Loading...
HomeMy WebLinkAbout20190425 Ver 1_PLANS SET RE Ext PNG - Killian Ck Stream Restoration_20201020Strickland, Bev From: Darr, Alex <DarrA@pondco.com> Sent: Tuesday, October 20, 2020 2:52 PM To: Johnson, Alan Cc: Perez, Douglas J; Barksdale, Flynt Subject: RE: [External] Piedmont Natural Gas - Killian Creek Stream Restoration Attachments: DukeMarshallStreamRestoration_IssuedForPermit_07.27.2020_Reduced.pdf • 1 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ELort.spam@nc.gov Alan, See the attached PDF for the Issued for Permitting set of plans for the project. I will send out a meeting invite for November 3 at 1:00 pm. If you have conflict at that time, feel free to suggest a new time. Much appreciated, Alex Darr Environmental Scientist I Environment and Water Resources Pond 13500 Parkway Lane I Suite 500 Peachtree Corners, Georgia 30092 T 678.336.7740 1 F 678.336.7744 1 Direct 470.678.8899 www.Dondco.com 1 *78 1 Top 500 Design Firm I Engineering News -Record (ENR) ® Lq ®0 NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and delete the material from any computer. From: Johnson, Alan <alan.johnson@ncdenr.gov> Sent: Tuesday, October 20, 2020 2:38 PM To: Darr, Alex <DarrA@pondco.com> Cc: Perez, Douglas J <doug.perez@ncdenr.gov> Subject: RE: [External] Piedmont Natural Gas - Killian Creek Stream Restoration IEXTERNAL EMAIL Can you forward the proposed stream plan to review. Tentatively, I can do the 23rd, Nov 3 and 5..... are the earliest DWR Division of Water Resources 1 Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax:(704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Darr, Alex [mailto:DarrA@pondco.com] Sent: Monday, October 12, 2020 3:44 PM To: Johnson, Alan <alan.iohnson@ncdenr.gov> Cc: Barksdale, Flynt <BarksdaleF@pondco.com> Subject: [External] Piedmont Natural Gas - Killian Creek Stream Restoration External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to owunmmm@nL.gov Hi Alan, I am following up to a voicemail I just left you. Our team spoke with you earlier this year regarding an upcoming project near Denver, North Carolina along Killian Creek. We have submitted the electronic PCN and associated request for express 401 water quality certification. If you will, please give me a call at your convenience (Office: 470.678.8899 or Cell: 336.899.9806). Thank you, Alex Darr Environmental Scientist I Environment and Water Resources Pond 13500 Parkway Lane I Suite 500 Peachtree Corners, Georgia 30092 T 678.336.7740 1 F 678.336.7744 1 Direct 470.678.8899 www.pondco.com *78 1 Top 500 Design Firm I Engineering News -Record (ENR) U mi MOO NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and delete the material from any computer. CONSTRUCTION DOCUMENTS FOR: 0 CD x DUKE MARSHALL STREAM RESTORATION OWNER/PERMITTEE Piedmont Natural Gas Jason A. Brown - Senior Project Manager 4720 Piedmont ROW Drive Charlotte, NC 28210 (704) 731-4681 CIVIL ENGINEER Pond & Company Andrew Swift 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 (678) 336-7740 ENGINEER'S REPRESENTATIVE Jeremy Dean 3050 Westwood Drive Acworth, GA 30102 678.525.3764 CPESC# 00004207 Expires - 01 /18/2021 Total Site Area: 6.30 ACRES Total Disturbed Area: 6.30 ACRES Parcel ID#: 02293 PIN#: 3694378614 Parcel I D#: 74449 PIN#: 3694291204 Parcel ID#: 02295 PIN#: 3694390080 FIRM # 3710369400J Zone X, Zone AE Zoning: Utility Right -of -Way, Adjacent Undeveloped Private Property GPS COORDINATES OF CONSTRUCTION EXIT: LATITUDE: N 35031' 03.890" LONGITUDE: W 81 °02' 40.665" CAUTION THE UTILITIES SHOWN ARE SHOWN FOR THE CONTRACTOR'S CONVENIENCE ONLY. Know what's below. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THE DESIGN PROFESSIONAL ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT Call before dig. SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF you ® v Ai UTILITIES WITHIN THE LIMITS OF THE WORK, DAMAGE TO EXISTING UTILITIES BY Dial 811 THE CONTRACTOR, FROM HIS/ HER OPERATIONS, SHALL BE THE SOLE Or Call 800-282-7411 RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL BE RESPONSIBLE TO SECURE THE SERVICES OF A PRIVATE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPACTION OF BACKFILL OF ALL UTILITY LOCATOR FIRM DURING THE ENTIRE COURSE OF CONSTRUCTION. UTILITY TRENCHES WITHIN SITE WORK LIMITS, THIS INCLUDES TRENCHES DUG CONTRACTOR SHALL PAY FOR SAID SERVICES. CONTRACTOR SHALL IMMEDIATELY AND BACKFILLED BY LOCAL UTILITIES, SUCH AS POWER, GAS, TELEPHONE, REPAIR ALL UTILITIES DAMAGED BY CONSTRUCTION ACTIVITIES, AT NO ADDITIONAL ETC. CONTRACTOR SHALL PROVIDE ADDITIONAL BACKFILL AND COMPACTION COST TO THE OWNER, AS NECESSARY, IF SETTLEMENT OCCURS, LINCOLN COUNTY, NORTH CAROLINA J U LY 29, 2020 POND PROJECT # 1190706 fin C,- Ce Pg to ut"d 1B Little Cr vet Per' Denver Little fy Creek � Cove PROJECT Ax ALE LOCATION Me �c . t' k_9 J/y _ 4 4 2 VerdictIr s Ridge r rn An de,►sa T CIL �l N Last 0 0.5 1 2 Ole Linton, Miles' VINCITY MAP (SCALE AS SHOWN) eY 00 �o4nMaple a v 1 G `qh Horace LA tG - 4� it a oa u a a r � N 4 PROJECT LOCATION c r`Q a a � o°r g t 0 0.25 0.5 1 Miles PROJECT SITE MAP (SCALE AS SHOWN) ISSUED FOR PERMITTING FOR REVIEW ONLY 3500 PARKWAY LANE, SUITE 500 PEACHTREE CORNERS, GA 30092 PHONE (678) 336-7740 FAX (678) 336-7744 CONTACT: FLYNT BARKSDALE Sheet Index Sheet File Sheet Title Sheet Number G-000 COVER SHEET 1 C-001 GENERAL NOTES 2 V-001 EXISTING CONDITIONS SURVEY 3 C-002 PROJECT SITE OVERVIEW 4 CS101 STREAM RESTORATION PLAN & PROFILE 5 CS102 GEOMORPHOLOGY AND CROSS -SECTIONS 6 CS103 STREAM RESTORATION STRUCTURE DETAILS 7 CS104 STREAM RESTORATION REVEGETATION PLAN 8 CE001 EROSION AND SEDIMENT CONTROL NOTES 9 CE002 EROSION AND SEDIMENT CONTROL NOTES 10 CE003 EROSION AND SEDIMENT CONTROL NOTES 11 CE101 INITIAL PHASE - EROSION AND SEDIMENT CONTROL PLAN 12 CE102 INTERMEDIATE PHASE - EROSION AND SEDIMENT CONTROL PLAN 13 CE103 FINAL PHASE - EROSION AND SEDIMENT CONTROL PLAN 14 CE501 EROSION AND SEDIMENT CONTROL DETAILS 15 CE502 EROSION AND SEDIMENT CONTROL DETAILS 16 CE503 EROSION AND SEDIMENT CONTROL DETAILS 17 CE504 EROSION AND SEDIMENT CONTROL DETAILS 18 PROJECT DESCRIPTION (NATURE AND PURPOSE THIS PLAN SET IS FOR THE RESTORATION OF KILLIAN CREEK ALONG THE PEIDMONT NATURAL GAS UTILITY RIGHT-OF-WAY CORRIDOR. THIS PORTION OF KILLIAN CREEK HAS EXPERIENCED ACCELERATED EROSION FROM UPSTREAM DEVELOPMENT AND IMPERVIOUS SURFACE CONTRIBUTIONS TO THE WATERSHED. THE STREAM BANKS ALONG THIS REACH OF KILLIAN CREEK HAVE BECOME UNSTABLE AND ARE ERODING AND INCISING. PIEDMONT NATURAL GAS HAS NATURAL GAS UTILITY INFRASTRUCTURE WHICH BISECTS THE UNSTABLE STREAM REACH. THE PURPOSE OF THIS PROJECT IS TO RESTORE THE STREAM REACH, UTILIZING NATURAL STREAM DESIGN PRINCIPLES, TO A CONDITION WHERE ADJACENT UTILITY INFRASTRUCTURE IS NOT AT RISK. THE SCOPE OF PROJECT INCLUDES: 1) THE STREAM RESTORATION OF A 279 LINEAR FOOT REACH OF KILLIAN CREEK TO PROTECT NATURAL GAS UTILITY ASSETS AND TO REMEDY STREAMBANK INSTABILITY. 2) PHASE I, II, AND III EROSION CONTROL INSTALLATION, MAINTENANCE, AND REMOVAL, AS PRESCRIBED. 3) RIPARIAN BUFFER REVEGETATION PLAN IMPLEMENTATION 4) GENERAL MAINTENANCE OF AN EXISTING ACCESS ROAD BETWEEN FORNEY HILL ROAD AND THE STREAM RESTORATION PROJECT SITE. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH COVER SHEET DRAWING BY KAD DATE INITIALS REC & STD r611 Natural Gas TION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. LINCOLN COUNTY NORTH CA RO L I N A STA- DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HR CONTACT INFORMATION JASON A. BROWN PRIMARY PERM ITTEE PIEDMONT NATURAL GAS (704) 731-4681 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 1 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION G-000 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER GENERAL NOTES 1. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE STOCKPILED ON SITE IN AN AREA APPROVED BY PNG. 2. EXCESS MATERIAL IS DEFINED AS ANY MATERIAL BROUGHT TO THE SITE BY THE CONTRACTOR OR GENERATED DURING DEMOLITION, WHICH IS NOT USED FOR CONSTRUCTION OF THE PROJECT. ALL EXCESS MATERIAL PRODUCED BY THE CONTRACTOR'S OPERATIONS SHALL BE DISPOSED OF IN ACCORDANCE WITH LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS AT NO COST TO THE OWNER. 3. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, STATE, AND FEDERAL GUIDELINES/REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS SITE. 4. EXISTING CONDITIONS WERE TAKEN FROM; A TOPOGRAPHIC SURVEY PERFORMED BY REGIONAL LAND SURVEYORS (RLS); (336) 665-8155 AN ENVIRONMENTAL SURVEY PERFORMED BY POND & COMPANY; (678) 336-7740 5. LOCATIONS OF EXISTING UNDERGROUND UTILITIES AND SITE IMPROVEMENTS ARE APPROXIMATE. ACTUAL EXISTING CONDITIONS MAY VARY FROM WHAT IS REPRESENTED IN THESE DRAWINGS. CONTRACTOR SHALL IDENTIFY EXACT LOCATIONS IN THE FIELD PRIOR TO EXCAVATION BY CONTACTING NORTH CAROLINA 811 AND TAKE ALL PRECAUTIONS NECESSARY TO AVOID DAMAGE TO EXISTING UTILITIES AND SITE IMPROVEMENTS. SOME UTILITIES AND SITE IMPROVEMENTS MAY NOT BE SHOWN. CONTRACTOR SHALL NOTIFY OWNER OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION. 6. WORK AROUND THE EXISTING UTILITIES, DRAINAGE SYSTEMS, AND SITE IMPROVEMENTS SHALL BE PERFORMED IN A MANNER THAT WILL AVOID DAMAGE TO THE UTILITIES, STORM DRAINAGE, SITE IMPROVEMENTS, AND PAVEMENT. PRIOR TO COMMENCING WITH WORK, THE CONTRACTOR SHALL ACCURATELY LOCATE OR GET THE APPROPRIATE UTILITY COMPANY TO LOCATE ABOVE- AND BELOW- GROUND UTILITIES WHICH MAY BE AFFECTED BY THE WORK. THE CONTRACTOR SHALL PROTECT ALL UTILITIES, STORM DRAINAGE, SITE IMPROVEMENTS, AND PAVEMENTS NOT DESIGNATED FOR REMOVAL, RELOCATION, OR REPLACEMENT IN THE COURSE OF THE CONSTRUCTION. ANY EXISTING UTILITIES, STORM DRAINAGE, OR SITE IMPROVEMENTS DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED TO THE SATISFACTION OF THE UTILITY COMPANIES IMMEDIATELY AT NO EXPENSE TO THE OWNER OR ENGINEER. FURTHERMORE, IF THE PROPOSED CONSTRUCTION NECESSITATES THE DISCONNECTION OR RELOCATION OF ANY UTILITY OR STORM DRAINAGE SYSTEM, THEN THE REPLACEMENT UTILITY INFRASTRUCTURE SHALL BE IN PLACE AND FULLY FUNCTIONAL, PRIOR TO THE DISCONNECTION OF SAID UTILITY. PLEASE NOTE THAT LOCATING ALL UNDERGROUND FACILITIES IS THE CONTRACTOR'S RESPONSIBILITY. 7. SITE CONTRACTOR SHALL VERIFY ALL COORDINATES AND DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. BRING ANY DISCREPANCIES WITH DRAWINGS TO ATTENTION OF THE OWNER OR ENGINEER PRIOR TO STARTING CONSTRUCTION. 8. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), LATEST EDITION. 9. UNLESS SPECIFICALLY SHOWN OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL MAINTAIN A MINIMUM 5-0" OFFSET FROM PROPERTY LINES AND FROM EDGE OF PAVEMENT (EXCLUDING FOR ROAD AND PROPERTY LINE CROSSINGS), ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE CURRENT SPECIFICATIONS AND STANDARDS OF PIEDMONT NATURAL GAS. 10. ALL WORK SHALL BE IN COMPLIANCE WITH OSHA, TITLE 29 OF THE CODE OF FEDERAL REGULATIONS, AND ALL OTHER FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. 11. ALL DRAINAGE PIPES AND STRUCTURES SHALL BE CLEANED OF DEBRIS AND ERODED MATERIALS RESULTING FROM CONSTRUCTION. THESE PIPES AND STRUCTURES SHALL BE MAINTAINED CLEAN DURING THE PERIOD OF CONSTRUCTION. 12. ACCESS DRIVEWAY INFORMATION IS FOR INFORMATION ONLY. CONTRACTOR TO COORDINATE WITH PNG FOR ACCESS PERMISSIONS AND REQUIREMENTS. 13. CONTRACTOR TO VERIFY WETLANDS HAVE BEEN PERMITTED AND MITIGATED PRIOR TO ACCESSING ANY WETLAND AREAS. 14. CONTRACTOR TO COMPLY WITH ALL HEALTH AND SAFETY EXPECTATIONS OUTLINED IN THE PIEDMONT NATURAL GAS ENVIRONMENTAL, HEALTH AND SAFETY DOCUMENT (2019 OR MOST CURRENT). 15. CONTRACTOR TO PREPARE, AND SUPPLY ON -SITE, AN ENVIRONMENTAL HEALTH AND SAFETY PLAN. THE DOCUMENT SHALL BE PLACED IN THE CONSTRUCTION SITE JOB BOX. THE PLAN SHALL INCLUDE EMERGENCY PROTOCOLS FOR OBTAINING EMERGENCY SERVICES IN REMOTE PROJECT AREAS. 16. CONTRACTOR TO COMPLY WITH ALL EXPECTATIONS OUTLINED IN THE PIEDMONT NATURAL GAS PROJECT MANAGEMENT AND CONSTRUCTION - CONSTRUCTION ENGINEERING STANDARD, MATERIAL HANDLING STANDARD. 17. A CONSTRUCTION SITE JOB BOX SHALL BE PLACED AT THE CONSTRUCTION STAGING AREA ADJACENT TO THE STREAM RESTORATION WORKSPACE. THE JOB BOX SHALL CONTAIN ALL PROJECT RELATED PERMITS AND DOCUMENTATION, CONTRACTOR SAFETY PLAN, PIEDMONT NATURAL GAS ENVIRONMENTAL, HEALTH AND SAFETY DOCUMENT, STAMPED CONSTRUCTION DOCUMENTS, RED -LINE EROSION CONTROL PLANS, CONTRACTOR SUPPLIED SPILL PROTOCOL, EMERGENCY CONTACT INFORMATION, LOCATION OF NEAREST HOSPITAL AND EMERGENCY SERVICES, AND FIRST AID KIT. THE SITE RAIN GAUGE SHALL BE ATTACHED TO THE POST ON WHICH THE JOB BOX IS ALSO ATTACHED. 18. CONTRACTOR SHALL SUPPLY A FIRE EXTINGUISHER, SPILL RESPONSE KIT, FIRST AID KIT, AND ALL OTHER REQUIRED SAFETY EQUIPMENT PER THE PIEDMONT NATURAL GAS ENVIRONMENTAL, HEALTH AND SAFETY DOCUMENT. 19. CONTRACTOR SHALL CONTACT LOCAL FIRE DEPARTMENT PRIOR TO AND AT THE COMPLETION OF PROJECT WORK. 20. ALL FUEL STORAGE SHALL BE PLACED IN SECONDARY CONTAINMENT STRUCTURE. SITE NOTES 1. CONTRACTOR SHALL REPAIR ALL DAMAGE TO EXISTING FEATURES (PAVEMENT, CURBS, WALKS, DRIVEWAYS, YARDS, LANDSCAPING, ETC.) TO A LIKE NEW CONDITION AT NO ADDITIONAL COST TO THE OWNER, 2. ANY WORK UNACCEPTABLE TO THE OWNER'S REPRESENTATIVE, TO LOCAL REPRESENTATIVE, OR TO UTILITY REPRESENTATIVE SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. GRADING NOTES 1. PROPER TEMPORARY AND PERMANENT MEASURES SHALL BE USED TO CONTROL EROSION AND SEDIMENTATION IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL EROSION AND POLLUTION CONTROL DEVICES AND MEASURES SHALL BE CONSTRUCTED, INSTALLED, MAINTAINED, AND REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, ORDINANCES, AND POLICIES. 2. SEED AND STRAW ALL DISTURBED AREAS AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED, UNLESS OTHERWISE INDICATED. CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 3. PROVIDE TEMPORARY CONSTRUCTION ACCESS(ES) AT THE POINT(S) WHERE CONSTRUCTION VEHICLES EXIT THE CONSTRUCTION AREA. MAINTAIN PUBLIC ROADWAYS FREE OF TRACKED MUD AND DIRT. 4. THE CONTRACTOR SHALL CHECK ALL EXISTING GRADES AND DIMENSIONS IN THE FIELD PRIOR TO BEGINNING WORK AND REPORT ANY DISCREPANCIES TO THE ENGINEER. 5. THE CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE MANUAL OF ACCIDENT PREVENTION AND CONSTRUCTION ISSUED BY AGC OF AMERICA. INC. AND THE SAFETY AND HEALTH REGULATIONS OF CONSTRUCTION ISSUED BY THE U.S. DEPARTMENT OF Know what's b@IOW. C14Call before you dig. CD N �_� Dial811 'I-� Or Call 800-282-7411 LABOR. 6. NO VEGETATION OR TREES OUTSIDE OF THE PERMANENT EASEMENT AND TEMPORARY WORKSPACES SHALL BE DISTURBED OR REMOVED, 7. STRIP TOPSOIL FROM ALL CUT AND FILL AREAS AND STOCKPILE UPON COMPLETION OF GENERAL GRADING DISTRIBUTE TOP SOIL OVER ALL DISTURBED AREAS, TO A MINIMUM DEPTH OF 6", CONTRACTOR SHALL SUPPLY ADDITIONAL TOP SOIL IF INSUFFICIENT QUANTITIES EXIST ON SITE. 8. STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE CONTAINED SO SEDIMENT RUN-OFF WILL NOT CONTAMINATE SURROUNDING AREAS OR ENTER NEARBY STREAMS. 9. ANY SITE USED FOR DISPOSAL AND/OR STOCKPILE OF ANY MATERIAL SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SEE THAT ALL REQUIRED PERMITS ARE SECURED FOR EACH PROPERTY UTILIZED. A COPY OF THE APPROVED PERMIT MUST BE PROVIDED TO THE INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON ANY PROPERTY. FAILURE TO DO SO MAY RESULT IN THE CONTRACTOR REMOVING ANY ILLEGALLY PLACED MATERIAL AT HIS OWN EXPENSE. 10. ALL EXCAVATION IS UNCLASSIFIED WITHOUT REGARD TO MATERIALS ENCOUNTERED, CONTRACTOR SHALL VISIT SITE AND DRAW HIS OWN CONCLUSIONS TO CONDITIONS ENCOUNTERED. LINE AND GRADES SHOWN SHALL BE ACHIEVED WITHOUT ADDITIONAL COMPENSATION. 11. ANY AREA THAT IS DISTURBED OUTSIDE LIMITS OF CONSTRUCTION DURING THE LIFE OF THIS PROJECT SHALL BE REPAIRED BY CONTRACTOR AT HIS EXPENSE. 