Loading...
HomeMy WebLinkAboutWQ0041884_Application (FTSE)_20200805State of North Carolina DWR Department of Environmental Qualiq Division of Water Resources 15A NCAC 02T .t1300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 0.1-16& SUPPORTING DOCCMENTATION Application Number: W ! 0 U � _ 0o be completed by DWR) All items mast be cornMeted or llt,e apolication will be returned 1. APPLICANT INFORINIATION: 1. Applicant's name: Town of Pittsboro (company, municipality, HOA, utility, ctc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State. County ® Municipal 3. Signature authority's name: John Poteat per 15A NCAC 02T .0106 h Title: Public Works & Utilities Director 4. Applicant's mailing address: PO Box 759 City: Pittsboro State: NC Zip: 27312- 5. Applicant's contact information: Phone number: (919) 542-4621 Email Address: inateat ct pittshoronc.cov If. PROJECT INFORMATION: ❑ Pnvatety-Uwtied Public Utility F1 Other t I / r -it t 1. Project name: Chatham Park Section 7.1 Sewer Intercentor 2. Application -Project status: ® Proposed (New Permit) ❑ Existing Permit Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQOO 3. County where project is located: Chatham 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.75 Longitude: -79.16 .. tj ED 0 e t =s' ra r 5. Parcel ID (if applicable): 0090944 (or Parcel ID to closest downstream server) C v III. CONSULTANT ENFORMATION: I. Professional Engineer: Christopher 1-luff License Number: 024420 Firm: WithersRavenel Inc. Mailing; address: 1 ] 5 NlacKenan Drive City: Caa State: NC Zip: 27511- Phone number: (919)169-3340 Email Address: chuff a withersravenel.com IV. WASTEWATER TREATMENT FACILITY (\N'NVTF) INFORMATION: 1. Facility Name: Town of Pittsbror WWTP Permit Number: NC0020354 Owner Name: Town of Pittsboro V. RECEIVING DOWNSTREAM SE11'ER INFORMATION (if different than NN'NV`TF): 1. Permit Number(s): WQ0036828 Downstream (Receiving) Sewer Size: 12 inub S,.titem NVide Collection Svstem Pe nlit Number(s) (if antmlicahle): «QCS00146 Owner Name(s): Town of Pittsboro FORM- rTA 0.4-16 Y1. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility. has a Certificate of Public Convenience and Necessity been attached'? ❑ Yes [:]No ON A 2. If the Applicant is a Developer of lots to be sold, has a De�-clsij+er's Opernrional ,4 rccsnent (FORM: DFV) been attached'? ❑ Yes []No ®NrA 3. If the Applicant is a 11onie Pro .4•rty Openers' .ssocialivji. has an Qpgrationa[ AL!rcemcnt (TO M: 110.60 been attached'? ❑ Yes ❑No ON A 4. Origin of wastewater: (check all that apply): ® Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ® Retail with food preparation service ❑ Hotel and/or Motels ® School: preschool 1 day care ❑ Medical dental veterinary facilities ❑ Swimming Pool Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool.'Filter Backwash ® Businesses offices 1 factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 80 % Domestic: Commercial 20 % Commercial % Industrial (See 15A_NCAC 02T,.0103(20)) bIs there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? [:]Yes ®No �- If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0I 14LfD Daily Design Flow e b No. of Units Flow gal. GPD gal,' GPD gal,' GPD gaV GAD gal! GPD gal! GPD Total GPD a See 15A N,C 02T .Ol 14(b);1 re'ii 1 1 and c�l') for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42.A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 92T_01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NC_AE tlJ D 14} Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why- ® Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & A'IDC (Gravih' Sewers): I. Summarize gravity sewer to be permitted, - Size (inches) Length (feet) Material 8 1912 PVC Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIll. PUMP STATION DESIGN CRITERIA (If Applicable) — 0ZT .0305 & MDC (Pumv Stations; Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15 a N AC 02T .0305(h1 l ]: ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(I)(B); %- Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS.. (02B .0200 &: 15A NCAC 02T .0305(I)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(Q & tom) ® Yes ❑ No Y 15A NCAC 02T.0305(f) contains minimum senarations that shall he nrnvided inr co-wi-r cvcia .