Loading...
HomeMy WebLinkAboutNCC200099_Notice of Termination_20201026Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 10/26/2020 7:16:38 AM (NOT Submittal) Approve by Georgoulias, Bethany 10/26/2020 1:36:46 PM (NOT Request Review- NCC200099) * Permittee uploaded COC instead of NOT Certification form with the submittal but provided it via e- mail. • The task was assigned to Georgoulias, Bethany. The due date is: October 29, 2020 5:00 PM 10/26/2020 7:16 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200099 Coverage (COC) Enter the Certificate of Coverage Nmber No.* Information associated with this permit Project Name HF Lee 1982 Ash Basin Haul Road Improvements Address 1677 Old Smithfield Road, Goldsboro, NC County Wayne Latitude 35.0000 Longitude -78.0000 Permittee Listed Duke Energy Legally Responsible Issa Zarzar Individual NC Reference No. NCG01-2020-0099 E&SC Plan ID Wayne-2019-032 Original NOI 20307 Tracking No. Date COC Issued 1/10/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * O Mistake or Invalid Coverage r Other Addional Mxe inforrration about the basis of this request, if needed. Explanation Supporting upload Supporting Docurrentation if applicable. Documentation Mist beFDFforrrat Project Close-out Information: Final Close-out 10/20/2020 Inspection Approval Project Close-out 20201020 sed insp report WAYNE-2019-032 Approval 169.43KB HFLee1982 AshBasin.pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Issa J. Zarzar Title * GM - CCP Central Carolina Projects Organization* Duke Energy - Coal Combustion Products Date * 10/26/2020 Email for Issa.zarzar@duke-energy.com Confirmation * Contact Telephone* 919-812-0446 NOT Certification Certificate of Coverage ash basin haul road.pdf 40.72KB Form Mast be PDF Forrrst Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Original Permittee CCd on Wification BTails Email issa.zarzar@duke-energy.com Original Site Contact CCd on Notificaiton Bmils Email bill.forster@duke-energy.com