12. THE CONTRACTOR SHALL NOT DISPOSE OF ANY MATERIAL EITHER ON OR OFF PROJECT SITE IN A REGULATORY FLOOD WAY AS DEFINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY WITHOUT APPROVAL BY SAME. ALL MATERIAL SHALL BE DISPOSED OF IN UPLAND (NON -WETLAND) AREAS AND ABOVE ORDINARY HIGH WATER OF ANY ADJACENT WATERCOURSE. THIS DOES NOT ELIMINATE THE NEED TO OBTAIN ANY OTHER LICENSES OR PERMITS THAT MAY BE REQUIRED BY ANY OTHER FEDERAL, STATE, OR LOCAL AGENCY FOR THE CONSTRUCTION OF THIS PROJECT, GENERAL RESTRICTIONS 1. STAY IN ROW/EASEMENTS OR WITHIN PREDETERMINED WORKSPACE AREAS. 2. ONLY USE DESIGNATED POINTS OF ACCESS AS IDENTIFIED BY PNG INSPECTOR(S). 3. NO DIGGING, WORK, OR STORAGE WITHIN 25' OF POWER LINE OR EQUIPMENT INCLUDING GUY WIRES, EXCEPT AT APPROVED CROSSINGS OF POWER RIGHT OF WAY DESIGNATED ON PLANS. 4. ANY DOT CROSSING NOTIFICATIONS TO BE MADE AS DICTATED BY THE PERMIT OR STATE DOT PERMIT. 5. CONTRACTOR IS RESPONSIBLE FOR KNOWING LOCATION OF ALL ENVIRONMENTALLY SENSITIVE AREA RESTRICTIONS PERTAINING TO THIS PROJECT. DESIGN LEGEND PROPOSED TEMPORARY CONSTRUCTION EASEMENT TO BE UNDISTURBED - - - (PERMANENT EASEMENT) PROPOSED PERMANENT EASEMENT t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t 50' BUFFER STREAM/SURFACE WATERS 50' BUFFER WETLAND F-Loo-Loo-LOD-LODE LIMITS OF DISTURBANCE L-LM-LOD-LOD-LOD--1 PROPOSED FILL 420+00 I PROPOSED GAS LINE ----G----GEXISTING GAS LINE RAW RIGHT-OF-WAY PROPERTY LINE -x x- FENCE LINE WOODS/HEDGE LINE ------990------ SURVEY CONTOURS / SURFACE 900 STATE LIDAR CONTOURS EXISTING TOP OF BANK EXISTING TOE OF BANK EXISTING THALWEG PROPOSED BANKFULL PROPOSED TOE OF BANK 420+00 PROPOSED THALWEG PROPOSED POOL ........ . . .... PROPOSED TOE / BANKFULL TRANSITION PROPOSED POINT BAR PROPOSED RIFFLE STRUCTURE PROPOSED LOG STRUCTURE PROPOSED ANCHOR ROCK PROPOSED ROCK J-HOOK PROPOSED STACKED ROCK WALL ABBREVIATIONS APPROX. B.B. C/L CM1, CM2, CM3 CMP COMM CP DI DIA DIP E EA EL / ELEV EOP EX FLC FM FT H / HORIZ HDD IN / INV IS JAB L LF MAX MDPE MIN MH N N.T.S. O.U. OC O.V. PCC PIV P / P/L PS PSI PVC R RD R/W / ROW RCP SD SS SSD STA T.B. TWS T.C.E. TYP UGE UGT V/VERT W W.T. X-ING APPROXIMATE BOTTOM OF BANK CENTERLINE CONSTRUCTION METHOD 1, 2, 3, ... CORRUGATED METAL PIPE COMMUNICATIONS CATHODIC PROTECTION DROP INLET DIAMETER DUCTILE IRON PIPE EASTING EACH ELEVATION EDGE OF PAVEMENT EXISTING FOREIGN LINE CROSSING FORCE MAIN FEET HORIZONTAL HORIZONTAL DIRECTIONAL DRILL INVERT INTERMITTENT STREAM JACK AND AUGER BORE LENGTH LINEAR FEET MAXIMUM MEDIUM DENSITY POLYETHYLENE MINIMUM MANHOLE NORTHING NOT TO SCALE ON CENTER OPEN CUT OUTSIDE DIAMETER PORTLAND CEMENT CONCRETE POST INDICATOR VALVE PROPERTY LINE PERENNIAL STREAM POUNDS PER SQUARE INCH POLY VINYL CHLORIDE RADIUS ROAD RIGHT-OF-WAY REINFORCED CONCRETE PIPE STORM DRAIN SANITARY SEWER SOLID STATE DECOUPLER STATION TOP OF BANK TEMPORARY WORKSPACE TEMPORARY CONSTRUCTION EASEMENT TYPICAL UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE/COMMUNICATIONS VERTICAL WIDTH WALL THICKNESS CROSSING TYPICAL STREAM STRUCTURES PROPOSED BANKFULL (20' WIDTH) STREAM RESTORATION WOTUS IMPACT TABLE IMPACT TYPE PURPOSE LENGTH DESCRIPTION PERMANENT STREAMBANK 331 LINEAR FEET RESTORATION OF UNSTABLE STREAM STABILIZATION REACH PERMANENT FILL 126 LINEAR FEET STREAM BEND RADIUS REDUCTION AND BANK AVULSION CORRECTION 35 LINEAR FEET (25 LF UPSTREAM STREAM DIVERSION INLET / OUTLET TEMPORARY DEWATERING AND 10 LF DOWNSTREAM OF DAM AND PUMP AROUND STRUCTURE RESTORATION REACH) AND TEMPORARY STABILIZATION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALSMGR GENERAL NOTES REC DRAWING BY KAD EC &STD DATE INITIALS TECH Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 LEGEND ROCK CROSS VANE ROCK/ROCK J-HOOK TOEWOOD ROCK/LOG J-HOOK 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 2 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION C-001 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER \ SURVEY NOTES: 1. SURVEY INFORMATION PRESENTED IS A COMBINATION OF I / COUNTY DATA, THIRD PARTY SURVEY DATA PROVIDED FROM 1\6 NATURAL GAS PIPELINE INSTALLATION, AS -BUILT NATURAL GAS PIPELINE DATA, AND STREAM/WETLAND DELINEATION. I / / 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES WITHIN PROJECT AREA. AS -BUILT INFORMATION FOR NATURAL GAS INFRASTRUCTURE WILL BE PROVIDED FOR REFERENCE OF \ —738 -/ ,�ti`O / ANTICIPATED PIPELINE DEPTH. PIEDMONT NATURAL GAS 1 \ \ \ r � � J / ' / / INSPECTORS WILL BE ON -SITE DURING CONSTRUCTION TO \ \ / MONITOR WORK NEAR PIPELINE INFRASTRUCTURE. 3. PROPERTY DEPICTED IS WITHIN PARCEL OWNED BY DENROCK \ ` COMPANY WHICH INCLUDES A PIEDMONT NATURAL GAS \ 736 I / EASEMENT. o 4. ALL SURVEY, STAKING, AND UTILITY LOCATION IDENTIFICATION / 728 I I / I / Y + IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR. / LO / \ rn 718 C - 20-INCH NATURAL . M I 734 I ` 5. RELY -ON INFORMATION PROVIDED BY OWNER. \ N GAS PIPELINE I 6. LIMITS OF DISTURBANCE SHOWN ON THIS SHEET IS PROVIDED TO DEPICT THE LIMITS OF EXISTING SITE CLEARING. \ \ I 724 \ \ " ,�/ / I 7. REFERENCES TO TEMPORARY CONSTRUCTION EASEMENTS OR I \ \ \ I WORKSPACE DEPICTED TO PROVIDE EXISTING CONDITIONS INFORMATION RELATED TO THE NATURAL GAS PIPELINE INSTALLATION. REFERENCE PNG-C-451-0001017 AS -BUILT INFORMATION FOR DUKE MARSHALL - LINE 451 J ^N i I o \ � \ PIPELINE DEPTH COVER NATURAL GAS PROJECT PREVIOUS \ \ \ I LIMITS OF DISTURBANCE I \ I o \ \ N ( \ I a _ \ — \1 \ \ I — o \1 EXISTING LEFT \ \\ TOP OF BANK I \ \ \\ \ \ 1 EXISTING PROJECT WORKSPACE STREAM \ \ CROSSING NARROWED TO 70-FOOT \ \ EXISTING STREAM TOE \ � / � � � �\ \ FOR PERMIT COMPLIANCE \ \\ \ EXISTING THALWEG \ \ \ \ EXISTING THALWEG — _\ EXISTING LEFT — \ r I \ TOP OF BANK —� — \\ \ 720 STREAM DELINEATION ' , REFERENCE PNG-C-451-0001017 �' \ \ _ _ I �_ \ SURVEY DATA -� � � � AS BUILT INFORMATION FOR �I � 4.9 EXISTING STREAM TOE \ PIPELINE DEPTH / COVER EXISTING RIGHT \ \ TOP OF BANK—eocn n \ \ \ PIEDMONT NATURAL GAS PERMANENT \ M '\ UTILITY RIGHT-OF-WAY \ I T / \ o EXI TINGI \ \ \\ \ \ \ TOP OF BANK 20-INCH NATURAL ) I GAS PIPELINE \ TEMPORARY CONSTRUCTION l \ \ EASEMENT / X-11 \ op / \ \ \ \ \ \ r \ 0 40 80 Feet ENGINEER'S 24-HOUR EROSION AND \ \ \ \ \ \ \ \ \ \ \ REPRESENTATIVE: SEDIMENTATION JEREMY DEAN CONTROL CONTACT: • Know what's below. CPESC NO.: 00004207 MR. JASON A. BROWN CDOJ Call before you dig. EXPIRES: 01/18/2021 PHONE: (704) 731-4681 Dial 811 NOT FOR CONSTRUCTION N Or Call 800-282-7411 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO O\ 0 RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 cf)O�� NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 3 OF 18 SCALE AS SHOWN �,&���� 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS DUKE MARSHALL STREAM RESTORATION DATE INITIALS REGIONAL Piedmont DWG DATE 04/29/2020 SUPERSEDED �yOyO 2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - ENGINEEREXISTING CONDITIONS SURVEY PROJECT NUMBER 1190706 DATE INITIALS MGR TECH DRAWING NUMBER REVISION DATE INITIALS REC & STD Natural Gas c"D DRAWING BY KAD LI NCOLN COUNTY NORTH CAROLI NA v-001 2 STATION ID _ DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. r DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 X CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 DISCIPLINE / RESOURCE CENTER / LINE NUMBER LAT:N35°31'03.8 0 IN NNNNNN LONG:W81 °02'40.6 5" Pt Pt ti pt / ` CONSTRUCTION ENTRANCE LOCATED \ P % a ALONG FORNEY HILL ROAD pt �,NIF- 1 "�� - \EXISTING ACCESS ROAD IN J EXISTING ACCESS ROAD Vo > ?� % ti Q�d ld O ` _Y O ■ J = o- I ' ti • Q p _ - a / � ' � c, 20-INCH NATURAL GAS PIPELINE I I \ II 7 ■ IN % LININ SPIN IN IN IN INJ Id A �� v/ old—/ �L ' .111 IN Aldz- IN IN IN IN IN IN �kC IN IN / J � _IN Nine a I IN 1 _ / IN IN 0 INN IN .-i _NN-r IN EXISTING ACCESS ROAD IN ■ 1 1 IN IN IN 4 111` r IN IN IN INN IN' ♦ 7 0. 1 r.ti LIN 17A t 1 � _ - _ . ti N. *; �:rj�IN �,.• o EXISTING ACCESS ROAD IN WIN IN IN .1 IN-' 13 IN "ANNIN INNAe;j •_' 1t I - ■ o - i 1 IN — 1 1 =. IPI II ` I� IN • 1 L� - •�' _fir#' 611 IN IN p F;\ WLL- IN IN - IN .- WIN. NNINNA IN IN IN IN IN INN I.NNNIN IN IN irt%. 90 1 IN IN � 4& _t �� I . ti � _ � � -4 } , ti IN IN ti IN IN i \ \ �� ■� "- d \ < is. IN eAe Ile* T-'A%6;1i o REFERENCE PNG-C-451-0001017 AS -BUILT INFORMATION FOR PIPELINE DEPTH / COVER 3 0 rti _ I O J di, I% I '.9L , y;` �1 -_� . 1 - - �'�' . �IN.1� IN IN . 'FEW I& 16 r r �-. JOB BOX (PERMITS, PLANS, SAFETY PLANS, ET(..), FUEL -� �ti��'.� STORAGE, SPILL KIT, RAIN GAUGE, INSPECTION IN ' �•- i • IN 7' REPORTS, AND FIRST AID KIT TO BE LOCATED IN STAGING AREA . INN - 016 - `T� 1 ' ■� ; F �.■.T \ CONSTRUCTION STAGING AREA - IN IN• 1 - A �, -a - - PIEDMONT NATURAL GAS PERMANENT UTILITY RIGHT-OF-WAY EXISTING ACCESS ROAD IN1 r IN IN IN IN IL %7 IN IN I 'NN' t O� pw '�■ \LOD 3 _ - - - ~ \ F IN IIIINSTREAM RESTORATION i 3x "� IN III A�_ o "" °° 1s° SOD WORKSPACE / L \ / _ 11 °° ININN�•iA 050 �t Zt 0 I P I �- �) S4x9 IN NNNNN NNjNINN IN IN rl 4;. IN J i —•�c _ �190 0 400 800 ''_ OF Q- / N�- IN :,�"t3� SURVEY NOTES: 1. SURVEY INFORMATION PRESENTED IS A COMBINATION OF COUNTY DATA, THIRD PARTY SURVEY DATA PROVIDED FROM NATURAL GAS PIPELINE INSTALLATION, AS -BUILT NATURAL GAS PIPELINE DATA, AND STREAM/WETLAND DELINEATION. 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES WITHIN PROJECT AREA. AS -BUILT INFORMATION FOR NATURAL GAS INFRASTRUCTURE WILL BE PROVIDED FOR REFERENCE OF ANTICIPATED PIPELINE DEPTH. PIEDMONT NATURAL GAS INSPECTORS WILL BE ON -SITE DURING CONSTRUCTION TO MONITOR WORK NEAR PIPELINE INFRASTRUCTURE. 3. PROPERTY DEPICTED IS WITHIN PARCELS OWNED BY DENROCK COMPANY, WHICH INCLUDES A PIEDMONT NATURAL GAS EASEMENT. 4. ALL SURVEY, STAKING, AND UTILITY LOCATION IDENTIFICATION IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR. 5. RELY -ON INFORMATION PROVIDED BY OWNER. 6. ALL PARCELS AND LOD SHOWN ARE OWNED BY DENROCK CO. PIEDMONT NATURAL GAS HAS PURCHASED TEMPORARY & PERMANENT EASEMENTS FOR ALL WORKSPACE. GENERAL SITE NOTES: 1. THE WORKSPACE WITHIN THE LOD OF THIS PROJECT CONSISTS OF AN EXISTING ACCESS PATH, CONSTRUCTION STAGING AREA, AND THE LIMITS SURROUNDING THE LOCATION OF STREAM RESTORATION ACTIVITIES. 2. CONTRACTOR SHALL MAINTAIN THE EXISTING ACCESS PATH DURING AND PENDING CONSTRUCTION COMPLETION. ACCESS PATH ALONG ITS ENTIRE LENGTH BETWEEN FORNEY HILL ROAD AND THE STREAM RESTORATION WORKSPACE SHALL BE MAINTAINED IN -KIND WITH EXISTING ROAD CONDITIONS AND PER THE CONSTRUCTION ROAD STABILIZATION (CRS) EROSION AND SEDIMENT CONTROL DETAIL. THE ACCESS PATH SHALL BE RESTORED TO PRE -CONSTRUCTION CONDITIONS OR PER AGREED UPON LANDOWNER REQUIREMENTS. 3. THE LENGTH OF THE ACCESS PATH SHALL REQUIRE LIMITED TO NO CLEARING. 4. THE LOD WITHIN THE EXISTING PIEDMONT NATURAL GAS RIGHT-OF-WAY HAS PREVIOUSLY BEEN CLEARED AND MAINTAINED. 5. CLEARING WITHIN THE LOD OF THE STREAM RESTORATION WORKSPACE SHALL BE LIMITED TO THE GREATEST EXTENT PRACTICABLE. A MAJORITY OF THE WORKSPACE IS PROVIDED FOR THE CONTRACTOR TO ACCESS AND SELECTIVELY CLEAR VEGETATION TO BE USED FOR THE STREAM RESTORATION ACTIVITIES. THE WORKSPACE HAS BEEN ENLARGED TO PREVENT THE NECESSITY OF EXTENSIVE CLEARING FOR INSTREAM STRUCTURE MATERIAL. 6. CLEARING SHALL BE AT THE DIRECTION OF THE STREAM RESTORATION DESIGNER, ENGINEER, OR THEIR REPRESENTATIVE. 7. THE CONSTRUCTION ENTRANCE SHALL BE PLACED ADJACENT TO FORNEY HILL ROAD AT THE EXISTING ROAD ACCESS POINT. 8. THE CONSTRUCTION STAGING AREA IS TO BE PLACED (AS SHOWN) AT THE TOP OF THE SLOPE ALONG THE EXISTING RIGHT-OF-WAY, AND BE USED FOR CONSTRUCTION MATERIALS STAGING, STORAGE, CONSTRUCTION JOB -BOX, FUEL STORAGE, EMERGENCY EQUIPMENT/SUPPLIES, ETC. ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALSMGR PROJECT SITE OVERVIEW REC DRAWING BY KAD EC &STD DATE INITIALS TECH Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 ® Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 4 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION C-002 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER EXISTING NATURAL GAS / 1 \ I \ \ \ \ �, PIPELINE -SEE AS BUILT 732 co° 3LI, — � �� � \ \ \ DRAWING FOR ELEVATIONtoD COMP NY OCK ID 02293 �� \ \ C l / J 66 PG 05 O /�� p 2 c EY HILLER � � ,/'i \\\� ; d-. � � S\ � �\ \ �/ °D \g MATCH AND TIE RELIC STREAM . \ \\C\ \ \ i °D\ J LIMITS OF DISTURBANCE \ 1/ BANKS INTO ADJACENT SLOPE \ —o / \\ TO ESTABLISH FLOODPLAIN / I \ 1 l G% //// / RIFFLE TRANSITION \ \ \ \ ,� \ \ t \to g \ WETLAND BENCH. I I S INTO BANK \\ \ \ \� \ \ I \ \\ \\ —72,V EXPANDED WORKSPACE \ I \\\ \ \ ► W W \ \�` W ^ti 1 44 \ TO ACCOMMODATE t •` o LIMITED CLEARING \ ��� ��� I I �•��•'`~�•\ " W o° \ I!� -t� •t�!{: �s \ \ \ DENRIpCO229 COMPANY o ARMORED RIFFLE W \ " DB 800-PG 110 72 \ \ \ \ \ v 1 \ �� 1+50 \ \ \� \• \ W W\ EY H FORN DB 366-PG 053 \ \ / l \� W\W i \\ — I - W ILL RD \ o 72 \ \ _BANKFULL i W I �r BANK TOE 7 a \\ \ �� 20.-�X ,t;': _ _ _ - \ \\ '; EXPANDED WORKSPACE o .; , .i -- - _ \ \ \ POOL 73J_'-- ARMORED RIFFLE 24 TO ACCOMMODATE \ \� POINT BAR -\ �_W— � POOL \ W�� = _ \ \\ �k o \ \ LIMITED CLEARING 73 \ \ STREAM o \ \ �\ \ \ ALIGNMENT \ _ — — �� /' j W . W W �� �\ o -\ \ � W W W W ROCK J-HOOK �� �\�. W \ � -' W`WWW\ \W�` POINT BAR 722 o° \ \ W �. W '. '. W J / \ EXISTING STREAM \\\\ ,^ �, �- �'' W W "� W W W W W W W W W W W W` \' ALIGNMENT 2 �720- o /\ W ANCHOR ROCK TOE TOE WOOD TYP. 0 40 80 Feet \� \ STREAM RESTORATION PLAN ANCHOR ROCK \ g 725 720 O z 710 705 700 0+00 EXISTING RIGHT BANK EXISTING LEFT BANK PROPOSED BANKFULL BENCH(17.5' WIDTH) TIE TO EXISTING EXISTING GRADE RIFFLE PROPOSED THALWE RIFFLE TIE TO EXISTING RUN RUN POOL 20" GASLINE TOP OF PIPE = 705.17 POOL POOL i II l 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 STREAM RESTORATION PROFILE PROPOSED THALWEG HORIZ. SCALE 1" = 20' VERT. SCALE 1" = 4' 2+25 2+50 725 720 715 z O Q w J 710 w 705 700 2+2- 679 GENERAL NOTES: 1. ELEVATIONS OF ALL STRUCTURES SHALL BE CONFIRMED. 2. ALL STRUCTURES SHALL BE CONSTRUCTED PER SPECIFICATIONS IDENTIFIED ON SHEET CS103, STREAM RESTORATION STRUCTURE DETAILS. 3. THE ENGINEER, OR THEIR REPRESENTATIVE, SHALL CONFIRM PROPER INSTALLATION OF INSTREAM STRUCTURES. 4. CLEARING SHALL BE LIMITED TO SELECTIVE CLEARING FOR INSTREAM STRUCTURE USE AND SHALL COMPLY WITH THE GENERAL NOTES PROVIDED ON SHEET C-001. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH STREAM RESTORATION PLAN &PROFILE DRAWING BY KAD DATE INITIALS REC & STD Natural Gas I I STATION ID PRINCIPAL DATE INITIALS COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 5 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CS101 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER BACKFILL WITH #4 AND #57 STONE, THEN LINE WITH NON -WOVEN GEOTEXTILE FABRIC CHINK GAPS WITH # 4 AND #57 STONE, LINE WITH WOVEN GEOTEXTILE BACKFILL WITH #4 AND #57 STONE ROCK J - HOOK PROFILE VIEW (TYPICAL) NOT TO SCALE BACKFILL WITH #4 AND #57 STONE, THEN LINE WITH NON -WOVEN GEOTEXTILE FABRIC CHINK GAPS WITH # 4 AND #57 STONE, LINE WITH WOVEN GEOTEXTILE BACKFILL WITH #4 AND #57 STONE ROCK CROSS VANE PROFILE VIEW (TYPICAL) NOT TO SCALE ROCKJ-HOOK PLAN VIEW (TYPICAL) NOT TO SCALE ROCK CROSS VANE PLAN VIEW (TYPICAL) NOT TO SCALE INSTALL LAYER OF NATIVE DEBRI (RECOMMEND WILLOW BRANCHE PRIOR TO PLACING VANE ARM LC LINE WITH NON -WOVEN FILTER FABRIC. BACKFILL WITH #4 AND # 57 STONE ANC NATURAL SUBSTRATE. LEFT CHANNEL BANK BANKFULL o� �DID� SCOUR STREAM HOLE - CHANNEL THALWEG TOE WOOD CROSS SECTION VIEW (TYPICAL) NOT TO SCALE ROOTWAD FOOTER/SILL -- 3-X ,AP STONE ACK NON -WOVEN ILTER FABRIC EVERY 1' ✓ITH 1.5" ROOFING NAILS. ACKFILL WITH NATURAL UBSTRATE. ;ING ROCK/LOG J-HOOK PLAN VIEW (TYPICAL) NOT TO SCALE COVER FINAL LAYER OF BRUSH WITH 1 FOOT OF DIRT / SOD MAT ALTERNATE ANGLE BRUSH RIGHT PER LAYER.OPPOSING CHANNEL BANK 30` — 45° ANGLES ROOTWAD DIGGER LOG FOOTER (OPTIONAL) (TYPICAL) BKF SILL ROCK "-4 10° /4 Bkf BURY USING RIFFLE SUBSTRATE 1/3 Bkf 1/3 Bkf—L1/3 Bkf NATURAL FOOTING TOE WOOD (ROOTWADS/LOGS) PLAN VIEW (TYPICAL) NOT TO SCALE 12"(30cm) 2"-5" (I Scm) I III= _ -IIIIIII IIIEI III III A. 0 0 6" (15cm) ". ••' 12„ II=III=1 111=11—11=111=11 (30cm) I=III III=III—III I L=1 I I Ed I1= ' LEVEL IIII aB IIIII IIII � �' J Ed I Ed I I III —III —II IEI I IEI I IEI I I IEI I IEI I I I 1=1 I I=1 11=I 11=. I I I=I I I=I I I —III- I-1I=I I IEI IIEI LEA — I IEI IEI I IEI I I. 0 = I I-III-1 I - ROLLED EROSION CONTROL PRODUCT INSTALLATION NOTES: STREAM BUFFER RESTORATION NOTES: 1. FOR EASIER INSTALLATION, LOWER WATER LEVEL FROM LEVEL A TO LEVEL B BEFORE INSTALLATION 1. BUFFER REPLANTING: RESTORATION OF TEMPORARY RIPARIAN BUFFER IMPACTS WILL BE CONDUCTED, WHERE 2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), SEE STREAM BUFFER INDICATED, BY RE-ESTABLISHING NATIVE SPECIES GRASSES, SHRUBS AND TREE LIVE STAKES. RESTORATION NOTES. 