HomeMy WebLinkAbout20201557 Ver 1_20201557 Stream_Buffer Request_20201026RECEIVED OCT 26 2020
ROY COOPER
MICHAEL S. REGAN
sl- „,
LINDA C'ULPEPPER
Duv o
1v10 15'� 1
f rl vfronnl errm f Quality
Express Buffer Applicability / Stream Origin
Determination Request
Property Owner Information
1. Owner Information (corporation/individual who is legally responsible for the property and Its compliance)
Sa. Name(s) on Recorded Deed DuPont Industrial Biosciences USA LLC
1b• Responsible Party (for L-C)
DuPont de Nemours
1c. Mailing Address
914 Centre Road, Wilmington, DE 19805
1d. Telephone Number 252-559-7038 Se. Email address I George.T.Xenakis@dupont•com
2. Address of Property or Location of Project Site (including county, nearest named town, and highway or road name/ number):
NC Route 11, 0.4 miles south of intersection with Canady Road. Approximately 7 miles north of Kinston, in Lenoir County.
3. Agent / Consultant Information
3a, Agent/ Consultant Name
Patrick Covll
3b. Company
Dewberry Engineers
3c• Mailing address
2610 Wycfliff Rd, Suite 410, Raleigh, NC 27607-3073
3d. Telephone no.
919-424-3763
3e. Email address
pcqvll@_qewiDtliy.com
4• Project / Site Information
4a. Name of project
DuPont Bioswale
4d. River Basin
Neuse
4b•County
Lenoir
4e.Lat/long
35.3267 11.,-77.479988
4c. Nearest Named Stream
Neuse River
4F. Number
Stream Calls
1
5. Project Description (attach plan if available)` -
Construction of a bioswale in Outfall 002 for metal removal.
6. Has anyone from DWO visited the site?
Y Yes
N
Staff Name: Chris Pullinger
Date of Visit:
8/17/20
7. Does DWR staff have permission to
access this property?
y yes
N
8. Attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey r.
If you are unable to locate either of these maps, please contact the DWR Washington Regional Office for assistance.
DWR Use Only: Is this determination for the purpose of Buffer mitigation? Nutrient offset credit?
ruin ruirmgel
943 Washington Square Mall Note: Submittals on Friday after12:00pm
Washington, NC 27889 Will bestamped as received on the
Email: Chris.Pu,Jinper nrdennUov Next business day
Please contact Chris Pullinger at the Washington Regional Office at (252) 949-3922 if you have any
questions,
U`
l
tiorlh Cmolim Depnrfinent of Emiiunmental Qnalily Divisions NVamr Resnnmcs- Wuhingtun Regional Office
99', Weshinglon Square M.111. \Vashingtnn. \mlh Carolina 27889
RECEIVED OCT 26 2020�
,. ,..
.Nd.O"'�
ROY COOPER Iq OR`rl CAROL INA
Eri0ronmrrrrnf Qualt{y
c i"I"lerr
MICI IAB, S. REUAN
Se, rehor
LINDACULPEPPER SAMPLE AGENT AUTHORIZATION FORM
Dipe' for
PROPERTY LEGAL DESCRIPTION
LOT NO. PLAN NO. PARCEL ID:
STREET ADDRESS: 4693 Hwy 11, Grifton NC 28530
Please print:
Property Owner: DuPont Industrial Biosciences USA LLC
Property Owner: DuPont de Nemours
The undersigned, registered property owners of the above noted property, do hereby authorize
Patrick L Covil of Dewberry Engineers Inc
(Contractor / Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
914 Centre Road, Wilmington DE 19805
Telephone:
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge,
Gc- V-tN6 lc E u�c��yS
Authorized' rint Name Aut 7orize I Signat re
� 0/ 16 1nAtp. L o/ I b i 20 2-0
1
North Carolina Depmlmenl of Lnvlronnienial Quality DiN mon orml.ml Revow"a - Wa,hin mon Regional Office
943 \A'oehtnglon Square Mill, Al au hwplton, North Corolioa 27889
252-946-6-18I
Dewberry
October 20, 2020
RECEIVED OCT 26 2020
NCDEQ
401 & Buffer Permitting Branch
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
Reference: DuPont Bioswale Project — Outfall 002
Lenoir County
Dewberry Project No. 50128795
Dear Mr. Pullinger:
Dewberry Engineers Inc. 919.881.9939
2610 Wycliff Road, Suite 410 919.881.9923 fax
Raleigh, NC 27607 www.dewberry.com
Dewberry Engineers Inc. (Dewberry) is submitting an express review request for a stream/buffer
determination for a ditch on the DuPont property in Lenoir County. As recorded in the attached email, we
propose that Outfall 002 is manmade and not subject to the Neuse River Basin stream buffer
requirements. It is our understanding that you visited the DuPont site on August 171h, 2020.
