ 4~~ ~ ~ ~oR G . ~ BRICK ~t 11 Gos valve ; . 5 1~ P~ 1 @ V o ~ ,Ifl t .Z, A 1 '1 ~ project number .d -PROP. STORM SEWER j & Piping , e`~0D ~C ~,0 A G ~ ~ ~ 475 _ , . - ~ ~ ' I~ ~ ¦ $500200 ~ ¦ PROP. STORM INLETS '~e: ~ m „ S~OR ~~G ~ `a y. , , V 009 A ~~t, ~,4~'~ r~, , r' ^1 ~ PROP. STORM INLETS i n~~ ~ ~ t . 5 ~ ~ ~ j ~ date M M PROP. WATER LINE / ~58~~. ~ ~ ( ~ I _ ',~~.o. ~'u.~~~' ~ r ~ ' ~ ~ ~ ~ ~ BFP PROP. BACKFLOW PREVENTER ~ ~ ~ ~ ~ 22 JANUARY 2010 - - ~ ~ ~ J ~ ~ PROP. WATER METER ~ ~ ~ r ~ ~ k.+>~ ~ i ~ 3~~ _ O/ 4d Y-qt% I / 7 ~ i a / 7 / ~ ~ / l ~ HY RANT ~0 s~ ~ \ , , ~ ~ , PROP, FIRE D 4 ~ ~ 4n ~ _.~U , S ~ _ ~ ~ ~ - - a~2 i~ ~ ~ ~ Seals ~~~~nulliirrr r~ / ~ CA Rp PROP. WATER LINE GATE VALVE ~ ~ ! ~ - - _ce- ~o~ , W ~ ° ti ~ ~ - " 0.24 Ac ~ PROP. SANITARY SE ER ~ , ~ ~ _ > -h73~ ~ ~ i` ~ / ; ~ ~~FESSlp,~~ 9 1 r ~ C.0. PROP. SANITARY SEWER CLEAN OUT a , ' ~ ~ ~ v-~ ~ _ - ~ ~ ,4~z--`" 47 ~ ~+i, a ,1 ~ _ PROP. SANITARY SEWER MANHOLE Mr ~ '0 - " ~ - I ~ / l( ` ~ / % i / - ~ SEAL l a1o ~ I / / ~ = 7490 = ~a. - ~ - ~ / _ --hi~~-~ PROP. SILT FENCE h ; ' ti . a. w.w,w„u . w..~, i ~ r~~e ~ ~ / ~ ~ ! / ~ FN PROP. FUEL LINE s ~ j ~ o ALL.. ~ ` ~ ~ 4~0 ~ / I ~ - y'o Ex~~~,a, ~ ~ I / % ~ ~1NE _-uK-._______.------_--- __._~;u PROP .OXYGEN ALARM ~ \ \ ~ ~ ~ . ~ ~ ~ ~ M ~ P ur _ _n.__-_~~_._-- PROP. OXYGEN \ p ~ ~ ~Z38~M. _rvivm Uib iiuiu/rrri•i ~~io i n /v na.7 iv i viii r i !i ~ ~n.uf~;v~ ~ ~ ~ ~ ~ ~ ~rr~~lnnll~~~~~ ~ '0 8~ 13181' ! CB / PROP. HIGH PRESSURE STEAM _ GRANVILLE FAMILY - 0.03 AC' / ~ ~ ~ Concre`ke ~ ~ ` 0.03 AC ~nc~te ~ ~ ~ ~ MEDICINE, P.A. ~ ~ PROP. PUMP CONDENSATE `--46°~ ~ ` ~`G g f ~ - --fl~elic~c pt~r p I.~ ~ f ~,.o. a t i ~ ~ ~ '~°,~""""'~T1d ' a~ ~ O ~~~b.~'?~,. ~n ~ ~ i ~1111I11117f! ~ ~ GRANVILLE MEDICAL CENTER ~ SUITE 1012 1~ Op PROP. ACID NEUTRALIZATION ~ 1010 COLLEGE ST + ' v;; SRL o MULII-LEVEL BRICK BUILDING ~ ~ PROP. SECONDARY ROOF DRAIN k~ ~ l A ~ ~ . ~vnn ~ ,B,G PROP. FIRE DEPARTMENT CONNECTION ~ , , 2z~; ay'~~~' Ex. rave Rd. QL ~ ~ I ~ ~ (Width ties ~ V F ~s ~ 1: y'~~~a' / ` ~ g i _ / C-2191 - ~ ~ ~ ! i ~ A\ ~yb.