2. ESTABLISH THE VEGETATION ACCORDING TO THE GROWERS ESTABLISHED TYPICAL SEED RATES. AS 3. BEGIN AT THE TOP OF THE SHORELINE BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE REQUIRED, CALIBRATE SEEDING EQUIPMENT TO ENSURE REQUIRED APPLICATION RATES. SEEDING METHOD TRENCH WITH APPROXIMATELY 12"(30CM) OF RECPS EXTENDED BEYOND THE UP -SLOPE PORTION OF THE SHALL BE IN ACCORDANCE WITH GROWER'S RECOMMENDATIONS. TRENCH. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN THE 3. SEED SHALL BE PLANTED IN PREPARED WEED -FREE SEEDBED. REMOVE ALL INVASIVE SPECIES, LOOSEN SOIL BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE AND THATCH. WEED CONTROL EFFORTS SHOULD BEGIN PRIOR TO PLANTING AND MAY REQUIRE MULTIPLE COMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND APPLICATIONS. USE AQUATIC HERBICIDES OR TILLAGE TO ELIMINATE COMPETING VEGETATION. CONTACT THE COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED LOCAL EXTENSION OFFICE FOR SPECIFIC HERBICIDES TO USE AND APPLY ALL HERBICIDES ACCORDING TO LABEL. APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE RECPS. 4. ROLL RECPS EITHER (A) DOWN THE SHORELINE FOR LONG BANKS (TOP TO BOTTOM) OR (B) HORIZONTALLY 4. LIME AND FERTILIZERS SHOULD NOT BE APPLIED TO NATIVE GRASSES AT ESTABLISHMENT UNLESS ACROSS THE SHORELINE SLOPE. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. INSUFFICIENT SOIL FERTILITY IS INDICATED BY SOIL TESTING. WHERE TOPSOIL HAS BEEN REMOVED OR ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES INAPPROPRIATE DEPLETED, ORGANIC MATTER SHALL BE ADDED. LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. 5. BE CAREFUL NOT TO BLEND SEED OF VARYING SIZE, SHAPE AND WEIGHT. 5. THE EDGES OF ALL HORIZONTAL AND VERTICAL SEAMS MUST BE STAPLED WITH APPROXIMATELY 2"- 5" 6. SEED SHALL BE PLANTED AT A PLANTING DEPTH OF NO MORE THAN A", UNLESS OTHERWISE DIRECTED. (5-12.5CM) OVERLAP. SEAMS SHALL OVERLAP AND SHINGLED IN THE PREDOMINANT FLOW DIRECTION. 6. THE EDGES OF THE RECPS AT OR BELOW NORMAL WATER LEVEL MUST BE ANCHORED BY PLACING THE 7. FIRM SOIL TO ACHIEVE GOOD SEED TO SOIL CONTACT. RECP'S IN A 12"(30CM) DEEP X 6'(15CM) WIDE ANCHOR TRENCH. ANCHOR THE RECPS WITH A ROW OF 8. HAND CRIMP MULCH OVER SEED BEFORE INSTALLING RECP. STAPLES/STAKES SPACED APPROXIMATELY I2"(30CM) APART IN THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. STREAMBANK ROLLED EROSION CONTROL PRODUCT (COIR MATTING) INSTALLATION DETAIL STREAM STABILIZATION LIVE STAKING CROSS-SECTION NOTES: ROOTED/LEAFED CONDITION OF THE LIVING PLANT MATERIAL IS NOT REPRESENTATIVE AT THE TIME OF INSTALLATION. I I —I � III III—� I —I I I— — I —I I I. III —III —III— 1=III= III —III —III II —II _—III=1 I I — III —III —I —III - I FORMING FLOW I - I II IIII I -I I -III - BASE FLOW 8� o - 2' TO 3' STREAMBED= v��� -III- (TRIANGULAR SPACING) _ oa _=1 11=III III -�II,;IIII iI11j1111- Know what's below. N CD Call before you dig. N Dial 811 3 Or Call 800-282-7411 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE INITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH STREAM RESTORATION STRUCTURE DETAILS DRAWING BY KAD DATE INITIALS REC & STD Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 7 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CS 103 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER O' I / / \ I \ \ \ 1 I ° \ � I � \ I 73 / _ \ \ \ I \ / \ LOD LOD� LOD LOD LOD LOD LOD —ZLOD LOD LOD—LOD—LOD L D LODM1 -LOD OD 732 T�OD LOD L� LOD LOD LOD LOD LOD LOD LO LOD—LOD—LOD LOD 0 (/ O J / o \ \ \ ERNMX-307 RIPARIAN \ REVEGETATION \ \ \ 00 �'N OMP PN o / 22 \ li I I ROG\4, 1 / EN O� G� \ l / / / 0 \ aO13,P G -P 0 ro6 LR I \ ERNMX-308 WETLAND REVEGETATION I \ \ APPROXIMATE TREE \ I LOCATIONcgo —72 o / y 03 \ / ' YL' yr s♦r '' `\\ II � �O ' / +y+ ' +i yr r'�+, y++ry'+ / /— —\ � J \ APPROXIMATE TREE \++ y \ LOCATION %S\ \ t + �. y + / ERNMX-307 RIPARIAN AND LIVE 715 2*sp _ WILLOW STAKES REVEGETATION \ 10 00 \\ \ ERNMX-307 RIPARIAN AND LIVE 10y \ \ WILLOW STAKES REVEGETATION, `ERNMX-307 RIPARIANcr I REVEGETATION APPROXIMATE TREE \ \ 72o LOCATION I o / \ \ \ / / \)30 1 \ \ \ \ \ 7 22— LO _—��p—LOD —LOD��LOD LOD , 724 � J APPROXIMATE TREE \ \ \ \ \ �36\ \ , —LOD —Loy--��—LOD—LOD \ \ \ \ / LOCATION �- \ \ \ LOD—LOD \ \ \ 726- \ J C \ _—L�LOD \ \ \ \ \7 \ Q—LOD 'LODE OD�rLOD— �DOD\ \ \ )40 28 \ LO�� LOD \ \ \ \ / LOD—LODE \ o \ \ co —730 _ 2 73 \ � jib _ 0 40 80 STREAM RESTORATION REVEGETATION PLAN Feet REVEGETATION PLAN NOTES: 1. FOR THE PURPOSES OF THIS REVEGETATION PLAN, THE RIPARIAN STREAM BUFFER IS DEFINED AS THE AREA ADJACENT TO THE STREAM MEASURED FROM THE BANKFULL ELEVATION TO 25-FEET UP GRADIENT OF THE BANKFULL ELEVATION. 2. TREES NOR SHRUBS ARE TO BE PLANTED WITHIN THE EXISTING UTILITY RIGHT-OF-WAY. PERMANENT SEEDING AND LIVE STAKE INSTALLATION, AS SPECIFIED, IS THE EXTENT OF REVEGETATION ACTIVITIES WITHIN THE RIGHT-OF-WAY. 3. PORTIONS OF THIS REVEGETATION PLAN ARE ALSO DEPICTED IN THE EROSION CONTROL PLAN. ITEMS DEPICTED ON BOTH PLANS SHOULD BE UNDERSTOOD TO BE THE SAME ITEM, AND SHOULD NOT BE CONSIDERED TWICE IN PRICE ESTIMATION / BIDDING. 4. PORTIONS OF THE LOD NOT DISCUSSED IN THIS REVEGETATION PLAN SHALL BE REVEGETATED PER THE EROSION CONTROL PLAN. TREE / SHRUB PLANTING NOTES: 1. THREE -GALLON CONTAINER TREES SHOULD BE PLANTED AS SHOWN ON THE REVEGETATION PLAN. 2. SPACE AND OFFSET TREES TO ALLOW FOR NATURAL APPEARANCE AND DISTRIBUTION. 3. DO NOT PLANT TREES OR SHRUBS WITHIN THE EXISTING NATURAL GAS UTILITY RIGHT OF WAY. 4. LIVE WILLOW STAKES (Salix nigra) ARE TO BE INSTALLED BETWEEN BANKFULL AND THE TOE OF SLOPE AT NORMAL WATER SURFACE ELEVATION (2-FOOT ON CENTER IN TRIANGLE PLANTING PATTERN). [APPROX. 2,500 LIVE STAKES OVER 8,823 SQUARE FEET] 5. THE FOLLOWING TREE SPECIES SHALL BE UTILIZED FOR REVEGETATION OF THE RIPARIAN STREAM BUFFER AS DEPICTED: 5.1. RIVER BIRCH (Betula nigra) [5] 5.2. RED MAPLE (Acer rubrum) [5] 5.3. BLACK WALNUT (Juglans nigra) [10] 5.4. AMERICAN ELM (Ulmus americans) [5] 5.5. SILKY DOGWOOD (Cornus amomum) [5] 6. SHRUB SPECIES SHALL BE PLANTED WITHIN THE RIPARIAN STREAM BUFFER ALONG THE ENTIRE STREAM RESTORATION REACH, ASIDE FROM PORTIONS OF THE RIPARIAN BUFFER WITHIN THE EXISTING UTILITY RIGHT-OF-WAY. 7. AN EQUAL DISTRIBUTION OF SHRUBS OF THE FOLLOWING SPECIES SHALL BE UTILIZED FOR REVEGETATION OF THE RIPARIAN STREAM BUFFER. 7.1. BUTTONBUSH (Cephalanthus occidentails) [10] 7.2. SPICEBUSH (Lindera benzoin) [10] 7.3. ELDERBERRY (Sambucus Nigra ssp. canadensis) [101 7.4. SOUTHERN ARROWWOOD (Viburnum dentatum) [10] 7.5. POSSUMHAW (Viburnum nudum) [10] 7.6. WILD AZALEA (Rhododendron periclymenoides) [10] PERMANENT SEEDING NOTES: 1. THE ENTIRE STREAM RESTORATION REACH, FROM TOE OF SLOPE AT NORMAL STREAM FLOW ELEVATION TO THE EDGE OF THE 25-FOOT RIPARIAN BUFFER, MEASURED FROM BANKFULL ELEVATION, SHALL BE RESEEDED WITH ERNMX-307 (NC PIEDMONT RIPARIAN SEED MIX). THE FLOODPLAIN / WETLAND BENCH SHALL BE RESEEDED WITH ERNMX-308 (NC PIEDMONT WETLAND SEED MIX) AS SHOWN. 2. BROADCAST SEEDING SHALL OCCUR AT A RATE OF 20 LBS / ACRE. 3. SOIL NUTRIENT CONTENT SHOULD BE EVALUATED TO ENSURE GERMINATION. SOIL AMENDMENTS MAY BE APPLIED PER SOIL TESTING RESULTS OR PER THE PERMANENT AND TEMPORARY SEEDING SPECIFICATIONS PROVIDED IN THE EROSION CONTROL DETAILS. 4. DURING POST CONSTRUCTION MAINTENANCE, SEED SHALL BE REAPPLIED AS NECESSARY TO OBTAIN COVERAGE OF RIPARIAN SPECIES UTILIZING ERNMX-307 AND ERNMX-308 SEED MIXES IN LOCATIONS SPECIFIED ON THE PLAN. POST CONSTRUCTION REVEGETATION MONITORING NOTES: 1. MONITORING OF VEGETATION AND SEED GERMINATION SHALL OCCUR PER NCDEQ EROSION CONTROL INSPECTION REQUIREMENTS ASSOCIATED WITH THE NCGO1 GENERAL CONSTRUCTION STORMWATER PERMIT. APPROPRIATE SEED, PER THE REVEGETATION AND EROSION CONTROL PLAN, SHALL BE APPLIED AS REQUIRED TO OBTAIN REQUIRED COVERAGE AND DENSITY FOR PERMIT NOTICE OF TERMINATION (NOT). 2. ONE YEAR AFTER PROJECT COMPLETION, A VEGETATION SURVEY SHALL OCCUR TO EVALUATE TREE AND SHRUB SURVIVAL. IF THE ONE-YEAR SURVEY DOES NOT SHOW 80% SURVIVAL OF TREES AND SHRUBS PLANTED, SUPPLEMENTAL SPECIES SHALL BE PLANED TO REPLACE THOSE WHICH DID NOT SURVIVE. 3. ALL INSPECTION AND SURVEY REPORTS, ALONG WITH PHOTO DOCUMENTATION, SHALL BE MADE AVAILABLE TO POND UPON REQUEST. REVEGETATION LEGEND: LIVE WILLOW STAKES (Salix Nigra) THREE -GALLON ++++++++++++++++++ PLANTING ZONE NURSERY TREES [30] ++++++++++++++++++ (TRIANGULAR PATTERN) [8,823 SQUARE FEET, -2,500 LIVE STAKES] ERNMX - 307 NC PIEDMONT RIPARIAN SEED [0.50 ACRES] ERNMX - 308 NC PIEDMONT WETLAND SEED [0.10 ACRES] 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH STREAM RESTORATION REVEGETATION PLAN DRAWING BY KAD DATE INITIALS REC & STD Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 8 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CS 104 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER Q 0 0 N EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN GENERAL NOTES (IN CONFORMANCE WITH NC GENERAL CONSTRUCTION STORMWATER PERMIT NO. NCG01) OWNER/ PIEDMONT NATURAL GAS COMPANY, INC. PRIMARY ADDRESS: 4720 PIEDMONT ROW DRIVE PERMITEE: CHARLOTTE, NC 30666 PHONE: (704) 364-3120 CONTACT: JASON BROWN EMAIL: JASON.BROWN6@DUKE-ENERGY.COM ENGINEER: ANDREW SWIFT - POND & COMPANY 3500 PARKWAY LANE, SUITE 500 PEACHTREE CORNERS, GEORGIA 30092 PHONE: (678) 336-7740 FAX: (678) 336-7744 ENGINNER'S REPRESENTATIVE: JEREMY DEAN CPESC # 00004207 EXPIRES: 01/18/2021 CONTRACTOR: WOFFORD EARTHWORKS LLC. k4-HOUR EROSION AND SEDIMENT CONTROL CONTACT: JASON A. BROWN TOTAL PROJECT AREA: 6.30 DISTURBED AREA: 6.30 DESCRIPTIONS OF THE EXISTING SITE AND THE PROPOSED PROJECT: THE PROJECT AREA CURRENTLY CONSISTS OF MAINTAINED NATURAL GAS UTILITY RIGHT-OF-WAY. ADJACENT TO THE UTILITY RIGHT-OF-WAY CORRIDOR ARE PRIVATELY OWNED PARCELS. THE PROPOSED PROJECT WOULD NOT CHANGE LAND USE OR PROPERTY OWNERSHIP. THE PROJECT CONSISTS OF A STREAM RESTORATION IN WHICH ANY LAND UTILIZED OUTSIDE OF THE PIEDMONT NATURAL GAS RIGHT-OF-WAY WOULD BE ACQUIRED FOR TEMPORARY ACCESS TO COMPLETE THE PROJECT. THE PROJECT WORKSPACE (LOD) INCLUDES THE STREAM RESTORATION ACTIVITIES, STAGING AREA, AND EXISTING ACCESS ROAD. EXISTING LAND USE: UTILITY LINE EASEMENT, ADJACENT UNDEVELOPED PRIVATELY OWNED PROPERTY PROPOSED LAND USE: UNCHANGED - UTILITY EASEMENT, ADJACENT UNDEVELOPED PRIVATELY OWNED PROPERTY GPS COORDINATES OF SITE: 35.508639,-81.038862 NAME OF RIVER BASIN: CATAWBA RIVER WATERSHED CATAWBA RIVER WATERSHED IS SUBJECT TO BUFFER RULES ALONG MAINSTEM CATAWBA RIVER AND ASSOCIATED LAKES. THERE IS NO STATE REGULATED BUFFER WITHIN PROJECT AREA. AREA OF ON -SITE WETLANDS: 0.00 AC NAME OF RECEIVING WATERS: KILLIAN CREEK, CLASSIFICATION: C, STREAM INDEX: 11-119-2-(0.5) PRE -CONSTRUCTION CURVE NUMBER = 55 POST -CONSTRUCTION CURVE NUMBER = 55 CONSTRUCTION SEQUENCE AND PHASING: AS A STREAM RESTORATION PROJECT IS INHERENTLY A EROSION CONTROL RELATED PROJECT, THE PROJECT CONSTRUCTION SEQUENCE AND PHASING FOLLOWS THE EROSION CONTROL INSTALLATION SEQUENCE. THE PROJECT CONSTRUCTION SEQUENCE IS AS FOLLOWS: PHASE I: PHASE I INVOLVES THE INSTALLATION OF ALL PERIMETER BEST MANAGEMENT PRACTICES (BMPS) SUCH AS SILT FENCE, COMPOST FILTER SOCK, SILT FENCE OUTLETS, CONSTRUCTION ENTRANCES, ETC. IT ALSO INCLUDES THE NECESSARY STAGING FOR PUMP AROUND DEVICE, TURBIDITY CURTAIN, AND TEMPORARY STREAM CROSSING. PHASE II: ONCE ALL PHASE I PERIMETER MEASURES ARE INSTALLED, MINOR CLEARING AND GRADING MAY COMMENCE. AS THE PROJECT AREA CONSISTS OF A MAINTAINED UTILITY CORRIDOR, ONLY MINOR CLEARING AND GRADING WILL BE NECESSARY, AND WILL OCCUR AT THE DIRECTION OF THE ENGINEER, OR THEIR REPRESENTATIVE. PHASE II BMPS WILL INCLUDE TEMPORARY STABILIZATION MEASURES SUCH AS MULCHING, TEMPORARY SEEDING, DUST CONTROL, ETC. DUE TO THE SIZE OF THE STREAM INVOLVED WITH THE STREAM RESTORATION, A DIVERSION CHANNEL IS NOT FEASIBLE. A PUMP AROUND DEVICE WILL BE UTILIZED DURING ACTIVE WORK WITHIN THE CHANNEL. THE STREAM RESTORATION CONTRACTOR SHALL INSTALL A TURBIDITY CURTAIN AT THE DOWNSTREAM EXTENT OF THE PROJECT AREA TO MINIMIZE THE MIGRATION OF SEDIMENT DOWNSTREAM WHILE CONDUCTING STREAM BANK WORK WHEN / IF THE PUMP AROUND DEVICE IS NOT IN USE. THE CONTRACTOR WILL ALSO UTILIZE EARTHEN COFFERDAMS DURING THE INSTALLATION OF STREAM BANK, AND ADJACENT, STRUCTURES TO SEGREGATE THE WORKSPACE AND REDUCE INSTREAM SEDIMENTATION. THE IMPLEMENTATION OF THE STREAM RESTORATION DESIGN WILL OCCUR DURING PHASE II. ANY WOODY MATERIAL THAT MUST BE CLEARED FROM THE SITE SHALL BE PRESERVED FOR USE AS INSTREAM STRUCTURES IN ACCORDANCE WITH THE STREAM RESTORATION DESIGN PLAN. PHASE III: PHASE III INCLUDES FINAL GROUND STABILIZATION ONCE ALL CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. PHASE III BMPS INCLUDE FINAL SEEDING (AS PRESCRIBED BY THESE PLANS), DUST CONTROL, MULCHING, REVEGETATION (PER THE REVEGETATION PLAN), ETC. ONCE FINAL GROUND STABILIZATION HAS OCCURED AND THE NCDEQ EROSION CONTROL INSPECTOR HAS APPROVED THE SITE FOR PROJECT / PERMIT CLOSEOUT, ALL PERIMETER MEASURES MAY BE REMOVED. ANY GROUND DISTURBANCE THAT OCCURS DURING TEMPORARY MEASURE REMOVAL SHALL BE REPAIRED, STABILIZED, AND SEEDED. GENERAL EROSION CONTROL NOTES 1. NO WORK SHALL COMMENCE UNTIL THE NORTH CAROLINA CONSTRUCTION STORMWATER NCG01 PERMIT AUTHORIZATION IS RECEIVED, THE NOTICE OF INTENT IS SUBMITTED, AND THE CERTIFICATE OF COVERAGE IS RECEIVED. 2. THERE ARE JURISDICTIONAL WATER FEATURES ON SITE. NO WORK INVOLVING JURISDICTIONAL FEATURES SHALL OCCUR UNTIL THE APPROPRIATE USACE NATIONWIDE PERMIT AUTHORIZATION IS RECEIVED. 2. PRIOR TO INITIATING WORK, SCHEDULE PRE -CONSTRUCTION MEETING WITH NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION, MOORESVILLE REGIONAL OFFICE (704-663-1699) 48 HOURS PRIOR TO CONSTRUCTION TO DISCUSS EROSION CONTROL PLAN. HOLD PRE -CONSTRUCTION MEETING. 3. UPON ESTABLISHMENT OF FINAL VEGETATIVE GROUND COVER (80% COVERAGE), CONTACT NCDEQ LAND QUALITY SECTION, MOORESVILLE REGIONAL OFFICE (704-663-1699), FOR FINAL SITE INSPECTION. 