- Setback Parameter* Separation Required Storm sewers and other utilities not Iisted below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands (see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement I0 feet To2 slope of embankment or cuts of 2 feet or more vertical height 10 feel Drainage s stems and interceptor drains 1 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. > **Stream classifications can be identified using the Division's h Surf_aae Water lassificationti xteb rage If noncompliance with 02T_0105( kit J&L see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ® No ❑ N. A i Seethe Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction i As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N A This would include Trout Buffered Streams per 1 ti, NCAC_ 213.0202 4. Does the project require coverage.:authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? %- Information can be obtained from the IQ]. & Buffer Permitting Branch 5. Does project comply with 15A NCAC' 0?T :O105 ) (additional permitsicertifications)? ® Yes ❑ No Per 15A NCAC 02T.0 I 05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, ")sigh -priority sewer'° means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. [--]Yes ® No ❑ N- A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minirrium Design Criteria for the Permitting of Pump rations and Force Mpinsilhest version and the (ira j ..Sewer Minimum pes n.Crit, ria i latest tersionl as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the re uest is reguired prior to submittal of the Fast Track ApOication and su rtin documents. 2. Professional Engineer's Certification: 1, —�- Nt Engineer's name from Application Item 111.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a Fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. _d.MV,I- North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0I06(b): I, .JD kn Elca., attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete_ NOTE - In accordance with General Statutes 143-. 15.6-A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: O Dom: FORM: FTA 04-16 Page 5 of `40 �;"; '"i�`�'� "ti.�.,'*=-f� �__-• I Haven Creek, ! �}� ��'•.� `4� ✓•��/� •Z'r _—�- �.y -. f��`-ti1.j f"� ����^--cam' ,fir r�1•-` .''��`� i- tI R� u5�gt_RU�► r 5 , r � I f -� �� � - c� Country�Rh'outt=Bs� s �. �tr .• r AJ r� Declination 5ne +r N N ! M/ i/ I f lf GN 1.07 EN 8.85' W Project: Chatham Park Interceptor 7.1 Map Name: BYNUM Location: 750751 ft. N, 1944486 ft. E, NAD27 Scale: 1 inch = 1,000 ft. Date: 7/20/2020 I Ilk 1 f �„' I ti S 1AX 0J Jpl J �� + r•r.ti .r SCALE 1:12000 0 1000 2000 3000 FEET 0.0 0.1 0.2 0.3 0.4 0.5 0.6 MILES ::Wither-sRavenet Our people Your success. August 5, 2020 Nc be North Carolina Department of Environment and Natural Resources btort Division of Environmental Quality '�l''ronment Raleigh Regional Office - Water Quality Section 'BUG ` al QUal 3800 Barrett Drive Raleigh, NC 27609 RE: Fast Track Town of Pittsboro 'Ice glanal4f�co Chatham Park Section 7.1 Sewer Interceptor WR No. 2120469.11 To whom it may concern: On behalf of the Town of Pittsboro, please find attached documentation in support of a Fast -Track Application (FTA 04-16) for the above referenced project The purpose of the project is to install a new sewer interceptor to serve the Chatham Park development and surrounding area. The interceptor will extend from an existing sewer line a southernly direction paralleling an unnamed tributary of Haven Creek to just pass the proposed extension of Grant Drive. This project included the construction of approximately 1,912 linear feet of 8-inch, gravity sewer, associated manholes, jack and bore under US-64, connection to an existing gravity sewer, site restoration, and all other work necessary to provide a working gravity sewer line. This project will be permitted at zero flow since this is the first part of the future Chatham Park development and the future connecting sewers will have the permitted flows. Included with this submittal are one original and one copy of the items listed below: • Application Fee - Check in the Amount of $480.00 • Application Form (FTA 04-16) • Site Map (USGS Quad) • Google Street View Map of site Please advise if you require additional information or have any questions concerning our submittal Sincerely, Wit er avenel 1 i Christo er N. Huff, PE Project Engineer 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 j f: 919.467.60081 www.witiiersravenel.com I License No. C-0832 Asheville I Cary i Greensboro I Pittsboro [ Raleigh I Wilmington Cashion, Ted From: Robinson, Jason Sent: Thursday, October 22, 2020 3:44 PM To: Cashion, Ted Subject: RE: RE: FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Ted, Proceed with issuing the 7.1 permit, but make sure to add the following special condition: I. This permit shall be for the construction of the wastewater collection facilities only. No flow shall be made tributary to the subject facilities until a permit modification application or an application for an upstream project with associated flow is submitted (with the appropriate fee), 'a modified or new permit is issued, and the Engineer's Certification is received and approved by the Division. (15A NCAC 02T.01161 ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Fertenbaugh, Christyn L Sent: Thursday, October 22, 2020 2:21 PM To: Robinson, Jason <jason.t.robinson@ncdenr.gov> Cc: Cashion, Ted <ted.cashion@ncdenr.gov> Subject: RE: RE: FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 I'm fine with just adding the no flow condition you mentioned if you think that makes sense, since the pump station that may be altered isn't part of this permit. They may actually need to modify the permit for the downstream pump station if it gets rerouted to a new treatment plant, since the FT permits include the language on the supplementary page about being treated at a particular plant. Christyn L. Fertenbaugh, P.E. 1 ems' �-"`� �` ,�►r� �f r n Cashion, Ted / From: Oldham, Robbie <ROldhamCa�Gvithe sr Sent: Wednesday, October 7, 2020 6:09 P To: Robinson, Jason; Cashion, Ted; Huff, ckennedy@pittsboronc.gov Cc: Albini, Alicia; Fertenbaugh, Christyn L; Subject: [External] RE: FW: Chatham Park Secti extension application, WQ0041884 not Jason, hris; jpoteat@pi Us boron c.gov; inson, Scott; Manuel, Vanessa 1.7.1 Sewer Interceptor fast track sewer or open attachments unless you verify. Send all suspicious email as an attachment to First, thanks for working with us on the Subdivision West permits and getting those issued. Chris Huff and I have discussed your below questions and have provided responses in red. We will be glad to discuss with the Town as well but wanted to at least get responses back out to everybody. Hopefully this addresses your questions but please advise. Thanks. Robbie Oldham, PE, LEED AP Vice President, Principal Consultant x 55 Grant Drive, Suite D I Pittsboro, NC 27312 Office:919469.3340 1 Direct:919.535.5180 Mobile: 919.795.0395 roldham@withersrave el.com 0 JEJE 0 0 CONFIDENTIALITY AND NONDISCLOSURE From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Wednesday, September 30, 2020 3:10 PM To: Cashion, Ted <ted.cashion@ncdenr.gov>; Huff, Chris <Chuff@withers raven el.com>; jpoteat@pittsboronc.gov; ckennedy@pittsboronc.gov Cc: Oldham, Robbie <ROldham@withersravenel.com>; Albin!, Alicia <aalbini@withersravenel.com>; Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov>; Vinson, Scott <scott.vinson@ncdenr.gov>; Manuel, Vanessa <vanessa.manuel@ncdenr.gov> Subject: RE: FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Chris, After internal discussions (Regional office and Central Office), we have the following additional questions/requests. We've also included Pittsboro staff on this email as the?r input may be needed to response to these: 1. Based on Item V.1 of the application, the downstream sewer for this project is WQ0036828 "Bojangles and Chatham Park SS". The downstream sewer for that line is the CLLC Pump Station (WQ0010602 Mod). We would like to know the current status of the downstream CLLC Pump Station and any other downstream Pump Stations. Please provide a Flow Tracking/Acceptance form with Section II completed for the CLLC pump station and any additional downstream pump stations. The CLLC Pump Station is currently operating under WQ0010602 permit without the modification. Some of the improvements tied to the modification are under construction including the force main but the flow from CLLC pump station, even after the modifications are completed, will continue to discharge to the Town's collection system and treated at the Town's WWTP. There is another pump station downstream of the CLLC pump station (Powell Place) that has valving installed that allows the Town to direct the CLLC flow either to the Powell Place PS or directly to the Town's existing gravity line. It is my understanding that the flow is currently directed to the existing gravity line thereby not requiring repumping by the Powell Place PS but will defer to the Town. Once the Chatham Park Decentralized WRRF (WQ0039375) is certified for operation and the Town's NPDES (IVC0020354) permit modification is issued (currently in review), the CLLC Pump Station will be able to divert flow to the Chatham Park WRRF. With regards to the Flow Tracking/Acceptance form, we did not think this was applicable since this permit request is for zero flow. This project is to provide the sewer interceptor that will serve future office and residential uses within Chatham Park which will anticipate having the residential subdivision plan approved by the Town this month with sewer extension and flow permitting submitted to you first of the year. We would think that is when the Flow Tracking/Acceptance form would be completed but please advise. 