HomeMy WebLinkAbout960002_SSE letter_20201026ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Deborah M. Balance
Legacy Farms
604 Benton Pond Road
Fremont, NC 27830
Dear Mrs. Ballance:
NORTH CAROLINA
Environmental Quality
October 26, 2020
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS960002
Legacy Farms
Animal Waste Management System
Wayne County
The Division of Water Resources (Division) received your sludge survey information on
September 23, 2020. With the survey results, you requested an extension of the sludge survey
requirement for 93 and 94 lagoons at the Legacy Farms facility. Due to the amount of treatment
volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a
sludge survey is not needed until December 31, 2025.
The next sludge survey for lagoons 93 and 94 at the Cottle Farm should be performed before
December 31, 2025. Please retain this letter and keep it with your farm records for reference.
Due to the amount of sludge in lagoon #2, at Legacy Farms, a Sludge Survey Extension is
required by December 31, 2020. However, since the last survey was performed on December 12,
2018, if you have performed a sludge removal since that time, another current sludge survey may
be submitted for consideration.
Please call me at 919-707-3663 if you have any questions.
Sincerely,
3 a,�l A. 171,+, lap
Bill Dunlap
Animal Feeding Operations Program
cc: Fayetteville Regional Office, Water Quality Regional Operations Section
Permit File AWS960002
DNorth Carolina Department of Environmental Quality Division of Water Resources
E Q��
_ 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
NORTH CARD OapartmeM ofEnviw
ronmenWl Uual� p ` 919.707.9000