4. GROUND STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE CEASED WITHIN THE TIME FRAMES LISTED IN THE ASSOCIATED TABLE. EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stormwater General Permit NCG010000 CE001 Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Part II.E.1 of the permit. N/A Design of basins with one acre or more of drainage area for surface withdrawal as per Part II.B.8 of the permit. LOCATION INFORMATION CE001 Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to G-000 Project location & labeled vicinity map (roads, streets, landmarks) occur) G-000 North arrow and scale CE001 Identify River Basin. STORMWATER CALCULATIONS ATTACHMENT Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps if it is in a River Basin with Riparian Buffer CE001 Pre -construction runoff calculations for each outlet from the site (at requirements. (UNCHANGED)peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm GENERAL SITE FEATURES (Plan elements) events, time of concentration/storm duration, and runoff coefficients). V-001 Property lines & ownership ID for adjoining properties CE001 Design calculations for peak discharges of runoff (including the V-001 Existing contours (topographic lines) (UNCHANGED)construction phase & the final runoff coefficients for the site) CS101 Proposed contours N/A Design calcs for culverts and storm sewers (include HW, TW and CE001 Limits of disturbed area (provide acreage total, delineate limits, outlet velocities) CE101 and label). Be sure to include all access to measures, lots that will N/A Discharge and velocity calculations for open channel and ditch be disturbed, and utilities that may extend offsite. flows (easement & rights -of -way) V-001 Planned and existing building locations and elevations Design calcs for cross sections and method of stabilization for V-001 Planned & existing road locations & elevations, including existing and planned channels (include temporary linings). Include CE101 temporary access roads appropriate permissible velocity and/or shear stress data. V-001 Lot and/or building numbers N/A Design calcs and construction details for energy dissipaters below V-001 Hydrogeologic features: rock outcrops, seeps, springs, wetland culvert and storm sewer outlets (include stone/material specs & and their limits, streams, lakes, ponds, dams, etc. (include all apron dimensions). Avoid discharges on fill slopes. required local or state buffer zones and any DWQ Riparian Buffer N/A Design calcs and dimension of sediment basins (note current determinations) surface area and dewatering standards as well as diversion of V-001 Easements and drainageways, particularly required for offsite runoff to the basins). Be sure that all surface drains, including ATTACHMENT affected areas. Include copies of any recorded easements and/or ditches and berms, will have positive drainage to the basins. agreements with adjoining property owners. V-001, CS-101 Profiles of streets, utilities, ditch lines, etc. VEGETATIVE STABILIZATION N/A Stockpiled topsoil or subsoil locations N/A If the same person conducts the land -disturbing activity & any CE001 Area & acreage to be stabilized with vegetation related borrow or waste activity, the related borrow or waste CE501 - Method of soil preparation activity shall constitute part of the land -disturbing activity unless CE501 - Seed type & rates (temporary & permanent) the borrow or waste activity is regulated under the Mining Act of CE501 - Fertilizer type and rates 1971, or is a landfill regulated by the Division of Waste CE501 - Mulch type and rates (include mulch anchoring methods) Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, NOTE: Plan should include provisions for groundcover in accordance with they shall be considered separate land -disturbing activities and NPDES Construction Stormwater General Permit NCG010000. must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM N/A Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area ATTACHMENT Completed, signed & notarized FR/O Form associated with excavation, processing, stockpiles and transport ATTACHMENT Accurate application fee payable to NCDEQ ($65.00 per acre of such materials will comprise 1 or more acres, and materials will rounded up the next acre with no ceiling amount) be leaving the development tract, a mining permit will be required. NSA Certificate of assumed name, if the owner is a partnership ATTACHMENT Required Army Corps 404 permit and Water Quality 401 ATTACHMENT Name of Registered Agent (if applicable) certification (e.g. stream disturbances over 150 linear feet) ATTACHMENT Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the EROSION & SEDIMENT CONTROL MEASURES (on plan) plan sheets, local records and this form. ATTACHMENT Provide latitude & longitude (in decimal degrees) at the project C-001 Legend (provide appropriate symbols for all measures and entrance. reference them to the construction details) ATTACHMENT Two hard -copies of the plans (some regional offices require CE1Q1-CE1D3 Location of temporary measures additional plans or multiple sizes; please contact the regional 'El 03, CS101, CS104Location of permanent measures coordinator prior to such submittal.) CE10HAO-E1-03 Construction drawings and details for CE501-CE504 temporary and permanent measures. Show measures to scale on NOTE: For the Express Permitting Option, inquire at the local Regional plan and include proposed contours where necessary. Ensure Office for availability. Express Reviews are performed by design storage requirements are maintained through all phases of appointment only. construction. CE501-CE504 Maintenance requirements for measures NARRATIVE AND CONSTRUCTION SEQUENCE CE001 Contact person responsible for maintenance SITE DRAINAGE FEATURES ATTACHMENT Existing and planned drainage patterns (include off -site areas that (UNCHANGED) drain through project and address temporary and permanent conveyance of stormwater over graded slopes) ATTACHMENT Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) N/A Size, pipe material and location of culverts and sewers ATTACHMENT Soil information: type, special characteristics N/A Soil information below culvert storm outlets G-000 Narrative describing the nature & purpose of the construction activity. CE001 Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses and/or crossings. CE501 Bid specifications related only to erosion control rev. 05142019 ACTIVITY SCHEDULE (FOR PERMITTING REFERENCE ONLY) ACTIVITY TIME / MONTHS 1 2 3 4 5 6 7 8 9 10 INSTALL EROSION CONTROL ITEMS CLEARING AND GRUBBING POND GRADING AND CONSTRUCTION STREAM RESTORATION CONSTRUCTION FINAL GRADING PERMANENT SEEDING AND VEGETATION RESTORATION REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES FINAL STABILIZATION START DATE: OCTOBER 1, 2020 COMPLETION DATE: JULY 1, 2021 F_ Stabilizewithin Site Area this many calendar Timeframe Variations Description days after ceasing land disturbance (a) Perimeter dikes, 7 None swales, ditches, and erimeterslo es 7 None (b] High Quality Water H W Zones . 11710' less in length 7 slopes are or and are not (c) Slopes steeper than steeper than 2:1, 14 days are allowed 3:1 . 7 days For slopes greater than 511' in length and with slopes steeper than 4:1 14 . 7 days for perimeter dikes, swales, ditches, (d) Slopes 3:1 to 4:1 perimeter slopes, and HQW Zones • 10 days For the Falls Lake Watershed ■ 7 days for perimeter dines, swales, ditches, 14 perimeter slopes, and HQW Zones (e) Areas with slopes • 10 days for the Falls Lake Watershed unless Flatter than 4:1 there is zero slope. SILT FENCE DESIGN CALCULATION Acres Drained = 6.30 67 CY/ACRE x 6.30 ACRES= 422.1 CY 411 LF/ Designed Silt Fence x 1.17 CY Capacity/LF = 480.87 CY of Designed Retention Capacity EROSION AND SEDIMENT CONTROL KEY BMP SYMBOL BMP DESCRIPTION DETAIL SHEET 1P01 PERMANENT SEEDING CE502 TS TEMPORARY SEEDING CE502 D(; DUST CONTROL CE503 MULCHING CE503 TSC TEMPORARY STREAM CE503 CROSSING SD STREAM DIVERSION VIA CE504 PUMP AROUND TC TURBIDITY CURTAIN CE501 CONSTRUCTION ENTRANCE CE501 SF-2 REINFORCED SILT FENCE CE501 SF-1 STANDARD SILT FENCE CE501 SFO SILT FENCE OUTLET CE501 V ❑ VEGETATIVE STREAMBANK CE504 STABILIZATION RECP ROLLED EROSION CONTROL CE504 PRODUCT DW DEWATERING FILTER BAG CE501 FS PERIMETER FILTER SOCK CE502 TpSI TOPSOILING CE503 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL NOTES DRAWING BY KAD DATE INITIALS REC & STD Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CAROLINA - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 14 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 9 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE001 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER Q 0 (V O N ti PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in if no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfails inspected, discharge 7 calendar days 2. Date and time: of the inspection, outfalis (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1_ Description, evidence} and date of corrective actions taken, and accessible) event a 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional office per Part III, Section C, Itern (2)(a) of this permit. (6) Ground After each phase I. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground covert'. 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevztions and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications_ (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART 11, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or mare shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) ❑ewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances In excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215,85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0358. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment a Within 24 hours, an oral or electronic notification. deposition in a a Within 7 calendar days, a report that contains a description of the stream or wetland sediment and action:; taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. ■ If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and ■ Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above (c) Anticipated a A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated ■ Within 24 hours, an oral or electronic notification. bypasses [40 CFR Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance Within 24 hours, an oral or electronic notification, w1h the conditions Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). * Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING p. Suit `i NORTH CAROLI NA .5 Environmental Quality EFFECTIVE: 04/01/19 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL NOTES DRAWING BY KAD DATE INITIALS REC & STD r6111 Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 Know what's below. 4;0 Call before you dig. Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 10 OF 18 SCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE002 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER Q 0 (V O N ti GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding * Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed * Hydroseeding • Appropriately applied straw or other mulch * Shrubs or other permanent plantings covered • Plastic sheeting with mulch * Uniform and evenly distributed ground cover sufficient to restrain erosion * Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PRMS/Flocculonts and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. if 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLI NA Environmental Quality CLEMLY 11 A URI AM 0 ❑NSITE CONCRETE WASHOUT STRUCTURE WITH LINER >aa SECTinu A -A FfflIAL LOCATM DETEATMEI IN FMJD L THE M K NAWA 1Ad L� AWL EEE*X= 7= OF THE f1D1iCT{ND S -MX a Eronr MA�I{k7 VMM SOVIGIE NIFFM DEVICE. � a HL Tldl A P1.1% J FAM. L OCATM DETEAIIIMED IN CLE41LY MAIM IIIBIMii FDA.D mum XVICE arxw MDN E THE COI0111M WASHM 270M1/IEB =MALL K "AWANIM VIRII 7W LTfAi f! Nwm 70.10 NEACM 7IDI Cr THE�Pr comm To FWVIX AMWTE HISA � CAPACITY VMM A DOOM am 2 NCHM OF FFAZM M& ABOVE GRADE 46SH[BJT INIM TB MADE MOTIMB 3114 . STRUCTURE CONCRETE WASHOUTS 1. ❑o not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL NOTES DRAWING BY KAD DATE INITIALS REC & STD Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 11 OF 18 SCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE003 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER Q 0 "24 \ \ S 1 0 C R J J \ _ + �1 I J—LOD—LOD—LOD—LOD �—LOD—LOD--LOD LODLOD LOD LOD LO (3' LOD LOD �LOD LOD-74 LOD LOD—ZOD LO�OD co LOD —LOD` DD LOD L� L� LOD LOD L LOD�732 722—, �LOD LOD LOD LO�OD LOD OLOD LOD LOD -720 1OO1 0 TS DC — ❑ 0 _71 \ M / BEDROCK ENVIRONMENTAL T SI M 8� \ \ TpSI � � — , \ \ p \ o /�2� \ 725 ROAD WATTLE _ N P \J \ / 722 - \ 1 \ ^ OGYC G0 0 / \ I I � -� o 3g6PN,kL R0 I \ 0 o \ I3,00 � I _ \ _ \I TSC 0I I \\ \ \\ \\oOcgO ° MP 724\0PG — SF-2 0 BOO- PG 0� sF I0, O366-N�� � o 0 \ M \ \ / o \,\—\' �\—� TWO ROWS OF SENSITIVE \ \ \ TYPE SILT FENCE o / \ FS / TURBIDITY CURTAIN � II � BEDROCK ENVIRONMENTAL ROAD WATTLE 7, (AS NEEDED) o I \ � 0 18 COIR FIBER I \ FILTER SOCK T(; \ � F I a _ 4x91 o 0 \ \ 72140P PUMP AROUND OUTLET o \ / LOCATION WITH ROCK DISSIP000/ ATER l o 20 ° 3 I I FS TWO ROWS OF SENSITIVE °\ I — SF TYPE SILT FENCE PUMP AROUND DAM AND S, \ \� WITHDRAWAL LOCATION 715 0 S ID pis 18" COIR FIBER -0 ��2° \ _ \ \ ti / W co o —� \ FILTER SOCK 0') \ SF 2 I 720 -73 \ \ \ -1(9 TS DC TS DC — / /- \ \ \ — \ \ TpSI M \ 0 -722— \ \ 74 \� _� — — \ \ \ \ \ \ o LOD— LOD� O �— \ \ —� \ \ \ \ \ _��Of) — LODE LOD�LO\ LOD 724 LOD�LOD —LOD \ \ \ \ \ / \ LOD D LOD—LOD—L LOD \ \ _726,LO \ LO—LOD LOD \ _ / /—LOD�LOD� OD�rLOD—\D / ��LODD jLOD�LOQ_�LOD \ \� \ \ \ \ INITIAL PHASE - EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL PLAN NOTES: 1. LAND DISTURBING ACTIVITIES MAY NOT OCCUR UNTIL THE NCG01 CONSTRUCTION STORMWATER PERMIT HAS BEEN OBTAINED, NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED, AND THE CERTIFICATE OF COVERAGE (COC) HAS BEEN AQUIRED. 2. PRIOR TO LAND DISTURBING ACTIVITIES, THE CONSTRUCTION CONTRACTOR SHALL CONTACT THE NCDEQ MOORESVILLE REGIONAL OFFICE TO SCHEDULE AN IN -PERSON CONSTRUCTION KICK-OFF MEETING (704-663-1699). 3. IN -STREAM LAND DISTURBING ACTIVITIES SHALL NOT OCCUR UNTIL THE USACE NATIONWIDE PERMIT (NWP) 27 APPROVAL AND NCDEQ 401 WATER QUALITY CERTIFICATION IS OBTAINED. 4. CONSTRUCTION ACTIVITIES SHALL BE SEQUENCED IN CONCURRENCE WITH THE THREE PHASE EROSION CONTROL PLAN. 5. PHASE I, OR THE INITIAL PHASE OF THE EROSION CONTROL PLAN, SHALL INCLUDE THE FOLLOWING ACTIVITIES: 5.1. INSTALLATION OF PERIMETER MEASURES 5.1.1. REINFORCED SILT FENCE (SF-2) 5.1.2. COMPOST FILTER SOCK (FS) 5.1.3. TEMPORARY STREAM CROSSING VIA TIMBER BRIDGE (TSC) 5.1.4. STAGING OF STREAM DIVERSION PUMP AROUND DEVICE (SD) 5.1.5. STAGING OF TURBIDITY CURTAIN (TC) 5.1.6. CONSTRUCTION ENTRANCE (CE) 6. THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP) SHALL BE UTILIZED AS NECESSARY DURING ALL LAND DISTURBING ACTIVITIES WITHIN THE LIMITS OF DISTURBANCE (LOD). 6.1. TEMPORARY SEEDING (TS) 6.2. MULCHING (M) 6.3. TOP SOILING (TpSI) 6.4. DUST CONTROL (DC) 7. CLEARING WITHIN THE LOD SHALL BE LIMITED TO THE GREATEST EXTENT PRACTICABLE. ALL CLEARED VEGETATION SHALL BE RESERVED ON -SITE FOR USE DURING THE STREAM RESTORATION ACTIVITIES. 8. CLEARING SHALL BE AT THE DIRECTION OF THE ENGINEER, OR THEIR REPRESENTATIVE. 9. THE CONSTRUCTION ENTRANCE IS TO BE LOCATED ALONG FORNEY HILL ROAD AT AN EXISTING PERMANENT ACCESS ROAD. 10. FILTER SOCK (FS) DEPICTED AT THE TOP OF BANK SHALL BE 18" COIR FIBER MATERIAL. FILTER SOCK SHALL BE PLACED AT TOP OF BANK AFTER THE COMPLETION OF WORK EACH DAY, ON NON -WORKING WEEKENDS, AND PRIOR TO STORM EVENTS. 11. FILTER SOCK (FS) DEPICTED AT THE APPROACHES TO THE TEMPORARY STREAM CROSSING (TSC) (NOT TO SCALE) SHALL BE BEDROCK ENVIRONMENTAL ROAD WATTLES. DEVICES SHALL BE PLACED AT THE TSC APPROACHES AT THE END OF EACH WORK DAY, ON NON -WORKING WEEKENDS, AND PRIOR TO STORM EVENTS. TWO 18-FOOT ROAD WATTLES SHALL BE SUPPLIED; ONE LOCATED AT EACH TSC APPROACH. 12. PUMP AROUND DISCHARGE LOCATION SHALL BE STABILIZED USING ROCK DISSIPATER OR ENGINEER APPROVED ALTERNATIVE. INSTREAM ENERGY DISSIPATER MEASURES TO BE REMOVED PRIOR TO CONSTRUCTION COMPLETION. 13. THE EXISTING ACCESS ROAD BETWEEN FORNEY HILL ROAD AND THE PROJECT AREA SHALL BE MAINTAINED IN -KIND WITH EXISTING CONDITIONS AND WITH THE CONSTRUCTION ROAD STABILIZATION (CRS) DETAIL PROVIDED IN THE EROSION AND SEDIMENT CONTROL DETAILS. UPON PROJECT COMPLETION, THE ACCESS �0 r PL PL PL )d LAT:N35°31'03.890" LONG:W81 °02'40.665" ROAD SHALL BE RESTORED TO PRE -CONSTRUCTION CONDITIONS, PER LANDOWNER REQUIREMENTS. • 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH Natu ra I Gas INITIAL PHASE - EROSION AND SEDIMENT CONTROL PLAN DRAWING BY KAD DATE INITIALS REC & STD I I STATION ID PRINCIPAL DATE INITIALS COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 PL PL PL Know what's below. Call before you dig. Dial 811 Or Call 800-282-7411 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 12 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE 101 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER '24 \ \ o ��II ;C— R\ \ S \ P—LOD—LOD—LOD LO D LOD LOD —ZOD LOD I OD—LOD LOD �LOD LOD—t—LOD LOD -LOD J_ L LOD -LOD � 732 —LOD—LOD—LOD—LOD—LOD OD LL�OD 722—, \LOD LOD LOD LODETbOD TS LOD�OD LOD � LOD OD LOT SI ill$ -718TpSI 10O1 I I0 M 1 �� 725 —00 I/ 722,E — — \ \ _ CO ^ �C G \ o p 53 �_� + BEDROCK ENVIRONMENTAL g0° G 0 \ /\� \ 6 P J I i x \ \ FS ROAD WATTLE 3 ��- I �N \ ORN� o J TSC , r \ o r o \ \ \ �ROGK22g3 1� X�c'� '� \ ►� \ \`` r r \ \ \ 7 I ° 1 ^jI\/-/�/j/\ �r ► ��S r r \r 24 — — S F-2 a°° i� — 66'pN`7�LL\� ie 0 U 0 o J ���\�\\ _ / �%✓��- _ ' :,� .