Loading...
HomeMy WebLinkAbout20000783 Ver 2_Staff Comments_2010032700-0783v2 Traditions Southwest, Wake Forest AML comments March 27, 2010 1. The DWQ does not accept the submitted SMP received on February 26, 2010 as meeting the requirements of the 401 Stormwater Program for the following reasons: a. Proof of the Town of Wake Forest's approval has not been provided. b. The overall Stormwater Plan shown on sheets C-300, C-301 and C-302 does not depict any stormwater BMPs other than one level spreader shown on sheet C-302. The locations of the proposed wet detention pond and the bioretention areas are not apparent on these sheets. c. The plans submitted are not stamped by an appropriate design professional. d. It appears that some of the stormwater from this site is being discharged directly to one or more level spreaders without first passing through a BMP that provides 85% TSS removal. Under the Town's Phase 11 stormwater program, this project should clearly be designated as high density and therefore appropriate stormwater treatment should be provided. e. The wet detention pond appears to be undersized.