Our submittal includes:
• 1 signed original of the Express Buffer Applicability / Stream Origin Determination Request
form
• 1 copy of the current USGS quad map indicating the project location
• 1 copy of the Outfall 002 history presentation, prepared by DuPont
• 1 copy of the 1904 historical USGS quad map
• 1 copy of the 1983 historical USGS quad map
• 1 copy of email sent on August 241h, 2020
• 1 check (#115841) for $200.00
Should you have any questions or concerns, please feel free to contact me via phone (919) 424-3763 or
e-mail (pcovil@dewberry.com).
Sincerely,
Dewberry Engineers Inc.
Patrick L. Covil, P.E.
Project Engineer
v s0 1287'')swamT(s%N,uwemr,, Page 1 of 1
9'PATE GbNOR M GROL(NA
US. GEOLOO[CAL 89INFY JAgOLMES. STATE 6ftOI1JGIS, NOF (:AROLINA
HAFLEBD WN_-C DIAF.O'NR leRSGH fMM1 .51GNYR F AnRIC t'I V' 1 AYDEN OUADR. GN
r .
aryt 9
Pmd.nMlte �
z� r
0 W N,- 144
�rmn 31
V • � :;_il � �� la,_�nlr a I.
MT ED SIAM MMTNFM OF NPNPPL NFSOONCFS V '••XORDI CMOWH W
!a. DEPARTMEM OF THE INTERIOR o CO uN n M 01M 4. ps ro¢ w�� GEOLOGICAL SURVEY RECEIVED-0CT 26 202U"n"°' - � °""
MIYIP£ 5 IiOPOGWWHIQ
rF rs t �
C
/
z.
t +
Downstream ditch systemj�
\ e
Outfall 002
�
F
\
I � \
A.
i
/ ♦ 1 •� z.
�e 'nmu'.e NNm ANONAmnC.MaNxa
ca..A .XDNNN..�..e Nv,.v.Nr,.,.....,.. � s>
�.w.aw..9...x�x.x..NFm-NA. "a9NOV _, �.a.._....�.....-,� r....Xrn.... ia.......+
XN...w,.m.Norom.N.N..Xancw¢wax. ¢ fey..,.
' °Wm.mxy:,'„- '¢ I GRIFTON, N. C.
.,. a.-1.111NN A' "IT ¢,,,a w.¢.. 1.IT—
x..m.ex.N�..,
A,.rv<Narvs
¢o oX
sxet'uteNvwN n r¢¢a 'rqude moFwu,x xX,AN,A—s nvn.,we m xrwae fON, uFN NNI.Fxi S9
RECEIVED OCT 26 2020
Covil, Patrick
From:
Covil, Patrick
Sent:
Monday, August 24, 2020 10:31 PM
To:
Pullinger, Robert C
Cc:
Ross, David; Mcdaniel, Chonticha; Maher, Niki; Goss, Stephanie; Dudley, Leigh -Ann;
Hardison, Lyn; Thompson, Emily B CIV USARMY CESAW (US); Carpenter, Jon David
Subject:
RE: [External] Bioswale construction in Neuse River buffer
Attachments:
DuPont Kinston Site at Outfall 002.pptx; NC_Ayden_1904_62500.pdf; NC_Grifton_1983_
24000.pdf
Chris,
I understand that you visited the DuPont site to look at Outfall 002. We appreciate your making time to view the site.