� _ �,� r — sF _/ TWO ROWS OF SENSITIVE\I \ r _` —rrr— i TYPE SILT FENCE gZz- \ TURBIDITY CURTAIN (AS NEEDED) \ 18" COIR FIBER \ ---_ r r r r r r \ \ r r r r r r r r r � \ o � � � FILTER SOCK rr r\fir � ;', �� rr r\��-��\% �„ `� \ �,: � �\� — 2-� TC — J r r r rr r r \ \ S0 r SD o \ r j r /' % r �.��� r r r r r +79 , \ J \ \ J// FS r r rj /� / / //�� t/ r r r \-�'r r rr PUMP AROUND OUTLET o LOCATION WITH ROCK DISSIPATER l FS \ \ = / r ✓ r r / / r \ �\ J\ TWO ROWS OF SENSITIVE TYPE SILT FENCE \ I BEDROCK ENVIRONMENTAL PUMP AROUND DAM AND \ — I r ROAD WATTLE WITHDRAWAL LOCATION 71g / , o \ \ o+oo r\ r I 2 _ f D 18" COIR FIBER 720 _ '� r FS FILTER SOCK �2 r- 73 \ \ I _ o \ 73 I o\� \ 30\ TpSI M \ \ \ \ \ o o / / \ \ \ \ 32 �' \ \ `722- I 14 DC — \ \ \o / / __ CLOD � / � LOD LODE / / O /—� \ \ \ \ \ ofl LODE LOD�— LOD LOD E 724, —\ DLOD LOD—�\ \ \ CLOD LOD�LOD�� \ \ � ' CLOD \ \ / \ ��, ,\ t'OLO LOD D L- / �_726- O /— \ \ LOD_ LOD70 LOD�LODD �� \ _ / —LOD — L \ \ \ \ \ 1 _�� L017—CLOD —LOD�LOD�LOD�cLO\ INTERMEDIATE PHASE - EROSION AND SEDIMENT CONTROL PLAN / �4�--LOD � D� N � - � �I Or Call 800-282-7411 EROSION AND SEDIMENT CONTROL PLAN NOTES: 1. LAND DISTURBING ACTIVITIES MAY NOT OCCUR UNTIL THE NCG01 CONSTRUCTION STORMWATER PERMIT HAS BEEN OBTAINED, NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED, AND THE CERTIFICATE OF COVERAGE (COC) HAS BEEN AQUIRED. 2. PRIOR TO LAND DISTURBING ACTIVITIES, THE CONSTRUCTION CONTRACTOR SHALL CONTACT THE NCDEQ MOORESVILLE REGIONAL OFFICE TO SCHEDULE AN IN -PERSON CONSTRUCTION KICK-OFF MEETING (704-663-1699). 3. IN -STREAM LAND DISTURBING ACTIVITIES SHALL NOT OCCUR UNTIL THE USACE NATIONWIDE PERMIT (NWP) 27 APPROVAL AND NCDEQ 401 WATER QUALITY CERTIFICATION IS OBTAINED. 4. CONSTRUCTION ACTIVITIES SHALL BE SEQUENCED IN CONCURRENCE WITH THE THREE PHASE EROSION CONTROL PLAN. 5. PHASE II, OR THE INTERMEDIATE PHASE OF THE EROSION CONTROL PLAN, SHALL INCLUDE THE FOLLOWING ACTIVITIES: 5.1. MAINTENANCE OF PERIMETER MEASURES AND INSTALLATION OF ADDITIONAL MEASURES FOR STREAM RESTORATION ACTIVITIES. THESE MEASURES INCLUDE: 5.1.1. REINFORCED SILT FENCE (SF-2) 5.1.2. COMPOST FILTER SOCK (FS) 5.1.3. TEMPORARY STREAM CROSSING VIA TIMBER BRIDGE (TSC) 5.1.4. STREAM DIVERSION PUMP AROUND DEVICE (SD) 5.1.5. TURBIDITY CURTAIN (TC) 5.1.6. CONSTRUCTION ENTRANCE (CE) 6. THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP) SHALL BE UTILIZED AS NECESSARY DURING ALL LAND DISTURBING ACTIVITIES WITHIN THE LIMITS OF DISTURBANCE (LOD). 6.1. TEMPORARY SEEDING (TS) 6.2. MULCHING (M) 6.3. TOP SOILING (TpSI) 6.4. DUST CONTROL (DC) 7. CLEARING WITHIN THE LOD SHALL BE LIMITED TO THE GREATEST EXTENT PRACTICABLE. ALL CLEARED VEGETATION SHALL BE RESERVED ON -SITE FOR USE DURING THE STREAM RESTORATION ACTIVITIES. 8. CLEARING SHALL BE AT THE DIRECTION OF THE ENGINEER, OR THEIR REPRESENTATIVE. 9. THE CONSTRUCTION ENTRANCE IS TO BE LOCATED ALONG FORNEY HILL ROAD AT AN EXISTING PERMANENT ACCESS ROAD. 10. FILTER SOCK (FS) DEPICTED AT THE TOP OF BANK SHALL BE 18" COIR FIBER MATERIAL. FILTER SOCK SHALL BE PLACED AT TOP OF BANK AFTER THE COMPLETION OF WORK EACH DAY, ON NON -WORKING WEEKENDS, AND PRIOR TO STORM EVENTS. 11. FILTER SOCK (FS) DEPICTED AT THE APPROACHES TO THE TEMPORARY STREAM CROSSING (TSC) (NOT TO SCALE) SHALL BE BEDROCK ENVIRONMENTAL ROAD WATTLES. DEVICES SHALL BE PLACED AT THE TSC APPROACHES AT THE END OF EACH WORK DAY, ON NON -WORKING WEEKENDS, AND PRIOR TO STORM EVENTS TWO 18-FOOT ROAD WATTLES SHALL BE SUPPLIED; ONE LOCATED AT EACH TSC APPROACH. 12. PUMP AROUND DISCHARGE LOCATION SHALL BE STABILIZED USING ROCK DISSIPATER OR ENGINEER APPROVED ALTERNATIVE. INSTREAM ENERGY DISSIPATER MEASURES TO BE REMOVED PRIOR TO CONSTRUCTION COMPLETION. 13. CONSTRUCTION ACTIVITIES TO BE SEQUENCED TO COMPLETE STREAM RESTORATION ACTIVITIES, ESTABLISH FINAL GRADE, AND STABILIZE WORKSPACE AS THE PROJECT PROGRESSES DOWNSTREAM, TO PREVENT UNNECESSARY AMOUNT OF ACTIVE WORKSPACE. 14. PERMANENT SEEDING/ STABILIZATION AND IMPLEMENTATION OF THE REVEGETATION PLAN SHALL COMMENCE ONCE THE STREAM RESTORATION ACTIVITIES ARE COMPLETE. -o PL PL PL �d \ LAT:N35'31'03.890" LONG:W81'02'40.665" PL PL PL Know what's below. Call before you dig. ® Dial 811 15. THE EXISTING ACCESS ROAD BETWEEN FORNEY HILL ROAD AND THE PROJECT AREA SHALL BE MAINTAINED IN -KIND WITH EXISTING CONDITIONS AND WITH THE CONSTRUCTION ROAD STABILIZATION (CRS) DETAIL PROVIDED IN THE EROSION AND SEDIMENT CONTROL DETAILS. UPON PROJECT COMPLETION, THE ACCESS ROAD SHALL BE RESTORED TO PRE -CONSTRUCTION CONDITIONS, PER LANDOWNER REQUIREMENTS. 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH N atu ra I Gas INTERMEDIATE PHASE - EROSION AND SEDIMENT CONTROL PLAN DRAWING BY KAD DATE INITIALS REC & STD STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 13 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE102 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER '24 \ \CD o \ \ _� I CRS �LOD LOD-7,-LOD LOD—�-�OD LOD�OD LOD LOD LOD LOD1 \ \ \ - OD I-LOD-t9Do�=o OD-LOD LOD LOD 1 J— L 732 \ 722 � \ OD LOD �LOD LOD LOD LODE �TbOD LOD L� L� LOD L I _LO�- OD LOD LOD LOD l/ O o � I ',� 0 -720 F- 0 \ \ _ I I \ \ '718 PS -I \ c� 3 \ 725 \ I TpSI M I ,12 _ _ _� MpNW o \ % + / / 800 G 0 \ / \ 6 0 g6P LR I J I 3 N\� \ o o \ I / C P o \ NR 22 10 72 I \ CFO / � {',` t ,:. ;. '• ,ram,+ �.'y' � 50 G + J \ \ art ay \ o \ ��o \ / + •{,' , ; 2X�o ' " + r+r'+ R E C P15 o / /+, ,/'+ y; RECP q a; :+,y'• — / i \ I COIR FIBER MATTING (>700 GRAM) o \ 2+5 0 - ON STREAM BANKS \ I aye . 6T79 '20 \ + r/+ '+y ' y';++ ; y try :+a.'v+ y / / / y {" + "+•+ + : n \ 0 \R cp RECP \ ' 0" \ COIR FIBER MATTING >700 GRAM i` �\ \ \ ON STREAM BANKS 0+ 00 o I 0 720— RECP \ yam+ + o 73 /\ \ \ \ \ \ / / / _1 \ \ 0 —73 _ I = PS D \ \ ° <2 TpSI M o 0 -722- \ \ \ \ PS DC \ \ — — \ _ \ \ Lo \� \/ �� \ 134 \\ \ —LOD��o — _ M \ \ \ \ —�ofl-LOD—LOD�LO\LOD-L"Q—LOD 724 0___, � TpSI \ —L���—LOD -LOD \ \ \ \ \ _ \-LO� LODE l.�z' LOD OD \ \ O _726- LOD —Loy—LOD—La-Lo�`— \ \ \ 0 40 80 ,LOD—LOD�LO<7��LOD \ \ \ FINAL PHASE - EROSION AND SEDIMENT CONTROL PLAN Feet EROSION AND SEDIMENT CONTROL PLAN NOTES: 1. LAND DISTURBING ACTIVITIES MAY NOT OCCUR UNTIL THE NCG01 CONSTRUCTION STORMWATER PERMIT HAS BEEN OBTAINED, NOTICE OF INTENT (NOI) HAS BEEN SUBMITTED, AND THE CERTIFICATE OF COVERAGE (COC) HAS BEEN AQUIRED. 2. PRIOR TO LAND DISTURBING ACTIVITIES, THE CONSTRUCTION CONTRACTOR SHALL CONTACT THE NCDEQ MOORESVILLE REGIONAL OFFICE TO SCHEDULE AN IN -PERSON CONSTRUCTION KICK-OFF MEETING (704-663-1699). 3. IN -STREAM LAND DISTURBING ACTIVITIES SHALL NOT OCCUR UNTIL THE USACE NATIONWIDE PERMIT (NWP) 27 APPROVAL AND NCDEQ 401 WATER QUALITY CERTIFICATION IS OBTAINED. 4. CONSTRUCTION ACTIVITIES SHALL BE SEQUENCED IN CONCURRENCE WITH THE THREE PHASE EROSION CONTROL PLAN. NO. DATE IREVISION(S) DESCRIPTION 1 07/08/20201 ISSUED FOR 100% REVIEW 2 07/29/20201 ISSUED FOR PERMITTING 5. PHASE III, OR THE FINAL PHASE OF THE EROSION CONTROL PLAN, SHALL INCLUDE THE FOLLOWING ACTIVITIES: 5.1. REMOVAL OF ALL TEMPORARY MEASURES ONCE APPROPRIATE STABILIZATION HAS BEEN MET AND THE NCDEQ MOORESVILLE REGIONAL OFFICE EROSION CONTROL INSPECTOR HAS APPROVED THE REMOVAL OF TEMPORARY DEVICES. THE FOLLOWING MEASURES (AS SHOWN) ARE TO BE IMPLEMENTED TO ACHIEVE FINAL STABILIZATION IN ANTICIPATION OF PROJECT COMPLETION. 5.1.1. PERMANENT SEEDING (PS) 5.1.2. MULCHING (M) 5.1.3. TOP SOILING (TpSI) 5.1.4. DUST CONTROL (DU) 5.1.5. ROLLED EROSION CONTROL PRODUCT (RECP) TO BE INSTALLED PER THE RECP DETAIL WITHIN LIVE WILLOW STAKES PLANTING BOUNDARY [BETWEEN BANKFULL AND TOE OF SLOPE] 5.1.6. IMPLEMENTATION OF THE REVEGETATION PLAN 5.1.6.1. WETLAND & RIPARIAN SEED MIX, LIVE WILLOW STAKES, TREE PLANTING, AND SHRUB PLANTING 6. THE CONSTRUCTION ENTRANCE (CE) SHALL BE REMOVED PRIOR TO PROJECT COMPLETION. 7. UPON NCDEQ APPROVAL AND PROJECT ACCEPTANCE BY POND, ALL PERMITS TO BE TERMINATED. 8. CONTRACTOR TO CONTINUE MAINTENANCE OF FINAL PHASE EROSION CONTROL UNTIL PERMIT CLOSURE. 9. CONTRACTOR TO CONDUCT 1-YEAR POST CONSTRUCTION MONITORING PER THE REVEGETATION PLAN. 10. THE EXISTING ACCESS ROAD BETWEEN FORNEY HILL ROAD AND THE PROJECT AREA SHALL BE MAINTAINED IN -KIND WITH EXISTING CONDITIONS AND WITH THE CONSTRUCTION ROAD STABILIZATION (CRS) DETAIL PROVIDED IN THE EROSION AND SEDIMENT CONTROL DETAILS. UPON PROJECT COMPLETION, THE ACCESS ROAD SHALL BE RESTORED TO PRE -CONSTRUCTION CONDITIONS, PER LANDOWNER REQUIREMENTS. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 BY CHK APPD DESCRIPTION APPROVALS -o PL PL PL �d \ LAT:N35'31'03.890" LONG:W81'02'40.665" &^��3 -in U a L a W oN Coo REVEGETATION LEGEND: THREE -GALLON NURSERY TREES [30] PL PL PL ERNMX - 307 NC PIEDMONT RIPARIAN SEED [0.50 ACRES] ERNMX - 308 NC PIEDMONT WETLAND SEED [0.10 ACRES] LIVE WILLOW STAKES (Salix Nigra) PLANTING ZONE (TRIANGULAR PATTERN) [8,823 SQUARE FEET, -2,500 LIVE STAKES] ROLLED EROSION CONTROL PRODUCT (RECP) PER DETAIL [>700 GRAM COIR FIBER MATTING] 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 KAD WFB AS AREA CODE - DATE DATE INITIALS INITIALS REGIONAL ENGINEER PiedmontDUKE N atu ra I Gas COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 MARSHALL STREAM RESTORATION FINAL PHASE - EROSION AND SEDIMENT CONTROL PLAN L I N C O L N COUNTY NORTH CA RO L I N A 7 KAD WFB AS ACCOUNT NUMBER - PROJECT NUMBER 1190706 DATE DATE INITIALS INITIALS MGR TECH REC & STD DRAWING BY KAD STATION ID - DATE DATE INITIALS INITIALS PRINCIPAL ENGINEER CHECKER INITIAL WFB Know what's below. Call before you dig. Dial 811 Or Call 800-282-7411 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 14 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE103 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER SF-1 SILT FENCE - TYPE NON -SENSITIVE Wire fence Crass -Section View Filter Steel fabri6 post Backfill trench Natural and compact ground heroughly •,.•mne, Upsllr e.�.. min 24' SFO TOP OF SILT F MUST BE AT LE ABOVE THE TI THE WATTI 18" FILTRI AND 1 SIDE VIEW FRONT VIEW GENERAL NOTES: 1. FLOW SHALL NOT RUN PARALLEL WITH SILT FENCE. 2. END OF SILT FENCE SHALL BE TURNED UPHILL. 3. ALL POSTS SHALL BE STEEL. INSTALLATION NOTES: 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH RON WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR FOR A TOTAL OF 4 TRIPS. MAINTENANCE NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 5. CLEAN OUT AT 50% CAPACITY USAGE. 6. LIFE OF FENCE: 6-9 MONTHS. STANDARD SILT FENCE OUTLET WITH 01 rf 01 INSTALL STEEL STAKES 411 IN FILTER SOCKS AS NECESSARY TO PREVENT MOVEMENT WATTLE 1 SILT FENCE u FILTER FABRIC, AND HARDWARE STEEL POST SET CLOTH IN TRENCH. MAX 2' APART MIN 2' INTO SOLID GROUND INSTALLATION NOTES: 1. INSTALL SILT FENCE ADJACENT TO OUTLET STRUCTURE PER SF-1 & SF-2 DETAILS. 2. OUTLET STRUCTURE SHALL BE STABILIZED BY STEEL POSTS SPACED NO GREATER THAN FOUR FEET APART. 3. UTILIZE WOVEN WIRE FABRIC FOR SILT FENCE OUTLET IN PLACE OF SILT FENCE FILTER FABRIC. 4. UTILIZE AN 18" FILTREXX SILTSOXX AND A 12" EXCELSIOR WATTLE AT FOR FILTRATION ALONG THE ENTIRE LENGTH OF WOVEN WIRE FABRIC AT SILT FENCE OUTLET. 5. INSTALL WATTLE AND SILTSOXX PER MANUFACTURERS REQUIREMENTS. 6. ALL FILTER SOCKS SHALL HAVE MULCHING INSTALLED AT EDGES ADJACENT TO SILT FENCE TO PREVENT UNTREATED FROM FROM EXITING THE WORK AREA. 7. UTILIZE POLYACRYLAMIDE (PAM) ON THE FILTER SOCKS PRIOR TO RAIN EVENTS. REAPPLY AFTER EACH RAIN EVENT. 8. WATTLE TO BE KEYED IN AND MULCHED PER MANUFACTURERS SPECIFICATIONS. 9. INSTALL 6'x3'x3' SEDIMENT PIT UPSLOPE OF OUTLET. ORIENTATION WILL VARY DEPENDING ON TERRAIN. MAINTENANCE NOTES: 1. REMOVED SEDIMENT FROM WATTLE, FILTER SOCK, AND SEDIMENT PIT WHEN THEY REACH 50% SEDIMENT RETENTION CAPACITY. 2. REPLACE WATTLE / FILTER SOCK AS NEEDED TO ENSURE DEWATERING AND PROPER FILTRATION. 3. PAM SHALL BE REAPPLIED TO THE DEVICE PRIOR TO ALL RAIN EVENTS. 4. MAINTAIN ADJACENT SILT FENCE PER SF-1 AND SF-2 DETAILS. SF-2 TOP A�N0 801TTDMI :S'. SWALL. RE 10 GAUGE CE FROM DE PUMP SILT FENCE - TYPE REINFORCED FILTRATION OEOTE7"LEE FILTF IXICE-14 001 OF CEOFTFE XTILE 1i }1Y,II T-? INTO TRENCH 41' INJAXI'� INSTALLATION NOTES -USE FILTIRATION MWEXTILE A MINIMUM OF 31r IN VdDTH AND FASTED ADECAJATELY TO THE POSTS AND MITRE AS DIRECTED. -USE "RE A MINIMUM OF 3r IN VADTH AND VATH A MI IMUM OF E UNE WES VATH 12" STAY SPACING. -PROVIDE S'-W STEEL POST OF THE SIB -FASTENER ANGLE STEEL TYPE. -FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTTEK71LE SMALL RE A MAXIMUM OF 18" ASOW GROUND SURFACE' MAIN'TENiiN,NCE NQM: REMOVE AND DISPOSE OF SILT A=MULATIONS WHEN THE DEPTH) REACHES ONE-HALF OF THE HEIGHT OF THE IGEOiEXTILE. -REMOVE AND REPLACE DETERIORATED OR CLOGGED STILE. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE / EXIT 1*040 *F '•� coarse aggregate.y. FILTER BAG REINFORCED TEMPORARY SILT FENCE DETAIL ESA GWIDANCEP DUa .�. NOTES: 1. THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE / EXIT IS TO PROVIDE A BUFFER AREA WHERE VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST. 2. IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. 3. LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE THE MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. INSTALLATION: 1. CONSTRUCTION ENTRANCE / EXIT SHALL BE CONSTRUCTED AT A MINIMUM OF 6 INCH THICKNESS, 12 FEET IN WIDTH, AND 50 FEET IN LENGTH. 2. 2-3 INCH COURSE AGGREGATE IS TO BE USED AS THE CONSTRUCTION ENTRANCE SUBSTRATE. MAINTENANCE: 1. MONITOR DAILY TO SUPPLEMENT STONE TO ENSURE ENTRANCE FUNCTIONS PROPERLY. 2. CLEAN ANY MATERIAL TRACKED ONTO PUBLIC ROADWAY IMMEDIATELY. 3. SCHEDULE ROUTINE SWEEPING AT THE END OF EACH WORKDAY. SF-1 SILT FENCE AROUND FILTER BAG FROM DEWATE DW DEWATERING FILTER BAG 0 J L.� w Q TURBIDITY CURTAIN SYSTEM NOTES: 1. ENVIRO-USA TYPE 2 MEDIUM DUTY TURBIDITY CURTAIN, OR EQUIVALENT, FOR MOVING WATER, TO BE UTILIZED. 2. INSTALL AND MAINTAIN PER MANUFACTURERS SPECIFICATIONS. 3. CURTAIN TO BE INSTALLED AROUND ACTIVE WORK AREA. TURBIDITY CURTAIN IS NOT TO BE INSTALLED PERPENDICULAR TO FLOW. 4. TEMPORARILY STABILIZE WORK AREA PRIOR TO REMOVING TURBIDITY CURTAIN. 5. SILT CURTAINS SHOULD BE ORIENTED PARALLEL TO THE DIRECTION OF FLOW. 6. FOR SITES NOT SUBJECT TO HEAVY WAVE ACTION, THE CURTAIN HEIGHT SHALL PROVIDE SUFFICIENT SLACK TO ALLOW THE TOP OF THE CURTAIN TO RISE TO THE MAXIMUM EXPECTED HIGH-WATER LEVEL (INCLUDING WAVES) WHILE THE BOTTOM MAINTAINS CONTINUOUS CONTACT WITH THE BOTTOM OF THE WATER BODY. THE BOTTOM EDGE OF THE CURTAIN SHALL HAVE A WEIGHT SYSTEM CAPABLE OF HOLDING THE BOTTOM OF THE CURTAIN DOWN AND CONFORMING TO THE BOTTOM OF THE WATER BODY, SO AS TO PROHIBIT ESCAPE OF TURBID WATER UNDER THE CURTAIN. 7. THE SILT CURTAIN SHALL BE LOCATED BEYOND THE LATERAL LIMITS OF THE CONSTRUCTION SITE AND FIRMLY ANCHORED INTO PLACE (THE ALIGNMENT SHOULD BE SET AS CLOSE TO THE WORK AREA AS POSSIBLE BUT NO SO CLOSE AS TO BE DISRUPTED BY CONSTRUCTION EQUIPMENT). 8. THE ENDS OF THE SILT CURTAIN SHALL BE SECURELY ANCHORED AND KEYED IN ORDER TO ENCLOSE AREA. 9. A GENERAL RULE OF THUMB FOR ATTACHING ANCHORS IS TO DO SO AT 100, INTERVALS (DEPENDING ON CURRENT AND TIDAL CONDITIONS, IT MAY BE NECESSARY TO ANCHOR THE BARRIER ON BOTH SIDES -AS SHOWN). GENERAL NOTES: 1. FILTER BAG MATERIAL IS BASED ON PARTICLE SIZE TO BE FILTERED. COURSE PARTICLES REQUIRE WOVEN MATERIAL; SILTS AND CLAYS REQUIRE NON -WOVEN MATERIAL. 2. DO NOT OVER PRESSURIZE FILTER BAG OR USE BEYOND CAPACITY. 3. LOCATE DISCHARGE IN A FLAT AREA UPSTREAM OF WELL ESTABLISHED VEGETATION. 