\~ v ~ .-.1/ r ~ 1 ~ / / ~ N. C ~ ~ ~ % '~'CB A ~ ~ ~ a ~ ~ 0.20 AC 'A3 halt V b ~ C.0. IRA RATED ! P ~ xs z / a ) € ; k6s PARK G~ / _ //f i ~ i ~ ©20106Y rrrriillltii~~~~~ x AREA___ - _ ! l j' ) I FreemanWhfte, Inc. % Parking s ~ a ~ 65 ~ Lot ~ 4,.83 ~ ` ~ ~ a • ~ ~ ~ I / ~ s 0 AC ~ ~ Ac ~ o~--- ~ ~ - - , i ~ ~ ~ drawn by i ~ _ ~ .o. ~ # _ r' I / ~ ~ ~ ~ i { i _ , -L, ~ ~ ~ ~ _ ~ - - / i az 1 _a6z-~"'' ~ ~ / % - _ - _ ~ ~ checked by ~ ~ I f o ~or - ~ ~ ~ ~ - - f - -'._r- ~ ~ ~ ° ~ ~ /------y r _ _ ~ I / / ~ _ _ - - / / ~ / ~ i~~~ _.-456 a ~ ~ . . ~ ~ / / - addenda/revisions - ~ / J - `'~-~-.~5~-'''\/ ~ ~ ~ - ° " NO NAME DATE RI .4sa.oa ~ - A \ w ~ - , . I ~ ~ ~ ro ~ I 453.40 i ~ - J ~ % ~ - MENTATION _ ~ J _ ~ ~ `~CHAMB ~ i ~ F 5 ~ / . CB 2 : j A ~ ~ \ ~ ~N;'A ~ € ~ ~ ~ 1 i' D T~ - 1 i ~ Zg .Or / C " ~ A \ ~ ~ ~ g1. - \ ~ ~ 6 l ~ ~ i _ r ~ V~ ,,i- A 1 ~ ~ 0.07 c ~ i3 ,~~P _ + /i ; ~ .a ~ Est as ~ p 0 . _----a55 - X52. i i ~ ~ - - ~ - ~ - .s ~ , = ~ + I ~ . , ~ , 60 r ~ s .OTC ~ • . ~ - ~ \ ~ ~ ~ r ~ ti52 - - % ~ a ~ j~°~-~ -~-MA ~ ~ ~ ~ , - ~ ~ ~ THIS DRAWING REFLECTS ALL CHANGES , a" ~ _ _ - - ~ _ / i' PREVIOUSLY MADE ON THIS SHEET. VERIFY _ _ _ _ ~ ~ ~ - i - IW~ r- - ~ ~ _ - ~ - - _ - s / ~ ' - - l ~ i - _ / ~ o-y : - ~ _ ~ ~ _ NCORPORATED INTON HE CONTRACT BEFORE ~V~ j ~ n ~ ~ ~ ~ ~ \ ' - - PROCEEDING WITH ANY WORK NOT - ..t - °°°o°oaaa o Top_ of-DitC-tt----` _ ,1 ~ ~ n ~ . ~ - _ - 0 0 0000 i - , , ~ ~ "~--ss2~- \ i%~ a4o SPECIFICALLY REFERENCEDBYTHISREVISION. -M M M M - - , ~ - ~z ~ ~ o 0 oa o RIP-RE1P 14 X25 X2 - ~ ' ~ 9/ - - C ~ Gravel Walk ~ = I P o., iti=h ~ ,~s94°~ °p °f p~fch N.C.D.E.N.R. ' ~ \ _.4as- - _ _ DWQ REVIEW ~ FLARED END SECTION - INV: 449.50 ~ 60 lF 48" RCP ZONE BUFFER IMPACT ® a 1.2.570 EXHIBIT DRAWING EX. FES TO BE REMOVED AND REPLACED WITH YARD INLET TOP: 455.00 sheet number ENLARGE BUFFER IMPACT PLAN -ME PLAN INV IN: 448.96 SCALE 0 20 40 SCALE: 1" = 40' INV OUT: 448.76 03 I CIO _ ® EXHB-02 SCALE, t - 40 l.-