We'd like to share some additional information as evidence that Outfall 002 is a manmade conveyance. DuPont put
together the attached presentation of the history of the site and Outfall 002. In addition to this presentation I have
attached two historic USGS maps (printed to pdf, not -to -scale):
1904 map showing the beginnings of the ditch system, but not yet complete.
1983 map, showing Outfall 002 as a "stream" but also indicating that the water courses downstream of Outfall
002 are ditched. The ditches intersect at right angles and one ditch crosses another as a "tee". The receiving
ditch downstream of Outfall 002 crosses a drainage divide and drains both to the south and to the north.
In addition to the history of Outfall 002, it is currently in use as a spill containment basin.
Please let us know if you would like to discuss anything over the phone or if we can answer any questions.
Thanks again,
Patrick
Patrick L Covil, PE, CFM; LEED AP
Project Manager
Dewberry
919.424.3763
From: Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Sent: Monday, August 3, 2020 4:48 PM
To: Covil, Patrick <pcovil@Dewberry.com>
Cc: Ross, David <dross@Dewberry.com>; Mcdaniel, Chonticha <chonticha.mcdaniel@ncdenr.gov>; Maher, Niki
<niki.maher@ncdenr.gov>; Goss, Stephanie <stephanie.goss@ncdenr.gov>; Dudley, Leigh -Ann
<Idudley@Dewberry.com>; Hardison, Lyn <lyn.hardison@ncdenr.gov>; Thompson, Emily B CIV USARMY CESAW (US)
<Emily.B.Thom pson@usace.army. mil>
Subject: RE: [External] Bioswale construction in Neuse River buffer
[CAUTION] External Email. Do NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all
suspicious emails.
Mr. Covil (Patrick),
First, thanks for your patience, and I apologize for my delay in getting back to you. I'm looking at the e-mail chain now,
and from your description of what's existing, as well as what I think Niki had mentioned in an e-mail, if the bioswale and
DuPont Kinston Site
Development of the Property
to
YLUN PLANT V �:)LUU17tLD
0
�'Factory to lSlote]Be,,r�.weeii
00ty and Grif ton oin., 635�Ac-lre' Farm
Plant I —"
Operations
Location Of New Nylon Plant
Work by Local, Slate
Leaders Rewarded by .
Addition of Industry
BydAIIE sTROTH88 -
Climaxing rumors that had been circulated here sin
negotiations began early this year, the E. I. du Pont de IS
mours & Company of Wilmington, Delaware. announce
Tuesday that it had secured an option on the Henry B.
Canady farm between Kinston and Grifton and would. wit
in the next 18 months erect a nylon yarn plant there, which'+_
will employ 1.200 people from the beginning_ More than
90 per cent of the workers will be local people, who wil%'
be trained for their tasks.
In making the announcement to The Free Press, A.
,Buchanan, Jr., assistant general manager of du Pours.
Rayon Department, said: "We are looking forward with
(pleasure to this new location in the South. We have mut-
ually fine relations with the people where our other plants
Tare located and we will be working closely with the people
1 of the Kinston area from nowiietds, viee-president of tae ACL
Buchanan was accompalrrn charge of traffic: L. S. Jef-
Filson, manager of the tiyl0 fords, vice-president in charge of
isib-tantmanager; William T�operations; C. G. sibley, assis-
tant vice-president in tharge of:.
i duction, and Charles H. Rutle{operations, and Julian H. L'
(department. industrial agent, for the A4
.—_——3Coast Line Railroad_ frnv,.
m
M
m
m
DuPont Kinston Plant
I
CD
Aerial Photo taken beforaD
the mid 1970s when
ti
construction began to
0
expand production.
Stormwater culvert (Outfall
002 today) to ditch line
(flowing south) that ties in
with the farm ditch (flowing
east) forming the property
line. That adjoining
property is still farm land
today.
The site was built up to as
part of site development
for construction before
1953.
_
M
-
C
j
/ t
fS /
r
L
!!!t
Y
Y
n
xY f44
[/
Location of Culverts 54" & 36" diameter
Lower Valve -