4. DISCHARGE IS NOT PERMITTED WITHIN 15 FT OF A STREAM. 5. FILTERED MATERIAL TO BE SPREAD OVER SITE, SEEDED AND MULCHED AS SHOWN ON THE ES&PC PLAN. TYPE C SILT FENCE AROUND FILTER BAG AGGREGATE OR STRAW WITH GEOTEXTILE LINER UNDER FILTER BAG PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL DETAILS DRAWING BY KAD DATE INITIALS REC & STD r6l Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 -1 10' MAX 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 Know what's below. 4;0 Call before you dig. Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 15 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE501 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER 2" WOODEN STAKE 2 FT. � � 2 18" WATTLE II .. .. ..�.._..._..�. 15"-16" 4 FT. SEE INSET A -11 II 11,11 �-I 11=1 11=1I �I I �I I I-1I1= 1 Il l lI 11 1=i=i Idg11 =III=I I L=I L=I L-I I' ITI- L - III I� I� '1111 III 11 I I=" �- UPSLOPE STAKE FLOW - PAM (1 OZ.) 2' 6�\ (MIN.) (MIN.) TOP VIEW B DOWNSLOPE STAKE PAM (1 OZ.) COIR MATTING INSTALLATION NOTES: 1. USE MINIMUM 18 IN. DIAMETER COIR FIBER WATTLE. 2. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. 3. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. 4. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. 5. INSTALL A MINIMUM OF ONE FOOT OVERLAP WHERE DITCH TYPICAL SECTIONS REQUIRES MORE THAN ONE WATTLE. 6. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH, 7. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. 8. [OPTIONAL] PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULENT TO BE APPLIED TO EACH WATTLE. 9. [OPTIONAL] INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN. 10. UTILIZE MULCH TO FILL VOIDS BETWEEN ADJOINING FILTER SOCKS PER MANUFACTURERS INSTALLATION REQUIREMENTS. 11. UTILIZE COIR FIBER MATTING (>700 GRAM) IN SWALES WITH CONCENTRATED FLOW. MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE WATTLE. 2. REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. FILTER SOCK WITH PAM FS TOE OF FILL OR EDGE OF PROJECT BOUNDARY 2" WOODEN STAKE 2 FT. / 3 18" WATTLE fill fill II UPSLOPE STAKE 18" 4 FT. FILL SLOPE / EDGE OF PROJECT (LOD) 4' MAX. SPACING 18" WATTLE - MULCH AROUND STRUCTURE PER MANUFACTURER'S SPECIFICATIONS. CROSS SECTIONAL VIEW 12" MIN. STAKED INTO SOIL NC Piedmont FACW Mix Mix Composition P S 41.5% Pori icum anceps (Beaked Panicgrass) 30.0% Carex vulpinafdea, NC Ecotype (Fox Sedge, NC Ecorype) 15.0% Elymus viTinicus, AR Ecotype lVi, ginia Wildrye, AR Ecotype) 4.0% Hibiscus inoscheutos, Coastal Plain NC Ecotype (Comsoneyed Rosemaflow, Coastal Plain INC Ecotype) 3.0% Juncus efjusus, 'Suther'-Piedmont INC Ecotype (Soft Rush, 'Suther -Piedmont NC Ecotype) 2.5 % Rhyri chospo ra glob ularis, RTC Ecotype (Globe Beaksedge, NC Ecotype) 2.0% Eupatorium coelestin am, VA Ecotype SD7istilower, VA Ecotype) 1.0% Carex lupuIina, Coastal Plain RrCEcotAm (Hop Sedge, Coastal Plain NC Ecotype) 0.5% Scirpus cyperinus, PA Ecotype (Woolgrass, PA Ecotype) General Product Information: Mix formulations are subject to change without notice depending on the availability of existing and new products. While the formula may change, the guiding philosophy and function of the mix will not. Item Number: ERNMX-308 Product Categories: PRINT I EMAIL I SHARD Wet %Aeadows&Wetlands Height: 0.3 - 7.0 Ft Price: $48.19/lb Seeding Rate: 20 lb per acre FRONT VIEW INSTALLATION NOTES: 1. USE MINIMUM 18 IN. DIAMETER COIR FIBER WATTLE. 2. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. 3. ONLY INSTALL WATTLE(S) TO A HEIGHT SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR SLOPES. 4. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO PERIMETER OF PROJECT AREA. 5. INSTALL A MINIMUM OF ONE FOOT OVERLAP WHERE TYPICAL SECTIONS REQUIRES MORE THAN ONE WATTLE. 6. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH, 7. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. 8. UTILIZE MULCH TO FILL VOIDS BETWEEN ADJOINING FILTER SOCKS PER MANUFACTURERS INSTALLATION REQUIREMENTS, MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE WATTLE. 2. REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. PERIMETER FILTER SOCK FS NC Piedmont Riparian Mix Mix Composition P C 26.0% Sorghastrum nutans, GA Ecotype (tndtangrass, CA Ecotype) J 25.01% Panicum anceps, Eastern Shore A lEcotype (Beaked Panicgrass, Eastern Shore MD Ecotype) 20.0% Elyinus virginicus, PA Ecotype (Virginia Wildrye, PA Ecotype) 20.0% Panicum daridestinum, Tioga (neertongue, Tioga) 4.0% C7ramaecrista fasciculata, FL Ecotype (Partridge Pea, FL Ecotype) 2.0% Hibiscus inoscheutos, Coastal Plain NCEcotrpe (Crimsoneyed Rosenuillow, Coastal Plain NC Ecotype) 1.0% Juncus ef)4isits, Coastal Plain NC Ecotype (Soft Rush, Coastal Plain NC Ecotype) 1.0%111 tennis, NC Ecotype (Path Rush, NC Ecotype) 1.0% Vernorda noveboracensis, PA Ecotype (New York tronweed, PA Ecotype) General Product Information: This mix of grasses and grass -like species will tolerate flooding and provide food and coverfor native game birds in the Piedmont region. Mix formulations are subject to changewithout notice depending on the avaifabitityofexistingand new products. Whilethe formula may change, the guiding phitosophy and function of the mix will not. Item Number: ERNMX-307 Product categories: PRINT I EMAIL I SHARE Riparian Sites H eight! 3.0 - 7.0 Ft Price: $21.13/lb Seeding Rate: 20 Ib pet acre P S Practice Standards and Specifications ■ r 11,11 FA Ll 1:111 11&3= Definition Controlling runoff and erosion on disturbed areas by establishing perennial vegetative cover with seed. Purpose To reduce amsion and decrease sediment yield from disturbed areas, to permanently stabilize such areas in a manner that is econorrlieal, adapts to site conditions, and allows selection of die most appropriate plant materials, Conditions Where fine -graded areas on which permanent, long-lived vegetative cover is Ilse Practice Applies most practical or most effective method of stabilizing the soil. Permanent seeding may also be used on rough -graded areas that will not be brought to final grade for a year or more. Areas to be stabilized wilh permanent vegetation must be seeded or planted within 15 working days or 90 calendar days atierfinal grade is reached, unless temporary stabilization is applied. Introduction 1hiringthe initial phascof all land disturbing projects, the protective layer, either natural or man-made, is removed front the earth's surface. As the protective layer is removed, the resulting bare areas are exposed to the natural forces of rainfall, freezing, thawing, and wind. The result is soil erosion that leads to sediment pollution of North Carolina shearers, rivers, lakes, and estuaries. This design manual presents many altemativestrategies for preventing erosion and reducing sediment loss during the constriction process. Establishment of protective vegetative cover during the Construction project, 1lowcver, is the crucial step in achieving soil stabilization. controlling soil erosion, and preventing sedimentation of waterways. Without a sufficient amount ofroot mat and leaf coverto protect and hold the soil in place. large volumes of soil will be lost and waterways w i I l be degraded long after projects are considered complete. Sections of this practice standard address many of these various situations and set forth selection criteria for the appropriate cover based on purpose and adaptability. Some sediment and erosion control practices recommended in earliereditions ofthe manual mayno langerbe applicable. For example, many popular and commonly used seed and plant varieties have been identified as invasive. Invasive plants are defined as species that aggressively compete with, and displace. locally adapted native plant communities. In select cases where no practical alternative is available, these plants may be considered on a limited basis for soil stabilization, undentanding that the goal is to eliminate the use of all invasive plants in favor of non-invasive native and/or introduced species that will provide an equally acceptabievegetadvecover, Wherethereis no altenatve to the use of invasive species, measures need to be incorporated in the installation and maintenance of these plants to limit their impacts. lire. sltiH 6.11.1 Pruclice Standards and Speelfiviitirf►is 6.10 TS Deli futon Plantwg rapid -growing aonanJ grosses, seal( gams. or legumes to provide I nival, temporary cover for erosion comrol an disawbLd anew Purpose ro tempwarily.srtabilue denuded areas drat will not be brougltt to Final grade for a penod of mare lbaa 21 calendar days, Tultptrnuy seeding cunuol, runofmd cro-don until pI rmanrnl +regeu tian or uther erosion L[intr0l measwte-� con be rstaHi bed. In additum. a pr(tvtdes residue for sail prroteerirsat and seedbed prcparatioa, and reduces prubleuts Of mud and dust produawn from bare soil stu fin es dnnitg comittucdon. Ondtions Where On any ek-seed, unvegeiaied, or sparsely veSCLMed $ail Surface where Practice Applies vegetative Lover Is nI for less than I 'year. Appticauom of this practice include diversions, chills, lemporar±,r scdwicni bosuz. temporary maul hanks, aural topsail SkO&ptl€4 Planning Annual plants. whichspfautMIJgrenvimptdlvand surviweFor only oreesamon, ComijderationS 2"esultabkcforestabl"hinginitialOrlempararywegetativecover. Temporan seeding pi e&r N s dse mu?,rrty of emilwo sediment eonn'o1-SMACtLiv-S suo3 a_x dikes, chvirrsiaricr and tkir iiankw rii`darr�s atilt sulinWnr basin% It can aI-So nadu.:etheurnowuo[enaintc'3rlanceauoci�dwiththesedc�ier�L ptxe+rantpte, WJte trequemy cif sedinieruf basin cleanuuLs will be reduced if watershed arms, outs Ike the active cmLqu ct m lone, are sl6dized. Propersec:dbed preparation, selection afappropriaw sprxixsr etudthe ofgkIL11 iy seed are as unponomi in this Practice as in Pratuce 5.11. P,&rneinerri Seeder . Failure to follow established guidelines and tecarnniandawmis rnreferIN may result in an uwdequate or short-lived siamd OfwegetaU00 chat will not Loralul r'74Elrin. Temporary seeding provides pratmion fornn more Own I year, during whkii Wise permanenk stabdrxation should be lniti�I Speffications Coniptete grading before preparing sea atieds, and Install al necessary efesirm Control practices such as, tl km walerwkvFy and bum&. Mtnlmim sleep slopes beelike they collet seedbed preparation difficult Arid inuease the erasiran hazard lrsoils become LL&mpacted during gmding, laixiett theirs to a depth of &8 Inches using n ripperr Marti%. Or cis LWI plow. SEJEHHED PREPkit-ATION Giaud szrdhed prepwaltim is a,.ienual to suciemful plaai esiablislmwnL A goad seedbed i4 wall -pulverized, loose, allcl uniform Where hydroaeeding megiod-i are used, The surlryce may be Eeii with a retard irregular surface or' largos clods acid stones. Uming-Apply lirneacLvIrdiI soil testrecommendations_ Ifthe pH (=dity I of the soil is not knower as appi bmuon of pound atn, u ttval l aw Aane qt the 9Crs. wab 6-10.1 aintenance Reseed xnd mulch areas where terdlrng emergenu IN poor, OF where erosres anus, a suLvr as passtbla. W nut mow. Protect flan wa is as much a posrihle. PS Areas to be Scedcd: • Till or disc the prepared areas to be seeded to a minimum depth of four (4) inches. Remove stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface- if not incorporated during the soil preparation process, add pH modifier and fertilizers at the rate specified in the soil test report. • Re -compact the area utilizing a cultipacker roller. The finished grade shal l he a smooth even soil surface with a loose. uniFormiy fine texture. All ridges and depressions shall be removed and Filled to provide theapproved surface drainage- Seeding of graded areas is to be done immediately alter finished grades are obtained and seedbed preparation is completed. Areas to be Sprigged, Sodded, and/or Plantctl: • At the time of planting till or disc the prepared areas to a depth of four (4) to six (6) inches below the approved finished grade. Remove all stones larger than three (3) inches on any side, sticks, roots.and other extraneous materials that surface. (f not incorporated in the ripping process, add pH modifier, fertilizer, and other recommended soil amendments. • Re -compact the area utilizing a cuitipacker roller and prepare final grades as described above. Install sprigs, sod and plants as directed immediately after fine grading is complete- Mulch. mat andlor tack as specified. VEGETATION Availability of seed and plant materials is an important consideration of any construction stabilization effort. Throughout ;forth Carolina, climate. economics, construction schedule delays and accelerations, and other factors present difficult challenges in specifying the different vegetation needLd for site stabilization. To help resolve this issue, vegetative stabilization requires consideratian in three categories: ■ ImmediateStabilization -nurse crop varieties(Nnte: temporarytnult:hing may be utilized for immediate stabilization if outlined on the approved plans and construction sequence.) ■ Primary Stdblli7zlivu - plant varieties providing cover up to 3 years with a specified maintenance program w Long Tcrm Slabilization - plant varieties providing piootective cover with maintenance levels sOccled by the owner An adequate ,job in one of these areas dues nut guarantee success in the later phases. Horticultural maintenance must be included in the plans, immediate vegetative cover kill always require additional fertilization, soil amendments, soil tests, overseeding and/or other horticultural maintenance until primary vegetative cover is established. 0 rare of 1 w I I P? tarrsia,cm on r-oarm-textured so its and 2-3 tomvamt on fine- temuredl walso usually sectlietent_ Apply Iunastone uniformly m d incorlrcxate TS into Lhe top 4-�6 inch+`% of sod. S i6 with x pill or 6 or higher rbeed not be limed. FeirtUlzer-[lase Dppli!catidn rates Lin wd tests. When L&s.e am next p0%.- e, apply it 10-11(li-10 gram rerlilimy al. 7t71(]I-I ,000 Jlxlacre_ Bath fertiLuff and lLw should be inoorpoxatbd inim the inp 4-6 tmehes of sled_ If o hydraulic seeder is its do ttoi mix seed and reniltzrr more thaii't 10 nI berate application. Sur dbee roushmirig-Ir recent ttligv operaftons have resulled in 2 ltttfsu surface, addittonaj mughentng way not be required, except to break up tafgy- clods. 11' ratnthdl eaaws Lbe Sgrt`g to bb=me 9$iI or Crosiod, laoscn tt just pried- to ±i�ding by dL+Lldng, raking, Jtarrowing, cn tether suiiabht methtsds Circove or i`urpow slopes s eper tlitllri 3.1 on the centaur before seeding (FIrw1we 6.03, �arx�ctt'++JRcii�Jitrftrlfgl. PLANT SELEC-YIO Selvct an appropriate species or speciem mixtum Itom Table 6. Etta for ceding in late wLnter and early spring, Table 6.1ob for suanrner, and 'Fable 6_I00 for falL In like Mouniams, Oeceritber field January seedinos have piwr II of success. Wbea it ig neMsarti' to plant at these ttnlr�s, use Wet tart mexdaliolari for fall and a sev-Luely twked ntuldL SElEDLN(; Ewrnl w apply wed using a cyelon� seeder ibroarduffi), drill, cult4mcker snider, or hydroseeder_ Useseeilrng roles given in Tables 6_1On-&iOL. Bioadcmt secdft and hydrou�vfing are approprtnte for steep-4ope& wiliffe equrptrtenl e mraot he !I Nand broads tang is not ri'LoF] mend l?d bee w%e of thi. d0liculty to achir:vIng a irnifeirm tlistribulkiki_ Small grRLM sdmuld he pranted net more khan 1 melt deep, and gm." tiled legumes no ttt{trr dean I.'2 inch Btexyk:Lst seed imul lie ctwefed by rutting ar duller drab, m, . and Lhen lightly f mied wn11 Li roller or eu1!lJplt 1ff liyds-os� nlisturt,� shouid include a wood tabor NU, 1ulrrsel utuJcb. M14 .7111NG Thy use dan Iipprnpnute mutdi will help ensue establishment under norll7,ul conditions, and is essential to wing skI under harsh site wridniuru ( Rra nee 6.14, Lfaiehmgj_ Hnrch site s:ondittons LmJutte: t see im in fall for wint&.L:ave'r (wentd fiber mulcheN :are niA cwrm�ertvd nriequale for Ihis use), + sloth steepef thm 3. 