2. We're trying to understand the configuration of the downstream lines of this project and where the wastewater will be ultimately treated (see pic below for some context. It can be clicked on and enlarged). a. It's our understanding that the CLLC Pump Station that this project will be flowing to currently pumps west along Russet Run, then South down US 15-501, under US-64, and ties into Pittsboro's existing Collection system and eventually flows to Pittsboro's existing WWTP. Is this correct? That is correct. b. The CLLC Pump Station Mod permit that was issued in February 2019 proposed a 12" Forcemain that will start at the existing CLLC PS, run South to US 64 and then East/South on 64 until it presumably ties into the Chatham Park Section 5.2 Interceptor (WQ0040741 Mod) which goes directly to the new Chatham Park Treatment Plant. Correct So it appears that at some point the CLLC Pump Station (and therefore this project) will stop flowing to Pittsboro's CS/WWTP, and will instead utilize the new 12" FM that eventually flows to the new Chatham Park Treatment Plant. Is this correct? That is correct but not until the NPDES permit modification is issued, the Chatham Park WRRF is certified and all the other proposed infrastructure improvements are completed. ii. If so, around when is this shift projected to occur? The proposed improvements should be complete by spring 2021 but not sure when the NPDES permit modification will be issued. ------------ Jason T. Robinson, P.E. Raleigh Regiona, Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates— E-mail correspondence to and from this address may be subject to the North Carolina Public Records taw and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Cashion, Ted Sent: Tuesday, September 29, 20201:46 PM To: Huff, Chris <Chuffwithersravenel.com>; Robinson, Jason <�al •son,t.robinson@ncdenr.gov> Cc: Oldham, Robbie <ROldham withersravenel.com>; Albini, Alicia <aalbini@withersravenel.com> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer interceptor fast track sewer extension application, WQ0041884 Thanks Chris, I will follow up. Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion(@ncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 -, o - - �—D,— E Q: MP++4�wital ierrrOry9KKLi O�sa �� Subscribe to Collection System & Sewer Permittina Uodates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. i will be working away from the office most days. I will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919 791-4200. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Huff, Chris <Chuff withersravenel.com> Sent: Tuesday, September 29, 20201:02 PM To: Cashion, Ted <ted.cashion@ncdenr.gov>; Robinson, Jason <jason.t.robinson@ncdenr.gov> Cc: Oldham, Robbie <ROldham@withersravenel.com>; Albini, Alicia <aalbini@withersravenel.com> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 ram-��' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.saam',E� nc.goy Ted, Cashion, Ted From: Robinson, Jason Sent: Wednesday, September 30, 2020 3:10 PM To: Cashion, Ted; Huff, Chris; jpoteat@pittsboronc.gov; ckennedy@pittsboronc.gov Cc: Oldham, Robbie; Albini, Alicia; Fertenbaugh, Christyn L; Vinson, Scott; Manuel, Vanessa Subject: RE: FW; Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Chris, After internal discussions (Regional Office and Central Office), we have the following additional questions/requests. We've also included Pittsboro staff on this email as their input may be needed to response to these: 1. Based on Item V.1 of the application, the downstream sewer for this project is WQ0036828 "Bojangles and Chatham Park SS". The downstream sewer for that line is the CLLC Pump Station (WQ0010602 Mod). We would like to know the current status of the downstream CLLC Pump Station and any other downstream Pump Stations. Please provide a Flow Tracking/Acceptance form with Section II completed for the CLLC pump station and any additional downstream pump stations. 2. We're trying to understand the configuration of the downstream lines of this project and where the wastewater will be ultimately treated (see pic below for some context. It can be clicked on and enlarged). a. It's our understanding that the CLLC Pump Station that this project will be flowing to currently pumps west along Russet Run, then South down US 15-501, under US-64, and ties into Pittsboro's existing Collection system and eventually flows to Pittsboro's existing WWTP. Is this correct? b. The CLLC Pump Station Mod permit that was issued in February 2019 proposed a 12" Forcemain that will start at the existing CLLC PS, run South to US 64 and then East/South on 64 until it presumably ties into the Chatham Park Section 5.2 Interceptor (WQ0040741 Mod) which goes directly to the new Chatham Park Treatment Plant. i. So it appears that at some point the CLLC Pump Station (and therefore this project) will stop flowing to Pittsboro's CS/WWTP, and will instead utilize the new 12" FM that eventually flows to the new Chatham Park Treatment Plant. Is this correct? ii. If so, around when is this shift projected to occur? c• CLIC Pump 51.1ton U-13 r-• f r PrL'Co5L�tl �..