Loading...
HomeMy WebLinkAboutNCC204837_NOI Application_20201027Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 10/22/2020 1:40:48 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 10/26/2020 2:25:53 PM (Review- Construction NOI 33836) • The task was assigned to Garcia, Lauren V by round robin distribution 10/22/2020 1:41 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 26, 2020 5:00 PM. The priority is: High 10/22/2020 1:41 PM Submit by Selkane, Aziza 10/27/2020 10:38:00 AM (Payment Verification for NCC204837) * Kevin T Mason • Selkane, Aziza assigned the task to Selkane, Aziza 10/27/2020 10:37 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 7, 2020 5:00 PM. The priority is: High 10/26/2020 2:26 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Duke Energy Windmere 100 kV Phase I (Tower Raise) 1 b. Specific Lot This field nay be used to list specifc lot numbers. Numbers 2. County* Rockingham 3. Highway or Street Hamlet Road Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Reidsville 5. State * NC 6. Zip Code * 27320 7. Latitude* Enter the latitude in decirral degrees 36.4664 8. Longitude* Enter the longitude in decir al degrees (M.JST be negative) -79.7061 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/28/2020 Estimated Construction Project Start Date 10. Date to End * 12/28/2020 Estimated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial Cassification for Leveloprrent 12. Acres to be 3.70 disturbed* (including off -site borrow and waste areas) 13. Total site area 50.00 (acres) * 14. Post- 0.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-ROCKI-2020-Duke Energy Windmere 100 kV Phase I (Tower Tracking ID Raise) Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Town Creek Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 22-42 Index No.* NCWaterbody Index Nunber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Carolinas, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Randy If Corporation, enter Faegistered Agent First %rre 3. Last Name* Veltri It Corporation, enter Registered Agent Last %rre 3b. Title Manager, Permitting 4. Permitee E-mail randy.veltri@duke-energy.com Address* 5. Permittee 704-380-2741 Telephone No.* 6. Permittee Mailing Street Address Address* 526 South Church Street Address Line 2 Mail Code EC09Q C7ty State / Frovince / Fbgion Charlotte NC Fbstal / Zip Code Country 28202-1802 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 526 South Church Street Address Line 2 Mail Code EC09Q Qty State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28202-1802 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Eric Contact - First Name * 2. Primary Site Shook Contact - Last Name * 3. Title Sr Engineering Technologist 4. Site Contact E- eric.shook@duke-energy.com mail Address* 5. Site Contact 336-416-9168 Telephone No. 6. Organization Duke Energy Name 7. Site Contact Street Address Mailing Address* 700 East Ritchie Road Address Line 2 700 East Ritchie Road city Salisbury Postal / Zip Code 28146-1381 8. Consultant Name (Optional) Brooke Ahrens First and Last nacre 9. Consultant E-mail Brooke.Ahrens@hdrinc.com This person will be copied on all correspondence. 10. Consultant 704.338.6847 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/22/2020 Approved * 2. E&SC Plan Project ROCKI-2021-014 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan ROCKI-2021-014_20201022_Approval_Express.pdf 7.56MB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Windmere Line Raises.pdf 648.28KB Mast be RDFformat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-Wind mere Line Form 457.29KB Raises.pdf Mast be FDFformat This is an Express r No Review Project* F Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Randy Veltri Title Manager, Permitting Organization Legally Responsible Entity Duke Energy Carolinas, LLC Date * 10/22/2020 F. Tracking and COC Info NOI Tracking No. 33836 NC Reference No. NCG01-2020-4837 Uses 'count_nunber' variable (increrrented by SP) Certificate of NCC204837 Coverage (COC) Uses 'count nurrber' variable (increrrented by SP) No.* Count Number 4837 Sequential nunber for subnittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC204837-2020 Invoice Due Date 11/25/2020 Initial Fee $ 100.00 Invoice Status OPEN