1, + cxcessively kl or dry wealhe5 adverse sails I "I10W, focicy, OF high i In clay; or sand), and * ofeas reoeiving colic n ated flow_ If the. I to be mulched i5 subjeetto rarKentrated %vateftlow, v in chnnncJs, anchor rrtulplr with rt wng (Practice 6_14r,lfrrfLLhJH9l Itcv. 51n8 PERMANENT SEEDING NOTES: 1. APPLY AGRICULTURAL LIME AS REQUIRED BY A SOIL SAMPLE ANALYSIS RESULTS OR AT A RATE OF 75 LBS / 1000 SQ FT 2. APPLY COMMERCIAL FERTILIZER AT THE RATE PRESCRIBED BY A SOILS SAMPLE ANALYSIS RESULTS OR AT A RATE OF: 48 LBS / 1000 SQ FT 5-10-10 FERTILIZER 24 LBS / 1000 SQ FT 10-20-20 FERTILIZER 20 LBS / 1000 SQ FT 18-24-6 FERTILIZER 3. PERMANENTLY SEED IN ACCORDANCE WITH NC DEQ EROSION AND SEDIMENT CONTROL MANUAL AND BY THE FOLLOWING RECOMMENDATIONS: DATE: SEED TYPE: SEEDING RATE: AUG. 15 - NOV. 1 TALL FESCUE 300 LBS / AC RYE GRAIN 120 LBS / AC NOV. 1 - MAR. 1 TALL FESCUE 300 LBS / AC ABRUZZI RYE 25 LBS / AC MAR. 1 - APR. 15 TALL FESCUE 300 LBS / AC APR. 15 - JUL. 30 HULLED COMMON BERMUDA GRASS 25 LBS / AC JUL. 1 - AUG.15 TALL FESCUE 300 LBS / AC BROWN TOP MILLET 35 LBS / AC SORGHUM 30 LBS / AC SUDAN HYBRIDS 30 LBS / AC 4. MULCH PER THE MULCHING DETAIL PROVIDED AND AT A MINIMUM OF 2 TONS OF STRAW PER ACRE. MULCH AT A GREATER RATE DURING JANUARY - MARCH AS NEEDED FOR PROJECT SITE CONDITIONS. 5. STREAM 50 FOOT RIPARIAN BUFFER AREAS ARE TO BE PERMANENTLY SEEDED WITH NATIVE RIPARIAN MIX AS SPECIFIED. SERICIA LESPEDEZA Table 6.193Seeding mixture Temporary Seeding ding Species Rate jlhlacre) r Recommendations for Late Rye (grain 120 BEING AN INVASIVE Winter and Early Spring Pareaantand Coastal Ptain. SPECIES SHALL BE Korean in Mountains) 50 , SUBSTITUTED FOR Dmlt annual kmpedeza when duration of teowary cover Is oat to p TS extend beyondJune ALTERNATIVE NATIVE Seeding dates Mountains -Above 2500 teet reb. 15. May 15 SPECIES SUCH AS Below mafeet Feb. I- May 1 Plednl-silo. 1 -May May 1 S W I T C H G RAS S Coastal Plaln-Dec_ 1 -Apr. 15 ( PAN I C U M Solt amendments Follow recommendations of call tests w apply 2.000 Wacre ground V I RGATU M ) agricultural limestone and 7501blacre 10.10.10 rerlfllzer. o irtulch SPLITBEARD Apply 4,XOIklacreslravr.Anchor straw byt ddngwilhasphalt. netting. or a mulch anchoring tod. A disk wish bladea wl nearly stratghl can be B L U E ST E M used as a mulch anchodng tool. (AN DROPOGONTERNARI US), Maintenance ReferulLmifgrowthIsnot hAyad"irate_ Reseed, refer91 zeiandmulch gEGGARLICE Immediately forlowing erosion or other damage. (DESMODIUM SPP.), Table 6. lab Temporary Seeding Recommendations for Summer TS Seeding mixture Spaces Rate (I Nacre) German nlrklEl 40 In the Piedmont and Mountains, a small-slemmed Sudangrass may by substituted at a rale of 50 Iblaere_ Seeding dates Mountains -May 15 • Aug. 15 Piedmont --May 1 -Aug. 15 Coastal Plain -Apr. 15 -Aug. 15 Sail amendmerds Fallow recommendations of loll tests or apply 2,000 (Nacre ground agricultural Ilmestane and 7501blaue 10.10-1fl fertilizer_ Mulch Apply4,0001hleae straw_ Anchor strawby tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly sh'Mghl can be used as a mulch anchoring tool_ Maintenance Referlilize if growth is not fully adequate. Reseed, refertlllze and mulch Immediately following erasion at alher damage. Table 6.10c Seeding mixture Temporary Seeding Species Rate Ilblaeve) Recommendations for Fall Rye (grain) 120 Seeding dates Mountains Aug 15 • Dec.15 T^ `J Coastal Plain and Piedmont -,Aug. 15 -[Sec. 30 Soil amandments Follow soil tests or appty 2,000 Iblacre ground agriaullural limestane and 1,000lblacre 10-10.10 fervIzer. Mulch Apply4.0001blecm straw. Anchor straw by tacking wM asphalt, netting, or a mulch anchoring tool_ A disk with blades set nearly mWghl can be used as a mulch anchoring tool Maintenance Repair and referdize damaged areas immediately. Top -dress with 50 Iblar:re of nitrogen In Marco. If it Is necessary to extent temporary caner beyond June 15, overseed with 50 Iblacre Kobe (Piedmont and Costal Plain) or Korean (Mountarns) lespedeza in Iata February or early March. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL DETAILS DRAWING BY KAD DATE INITIALS REC & STD I I r6l Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 PARTRIDGE PEA (CHAMAECRISTA FASC I CU LATA) 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01 /18/2021 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 16 OF 18 ISCALE AS SHOWN WIG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE502 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER TpS1 M❑ Practice Standards and Specifications Construction MATERIALS Specifications Determine whether the l quality anhd quantity of available topsoil justifies selective handling. Qua tty topsoil as the following charactensttcs. Texture -loam sand loam and silt loam are best; sand clay loam silty clay Y � Y Y � tY Y loam, clay loam, and loamy sand are fair. Do not use heavy clay and organic soils such as peat or muck as topsoil Organic matter content -(sometimes referred to as "humic matter") should be greater than 1.5% by weight. Acidity -pH should be greater than 3.6 before liming, and liming is required if it is less than 6.0. Soluble salts -should be less than 500 ppm. Sodium -sodium adsorption ratio should be less than 12. The depth of material meeting the above qualifications should be at least 2 inches. Soil factors such as rock fragments, slope, depth to water table, and layer thickness affect the ease of excavation and spreading of topsoil. Generally, the upper part of the soil, which is richest in organic matter, is most desirable; however, material excavated from deeper layers may be worth storing if it meets the other criteria listed above. Organic soils such as mucks and peats do not make good topsoil. They can be identified by their extremely light weight when dry. STRIPPING Strip topsoil only from those areas that will be disturbed by excavation, filling, roadbuilding, or compaction by equipment. A 4-6 inch stripping depth is common, but depth varies depending on the site. Determine depth of stripping by taking soil cores at several locations within each area to be stripped. Topsoil depth generally varies along a gradient from hilltop to toe of the slope. Put sediment basins, diversions, and other controls into place before stripping. STOCKPILING Select stockpile location to avoid slopes, natural drainageways, and traffic routes. On large sites, respreading is easier and more economical when topsoil is stockpiled in small piles located near areas where they will be used. Sediment barriers -Use sediment fences or other barriers where necessary to retain sediment. Temporary seeding -Protect topsoil stockpiles by temporarily seeding as soon as possible, no more than 21 calendar days after the formation of the stockpile (Practice 6.10, Temporary Seeding). Permanent vegetation -If stockpiles will not be used within 90 days they must be stabilized with permanent vegetation to control erosion and weed growth (Practice 6.11, Permanent Seeding). TpS1 �0_ 6.04.1 6.04.2 DC I SITE PREPARATION Before spreading topsoil, establish erosion and sedimentation control practices such as diversions, berms, dikes, waterways, and sediment basins. Grading -Maintain grades on the areas to be topsoiled according to the approved plan and do not alter them by adding topsoil. Limit of subsoil -Where the pH of the existing subsoil is 6.0 or less, or the soil is composed of heavy clays, incorporate agricultural limestone in amounts recommended by soil tests or specified for the seeding mixture to be used (Practice 6.11, Permanent Seeding). Incorporate lime to a depth of at least 2 inches by disking. Roughening -Immediately prior to spreading the topsoil, loosen the subgrade by disking or scarifying to a depth of at least 4 inches, to ensure bonding of the topsoil and subsoil. If no amendments have been incorporated, loosen the soil to a depth of at least 6 inches before spreading topsoil. SPREADING TOPSOIL Uniformly distribute topsoil to a minimum compacted depth of 2 inches on 3:1 slopes and 4 inches on flatter slopes. To determine the volume of topsoil required for application to various depths, use Table 6.04a. Do not spread topsoil while it is frozen or muddy or when the subgrade is wet or frozen. Correct any irregularities in the surface that result from topsoiling or other operations to prevent the formation of depressions or water pockets. Compact the topsoil enough to ensure good contact with the underlying soil, but avoid excessive compaction, as it increases runoff and inhibits seed germination. Light packing with a roller is recommended where high - maintenance turf is to be established. Table 6.04a Cubic Yards of Topsoil Required for Application to Various Depths Definition Application of a protective blanket of straw or other plant residue, gravel, or synthetic material to the soil surface. Construction Select a material based on site and practice requirements, availability of Specifications material, labor, and equipment. Table 6.14a lists commonly used mulches and some alternatives. Before mulching, complete the required grading, install sediment control practices, and prepare the seedbed. Apply seed before mulching except in the following cases: • Seed is applied as part of a hydroseeder slurry containing wood fiber mulch. • A hydroseeder slurry is applied over straw. APPLICATION OF ORGANIC MULCH Organic mulches are effective where they can be tacked securely to the surface. Material and specifications are given in Table 6.14a. Spread mulch uniformly by hand, or with a mulch blower. When spreading straw mulch by hand, divide the area to be mulched into sections of approximately 1,000 ft, and place 70-90 lb of straw ( 1 1/2 to 2 bales) in each section to facilitate uniform distribution. After spreading mulch, no more than 25% of the ground surface should be visible. In hydroseeding operations a green dye, added to the slurry, assures a uniform application. ANCHORING ORGANIC MULCH Straw mulch must be anchored immediately after spreading. The following methods of anchoring mulch may be used: Mulch anchoring tool -A tractor -drawn implement designed to punch mulch into the soil, a mulch anchoring tool provides maximum erosion control with straw. A regular farm disk, weighted and set nearly straight, may substitute, but will not do a job comparable to the mulch anchoring tool. The disk should not be sharp enough to cut the straw. These methods are limited to slopes no steeper than 3: 1, where equipment can operate safely. Operate machinery on the contour. Liquid mulch binders -Application of liquid mulch binders and tackifiers should be heaviest at the edges of areas and at crests of ridges and banks, to resist wind. Binder should be applied uniformly to the rest of the area. Binders may be applied after mulch is spread, or may be sprayed into the mulch as it is being blown onto the soil. Applying straw and binder together is the most effective method. Liquid binders include asphalt and an array of commercially available synthetic binders. Emulsified asphalt is the most commonly used mulch binder. Any type thin enough to be blown from spray equipment is satisfactory. Asphalt is classified according to the time it takes to cure. Rapid setting (RS or CRS designation) is formulated for curing in less than 24 hours, even during periods of high humidity; it is best used in spring and fall. Medium setting (MS or CMS) is formulated for curing within 24 to 48 hours, and slow setting (SS or CSS) is formulated for use during hot, dry weather, requiring 48 hours or more curing time. 6.14.1 M❑ 6.14.2 Depth Per 1,000 Per (Inches) Sq. ft. Acre 1 3.1 134 2 6.2 268 3 9.3 403 4 12.4 536 5 15.5 670 6 18.6 804 On slopes and areas that will not be mowed, the surface may be left rough after spreading topsoil. A disk may be used to promote bonding at the interface between the topsoil and subsoil. After topsoil application, follow procedures for seedbed preparation, taking care to avoid excessive mixing of topsoil into the subsoil. Practice Standards and Specifications 6.84 DUST CONTROL DC Construction Vegetative cover -For disturbed areas not subject to traffic, vegetation Specifications p provides the most practical method of dust control (References: Surface Stabilization). Mulch (including gravel mulch) --When properly applied, mulch offers a fast, effective means of controlling dust. Spray -on adhesive -Examples of spray -on adhesives for use on mineral soils are presented in Table 6.84a. Table 6.84a Water Type of Apply Spray -on Adhesive for Dust Dilution Nozzle Gallons/Acre Control on Mineral Soil Anionic asphalt emulsion 7:1 Coarse Spray 1,200 Latex emulsion 12.5:1 Fine Spray 235 Resin in water 4:1 Fine Spray 300 Calcium chloride may be applied by mechanical spreader as loose, dry granules or flakes at a rate that keeps the surface moist, but not so high as to cause water pollution or plant damage. Sprinkling -The site may be sprinkled until the surface is wet. Sprinkling is especially effective for dust control on haul roads and other traffic routes. Stone used to stabilize construction roads can also be effective for dust control. Barriers -A board fence, wind fence, sediment fence, or similar barrier can control air currents and blowing soil. Place barriers perpendicular to prevailing air currents at intervals about 15 times the barrier height. Where dust is a known problem, preserve windbreak vegetation. Tillage -Deep plow large open undisturbed areas and bring clods to the surface. This is a temporary emergency measure that can be used as soon as soil blowing starts. Begin plowing on the windward edge of the site. Maintenance Maintain dust control measures through dry weather periods until all disturbed areas have been stabilized. 6.84.1 WATTLES TO ABUT SPAN BRIDGE. USE 1 FOOT o, OVERLAP ON ADJOINING \� o'STREAM WATTLES CHANNEL/ TEMPORARY SPAN BRIDGE CROSSING SURFACE FLOW DIVERSION STREAM t CHANNEL MATTING WATTLES TO ABUT SPAN BRIDGE PERSPECTIVE VIEW SURFACE FLOW DIVERSION FILTRATION GEOTEXTILE MATTING APPROACH TEMPORARY SPAN BRIDGE CROSSING I~ ORIGINAL STREAMBANK INSTALL WATTLE DOWN -SLOPE OF SURFACE FLOW DIVERSION MATTING APPROACH STREAM BED LONGITUDINAL SECTION Apply asphalt at 0.10 gallons per square yard (10 gal/1,000 ft2). Heavier applications cause straw to "perch" over rills. 3. To secure the net, bury the upslope end in a slot or trench no less than 6 M inches deep, cover with soil, and tamp firmly as shown in Figure 6.14a. Staple In traffic areas, uncured asphalt can be picked up on shoes and cause damage the net every 12 inches across the top end and every 3 ft around the edges and to rugs, clothing etc. Use types RS or CRS to minimize such problems. bottom. Where 2 strips of net are laid side by side, the adjacent edges should be overlapped 3 inches and stapled together. Each strip of netting should also Synthetic binders such as Petroset, Terratack, and Aerospray may be used, as be stapled down the center, every 3 ft. Do not stretch the net when applying recommended by the manufacturer, to anchor mulch. These are expensive, staples. and therefore usually used in small areas or in residential areas where asphalt may be a problem (Use of trade names does not constitute an endorsement). 4. To join two strips, cut a trench to anchor the end of the new net. Overlap the end of the previous roll 18 inches, as shown in Figure 6.14a, and staple every Mulch nettings-Lightweight plastic, cotton, jute, wire, or paper nets may be 12 inches just below the anchor slot. stapled over the mulch according to the manufacturer's recommendations (see "Nets and Mats" below). Peg and twine -Because it is labor-intensive, this method is feasible only in small areas where other methods cannot be used. Drive 8-10 inch wooden pegs to within 3 inches of the soil surface, every 4 feet in all directions. Stakes may be driven before or after straw is spread. Secure mulch by stretching twine between pegs in a criss-cross-within-a-square pattern. Turn twine two or more times around each peg. Twine may be tightened over the mulch by driving pegs further into the ground. Vegetation -Rye (grain) may be used to anchor mulch in fall plantings, and German millet in spring. Broadcast at 15 lb/acre before applying mulch. CHEMICAL MULCHES Chemical mulches may be effective for soil stabilization if used between May 1 and June 15, or Sept. 15 and Oct. 15, provided that they are used on slopes no steeper than 4: 1, and that proper seedbed preparation has been accomplished, including surface roughening where required. In channels, roll out strips of netting parallel to the Chemical mulches may be used to bind other mulches, or with wood fiber in a direction of flow and over the protective mulch. hydroseeded slurry at any time. Follow the manufacturer's recommendations for application. NETS AND MATS Nets alone generally provide little moisture conservation benefits and only 1 limited erosion protection. Therefore, they are usually used in conjunction I II with an organic mulch such as straw. �i� (� Anchor netting in I��J�\Il � Except when wood fiber slurry is used, netting should always be installed over 12-inch trench the mulch. Wood fiber may be sprayed on top of an installed net. 12-inch , overlap Join strips by anchorinc Mats, including "excelsior" (wood fiber) blankets, are considered protective Figure 6.14a Installation of netting and matting (modified from Va. Div. of Forestry). and overlapping. mulches and may be used alone, on erodible soils, and during all times of the year. Place the matting in firm contact with the soil, and staple securely. Maintenance Inspect all mulches periodically, and after rainstorms to check for rill erosion, dislocation or failure. Where erosion is observed, apply additional mulch. If INSTALLATION OF NETTING AND MATTING washout occurs, repair the slope grade, reseed and reinstall mulch. Continue Products designed to control erosion should be installed in accordance with inspections until vegetation is firmly established. manufacturer's instructions. Any mat or blanket -type product used as a protective mulch should provide cover of at least 30% of the surface where it is applied. Installation is illustrated in Figure 6.14a. 1. Apply lime, fertilizer, and seed before laying the net or mat. 2. Start laying the net from the top of the channel or slope, and unroll it down the grade. Allow netting to lay loosely on the soil or mulch cover but without wrinkles -do not stretch. 6.14.3 FILTRATION GEOTEXTILE Table 6.14a INSTALLATION NOTES: 1. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS, BED, AND APPROACH TO A MINIMUM. 2. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE STREAM. 3. KEEP STREAM CROSSINGS AT RIGHT ANGLES TO THE STREAM FLOW. 4. ALIGN ROAD APPROACH WITH THE CENTER LINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FEET. RAISE BRIDGE ABUTMENTS A MINIMUM OF 1 FOOT ABOVE THE ADJOINING APPROACH SECTIONS TO PREVENT EROSION FROM SURFACE RUNOFF AND ALLOW FLOOD FLOWS TO PASS AROUND STRUCTURE. 5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER, INCLUDING PLANNED OVERFLOW AREAS, WITH RIPRAP OR OTHER SUITABLE MEANS IF DESIGN VELOCITY EXCEEDS THE ALLOWABLE FOR THE IN -PLACE SOIL. 6. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO ITS ORIGINAL CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. 7. ANY IN -STREAM SEDIMENT CONTROL MEASURES MUST BE REMOVED UPON STABILIZATION OF THE AREA. MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE PERIMETER WATTLES OR ONE-HALF CAPACITY OF THE TRAPS. 2. REPLACE OR CLEAN THE WATTLES AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE STAKES AND STAPLES TO ENSURE THAT THE WATTLES REMAIN. SECURELY ANCHORED AFTER RAIN EVENTS OR HIGH WATER CONDITIONS. 4. MONITOR DAILY TO SUPPLEMENT MATTING APPROACHES TO ENSURE PROPER FUNCTIONALITY. 5. CLEAN ANY ERODIBLE MATERIAL TRACKED ONTO THE APPROACHES OR SPAN IMMEDIATELY. 6. MATS TO BE EXTENDED 50' OUTSIDE TOP OF BANK UNLESS RESTRICTED BY FIELD CONDITIONS. 7. CURLEX II WITH FIBERNET, OR APPROVED EQUIVALENT, RECP SHALL BE UTILIZED ALONG STREAM BANKS DURING STABILIZATION EXTENDING TO 50 FOOT RESOURCE BUFFER LIMITS. 8. PROTECT ENTIRE 50 FOOT BUFFER WITH TIMBER MATS, GEOTEXTILE, AND SIDE BOARDS FROM SILT FENCE TO SILT FENCE ACROSS THE BUFFER. SURFACE FLOW DIVERSION TEMPORARY STREAM CROSSING VIA TIMBER SPAN BRIDGE TSC MMulching Materials and Application Rates Material Rate Per Acre Quality Notes rganic Mulches Straw 1-2 tons Dry, unchopped, Should come from wheat or oats; unweathered; avoid spread by hand or machine; must weeds. be tacked down. Wood chips 5-6 tons Air dry Treat with 12 Ibs nitrogen/ton. Apply with mulch blower, chip handler, or by hand. Not for use in fine turf. Wood fiber 0.5-1 tons Also referred to as wood cellulose. May be hydroseeded. Do not use in hot, dry weather. Bark 35 cubic yards Air dry, shredded or Apply with mulch blower, chip hammer -milled, or chips. handler, or by hand. Do not use asphalt tack. Corn stalks 4-6 tons Cut or shredded in 4-6 Apply with mulch blower or by hand. in. lengths. Not for use in fine turf. Sericea 1-3 tons Green or dry; should lespedeza contain mature seed. seed -bearing stems Nets and Mats' Jute net Cover area Heavy, uniform; woven Withstands waterflow. Best when of single jute yarn. used with organic mulch. Fiberglass net Cover area Withstands waterflow. Best when used with organic mulch. Excelsior Cover area Withstands waterflow. (wood fiber) mat Fiberglass roving 0.5-1 tons Continuous fibers of Apply with a compressed air ejector. drawn glass bound Tack with emulsified asphalt at a together with a non -toxic rate of 25-35 gal/1,000 sq ft. agent. Chemical Stabilizers2 Aquatain follow Not beneficial to plant growth. Aerospray manufacturer's Curasol AK specifications Petroset SIB Terra Tack Crust 500 Genaqua 743 M-145 'Refer to Practice No. 6.30, Grass Lined Channels. 2Use of trade names does not imply endorsement of product. 6.14.2 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL DETAILS DRAWING BY KAD DATE INITIALS REC & STD Natural Gas STATION ID DATE INITIALS PRINCIPAL COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A - DATE INITIALS CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 17 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE503 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER ENLARGED LIVE STAKE CROSS SECTION ° ol % o e a o o ° ° ° e ° °8 e °o e8°, ° ° ° ° ° °°° ° ° e ° ° ° ° ° °,fo}°o ° ° t °-e a ° ee HERBACEOUS SEEDING, ° ° 0' ° °° 0o ° °mo °%°8°$ 00 oaa o°4 °°°°Q°°'oa` ° ®a ° MID -STORY, AND CANOPY °° °°° °°°o o °e l j ° 8° a 'te . e °°'°'°•° o86 SPECIES TO BE PLANTED ° r, ,° aaeal avvP ABOVE TOP OF BANK TOP OF BANK ° °g ° . >' ee ° a�a�aaWv, a^vv o a° °°k �v v " �:' as°v@v a6v°vv' `l� a sv ° Qe vV v y' 'Al"141 C '/v�pgq 4 I- DISTANCE VARIES MOIST SOIL BACKFILL f WETLAND MEADOW ERNMX, ROUNDSTONE, OR SIMILAR TO BE BROADCAST SEEDED O 000 EROSION CONTROL 0 O O 0 FABRIC AND SEEDING 0 O O 0 0 O PREPARED PHASE 1: ESTABLISH PERIMETER MEASURES SUCH AS DOUBLE ROW SILT TRENCH FENCE AT THE LOCATION PRACTICAL PER THE EROSION AND SEDIMENT CONTROL PLAN FOR EFFECTIVE PROTECTION AT LOCATION OF WORK. O 00 STREAM FLOW 0 O O 0 PHASE 2: MAINTAIN BMPs THROUGHOUT PHASE SO THAT THEY REMAIN O EFFECTIVE. PROVIDE RECP (PER DETAIL) AS PRESCRIBED OR IF NEED IS IDENTIFIED. 0 PHASE 3: REMOVE TEMPORARY BMPs, STRAW, MULCH, SEED WITH 0 o APPROPRIATE WETLAND OR RIPARIAN SEED MIX (SEE PS DETAIL), INSTALL LIVE WILLOW STAKES AS SHOWN), AND INSTALL OTHER MEASURES AS 1 NECESSARY TO ACHIEVE FINAL STABILIZATION. TOE PROTECTIO r f 6 \ `-LIVE STAKE (2 FT O.C. SPACING) AS REQUIRED / DEAD ST T STAKE SPECIFIED IN PLAN GEOTEXTILE FABRIC AS REQUIRED/ SPECIFIED IN PLANS STREAM BUFFER RESTORATION NOTES: 1. BUFFER REPLANTING: RESTORATION OF TEMPORARY RIPARIAN BUFFER IMPACTS WILL BE CONDUCTED, WHERE INDICATED, BY RE-ESTABLISHING NATIVE SPECIES GRASSES, SHRUBS AND TREE LIVE STAKES. 2. ESTABLISH THE VEGETATION ACCORDING TO THE GROWERS ESTABLISHED TYPICAL SEED RATES. AS REQUIRED, CALIBRATE SEEDING EQUIPMENT TO ENSURE REQUIRED APPLICATION RATES. SEEDING METHOD SHALL BE IN ACCORDANCE WITH GROWER'S RECOMMENDATIONS. 3. SEED SHALL BE PLANTED IN PREPARED WEED -FREE SEEDBED. REMOVE ALL INVASIVE SPECIES, LOOSEN SOIL AND THATCH. WEED CONTROL EFFORTS SHOULD BEGIN PRIOR TO PLANTING AND MAY REQUIRE MULTIPLE APPLICATIONS. USE AQUATIC HERBICIDES OR TILLAGE TO ELIMINATE COMPETING VEGETATION. CONTACT THE LOCAL EXTENSION OFFICE FOR SPECIFIC HERBICIDES TO USE AND APPLY ALL HERBICIDES ACCORDING TO LABEL. 4. LIME AND FERTILIZERS SHOULD NOT BE APPLIED TO NATIVE GRASSES AT ESTABLISHMENT UNLESS INSUFFICIENT SOIL FERTILITY IS INDICATED BY SOIL TESTING. WHERE TOPSOIL HAS BEEN REMOVED OR DEPLETED, ORGANIC MATTER SHALL BE ADDED. 5. BE CAREFUL NOT TO BLEND SEED OF VARYING SIZE, SHAPE AND WEIGHT. 6. SEED SHALL BE PLANTED AT A PLANTING DEPTH OF NO MORE THAN %4', UNLESS OTHERWISE DIRECTED. 7. FIRM SOIL TO ACHIEVE GOOD SEED TO SOIL CONTACT. 8. HAND CRIMP MULCH OVER SEED BEFORE INSTALLING RECP. V STREAMBANK STABILIZATION' TYPICAL CROSS SECTION 4A INSTALLATION NOTES: 1. FOR EASIER INSTALLATION, LOWER WATER LEVEL A TO LEVEL B BEFORE INSTALLATION. 2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), SEE STREAM BUFFER RESTORATION / RE -VEGETATION NOTES. 3. BEGIN AT THE TOP OF THE SHORELINE BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12"(30CM) OF RECPS EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE RECPS. 4. ROLL RECPS EITHER (A) DOWN THE SHORELINE FOR LONG BANKS (TOP TO BOTTOM) OR (B) HORIZONTALLY ACROSS THE SHORELINE SLOPE. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. 5. THE EDGES OF ALL HORIZONTAL AND VERTICAL SEAMS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5-12.5CM) OVERLAP. SEAMS SHALL OVERLAP AND SHINGLED IN THE PREDOMINANT FLOW DIRECTION. 6. THE EDGES OF THE RECPS AT OR BELOW NORMAL WATER LEVEL MUST BE ANCHORED BY PLACING THE RECP'S IN A 12"(30CM) DEEP X 6"(15CM) WIDE ANCHOR TRENCH. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART IN THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 7. REFER TO BILL OF MATERIAL / QUANTITIES SHEET FOR RECPS AND SEEDING SPECIFICATION. 8. MATTING TO BE COIR FIBER GREATER THAN 700 GRAM. RECP ROLLED EROSION CONTROL PRODUCT TYPE SF-2 SILT FENCE INSIDE EASEMENT PUMP INTAKE SUM FLEXIBLE PIPING PLACED AWAY FROM ". . EQUIPMENT AND . VEHICLES JPUMP (SEE TABLE -FOR MINIMUM DESIGP -DEW ERIN PUM. (S TAB FO INIMUM DESIGN) I FLOW BARRIER WITH SANDBAGS (SEE TABLE FOR SPECIFIC 1 MATERIALS) ORI INAL ST CM ED . TYPE SF-2 SILT O� FENCE INSIDE LO. EASEMENT O . FLOW BARRIER /SC PROVIDE TEMPORARY ROCK OR OTHER MATERIAL FOR DISCHARGE ENERGY DISSIPATION AT OUTLET. ATERIAL TO BE REMOVED / RESTORED PRIOR TO PROJECT COMPLETION. REFERENCE NCDEQ EROSION CONTROL MANUAL FOR OUTLET STABILIZATION OPTIONS. CRS CONSTRUCTION ROAD STABILIZATION MACHINE CLEARING ONLY AREA 20'-0" DISTURBED AREA FOR ACCESS ROAD CLEARING AND GRUBBING AREA STREAM DIVERSION PUMP -AROUND NOTES: 1. PUMP AROUND DEVICES SHALL NOT BE IN OPERATION FOR GREATER THAN 48 HOURS AND WEATHER SHALL BE MONITORED SO THAT DEVICES CAN BE REMOVED PRIOR TO LARGE STORM EVENTS. 2. PUMP SHALL BE SIZED BY THE CONTRACTOR TO ADEQUATELY HANDLE BASEFLOW AND BANKFULL FLOW. 3. NATIVE BED MATERIAL WITHIN STREAM WORKSPACE SHALL BE PRESERVED ON -SITE FOR REPLACEMENT AFTER PIPELINE INSTALLATION IS COMPLETE. 4. REFERENCE NC EROSION CONTROL DESIGN MANUAL AND NC DOT BMPS FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES FOR GUIDANCE ON INSTALLATION, MAINTENANCE, AND REMOVAL OF BYPASS PUMP. 5. ALL WORK COMPLETED WITHIN THE STREAM CHANNEL SHALL BE COMPLETED IN THE "DRY", UNLESS PERMIT ALLOWS FOR INSTREAM WORK WITH ACTIVE FLOW. 6. IMPERVIOUS DIKES SHALL CONSIST OF SANDBAGS AND GEOTEXTILE FABRIC, AS NECESSARY. 7. INSTALLATION, MAINTENANCE, AND REMOVAL SHALL BE AT THE DIRECTION OF THE ON -SITE ENVIRONMENTAL INSPECTOR. THE ENVIRONMENTAL INSPECTOR SHALL DIRECT THE REMOVAL OF THE BYPASS PUMP AND CONTAINMENT OF SEDIMENT DURING THE FIRST "SLUG" OF WATER THAT IS RELEASED AFTER REMOVAL. A TURBIDITY CURTAIN MAY BE INSTALLED AT THE DISCRETION OF THE ENVIRONMENTAL INSPECTOR. THE ENVIRONMENTAL INSPECTOR ALSO SHALL ADVISE ON DISCHARGE LOCATION AND OUTLET PROTECTION MEASURES. INSTALLATION: 8. SETUP BYPASS PUMP AND TEMPORARY PUMP AROUND PIPING. PLACE OUTLET OF TEMPORARY PIPE TO MINIMIZE EROSION AT DISCHARGE SITE OR PROVIDE TEMPORARY ENERGY DISSIPATION MEASURES. FIRMLY ANCHOR PUMP AND PIPING. 9. CONSTRUCT OUTLET PROTECTION IF NEEDED PER THE NC EROSION CONTROL DESIGN MANUAL. 10. CONSTRUCT IMPERVIOUS DIKE UPSTREAM OF WORK AREA TO IMPOUND WATER FOR BYPASS PUMP INTAKE. USE A FLOATING INTAKE FOR PUMPS WHERE POSSIBLE. 11. BEGIN OPERATING PUMP CONCURRENTLY ONCE UPSTREAM IMPERVIOUS DIKE HAS BEEN INSTALLED. 12. CONSTRUCT AN IMPERVIOUS DIKE DOWNSTREAM, IF NECESSARY, TO ISOLATE WORK AREA. 13. CHECK OPERATION OF PUMP AND PIPING SYSTEM. MAINTENANCE: 14. ROUTINELY INSPECT BYPASS PUMP AND TEMPORARY PIPING TO ENSURE PROPER OPERATION. 15. INSPECT IMPERVIOUS DIKE FOR LEAKS AND REPAIR ANY DAMAGE. 16. INSPECT DISCHARGE POINT FOR EROSION. 17. ENSURE FLOW IS ADEQUATELY DIVERTED THROUGH PIPE. REMOVAL: 18. REMOVAL SHALL BE COMPLETED DURING LOW FLOW CONDITIONS. 19. TURN OFF BYPASS PUMP. IMPERVIOUS DIKE SHOULD BE CONSTRUCTED WITH ADDITIONAL CAPACITY TO FACILITATE THE REMOVAL PROCESS. 20. REMOVE THE DOWNSTREAM IMPERVIOUS DIKE 21. REPLACE ALL INSTREAM CHANNEL MATERIAL, IF IT WAS REMOVED DURING PIPELINE INSTALLATION. 22. REMOVE UPSTREAM IMPERVIOUS DIKE SLOWLY (ONE LAYER OF SANDBAGS AT A TIME) TO GENTLY RETURN THE STREAM TO NORMAL FLOW CONDITIONS. 23. REMOVE ALL PUMP AND PIPING MATERIALS FROM WORKSPACE. 24. HAVE THE ENVIRONMENTAL INSPECTOR ON -SITE TO ADVISE ON NECESSITY OF DOWNSTREAM INSTALLATION OF TURBIDITY CURTAIN OR OTHER MEASURES TO MANAGE SEDIMENT MIGRATION. SD STREAM DIVERSION VIA PUMP AROUND 4 INCH PER FOOT (2%) SIDE SLOPE 14'-0" (TYP. FOR ONE-WAY TRAFFIC) (TYPICAL) TEMPORARY ACCESS ROAD 7'-0" 2" EXISTING GRADE INSTALLATION NOTES: 1. UTILIZE EXISTING ACCESS ROADS, WHERE APPLICABLE, AND MAINTAIN IN -KIND WITH EXISTING SUBSTRATE, DITCH LINE, AND DIMENSIONS. 2. USE 6" OF COMPACTED ABC STONE AS SHOWN ON PLANS. STONE TYPICALLY INSTALLED ON SLOPES OF 20% OR MORE. MAINTENANCE NOTES: 1. MONITOR TO SUPPLEMENT STONE OR BLADE TO MAINTAIN UNIFORM RIDING SURFACE. 2. INSPECT CONSTRUCTION ROADS AND PARKING AREAS PERIODICALLY FOR CONDITION OF SURFACE. TOP -DRESS WITH NEW GRAVEL AS NEEDED. CHECK ROAD DITCHES AND OTHER SEEDED AREAS FOR EROSION AND SEDIMENTATION AFTER RUNOFF -PRODUCING RAINS. MAINTAIN ALL VEGETATION IN A HEALTHY, VIGOROUS CONDITION. SEDIMENT -PRODUCING AREAS SHOULD BE TREATED IMMEDIATELY. MACHINE CLEARING ONLY AREA COMPACTED SOIL --z FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 1 07/08/2020 ISSUED FOR 100% REVIEW KAD WFB AS AREA CODE - DATE INITIALS REGIONAL DUKE MARSHALL STREAM RESTORATION Piedmont2 07/29/2020 ISSUED FOR PERMITTING KAD WFB AS ACCOUNT NUMBER - °ATE NITIALS ENGINEER PROJECT NUMBER 1190706 DATE INITIALS MGR TECH EROSION AND SEDIMENT CONTROL DETAILS DRAWING BY KAD DATE INITIALS REC & STD r6l Natural Gas DATE INITIALS COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP. L I N C O L N COUNTY NORTH CA RO L I N A STATION ID - DATE INITIALS PRINCIPAL CORP. OFFICE 4720 PIEDMONT ROW DRIVE 7 CHECKER INITIAL WFB ENGINEER CHARLOTTE, NC 28210 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: MR. JASON A. BROWN PHONE: (704) 731-4681 ENGINEER'S REPRESENTATIVE: JEREMY DEAN CPESC NO.: 00004207 EXPIRES: 01/18/2021 14 Know what's below. Call before you dig. ® Dial 811 Or Call 800-282-7411 NOT FOR CONSTRUCTION REF. DWG(S) HEET(S) 18 OF 18 ISCALE AS SHOWN WG DATE 04/29/2020 SUPERSEDED DRAWING NUMBER REVISION CE504 2 DISCIPLINE / RESOURCE CENTER / LINE NUMBER