� Fwcn tiia�s r,3 i 1 ul�yili { ..tif J1Y7 �.`ti Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting, Updates" E-mail correspondence to and from this address may be subject to the North Carolina Public Records Lmv and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Cashion, Ted Sent: Tuesday, September 29, 20201:46 PM To: Huff, Chris <Chuff@withersravenel.com>; Robinson, Jason <jason.t.robinson@ncdenr.gov> Cc. Oldham, Robbie <ROldham@withersravenel.com>; Albini, Alicia <aalbini@withersravenel.com> 2 Cashion, Ted From: Robinson, Jason Sent: Wednesday, September 30, 2020 3:12 PM To: Cashion, Ted Subject: RE: Chatham park 7.1 application 1 went ahead and sent it to several Withers and Ravenel engineers as well as John Poteat and Chris Kennedy. We'll also need to make sure we add a special condition to this making it clear that no flow can be put into this line until the permit is modified and certified or upstream projects with flow are certified. And also it can't be routed to Chatham Park until that Plant as well as the lines leading to it are certified. ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. -----Original Message ---- From: Cashion, Ted Sent: Wednesday, September 30, 2020 7:31 AM To: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: Chatham park 7.1 application Help me to remember that we need to send the add info email we worked on yesterday to Pittsboro and not just the engineer. I didn't think about that yesterday. Sent from my iPhone Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Thanks Chris, I will follow up. Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cash ion @ncdenr.sov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 E iw«wm,+ H o waft" Subscribe to Collection System & Sewer Permittina Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 will be working away from the office most days. 1 will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COVID-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Huff, Chris <Chuff@withersravenel.com> Sent: Tuesday, September 29, 20201:02 PM To: Cashion, Ted <ted.cashion@ncdenr.eov>; Robinson, Jason <iason.t.robinson@ncdenr.sov> Cc: Oldham, Robbie <ROldham@withersravenel.com>; Albini, Alicia <aalbiniPwithersravenel.com> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 [139� External email. bo not click links nr open attachments unless you verify. Send allsuspicious email as an attachmentito ri port.soam nc.cov Ted, How is the review of WQ0041884, Chatham Park Section 7.1 Sewer interceptor fast track sewer extension application proceeding? Have not ar:ything for you i-1 two weeks. Let me know if you need any additional information. Take care, Christopher Huff, PE 115 MacKenan Drive I Cary NIC 27511 Office:919.469.3340 1 Direct 519,a35.516! i`.lobile:919.795.OA40 1 chuff(awithersravenel.corn CONFIDENTIALITY AND NONDISCLOSURE From: Oldham, Robbie <ROldham@withersrav_enel.com> Sent: Wednesday, September 16, 2020 4:09 PM To: Cashion, Ted <ted.cashionCcDncdenr.gov>; Huff, Chris <Chuff Ewithersravenel.com> Cc: Robinson, Jason <iason.t.robinson ncdenr. ov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Good afternoon Mr. Cashion, I can advise with your question regarding timing. As you probably know with Chris' memo, this sewer line will serve both office and residential development within CP with the first development occurring early next year. We have 154 residential units just to east that will be served by this interceptor with the plans hopefully being approved by the Town of Pittsboro next month. We are on the October Planning Board and anticipate Town Board approval soon thereafter with construction starting first of the year. We are hoping the subdivision will be under construction by the time this interceptor is completed. Hopefully that answers your question and we will be glad to discuss if you need more information. Thanks. Robbie Oldham, PE, LEED AP Vice President, Principal Consultant WithersRavenel 55 Grant Drive; Su.'te D I Pittsboro, NC 27312 Office: 919.469.3; 0 1 Direct:919.S3S.5180 Mobile: 919.795 0395 roldham 2wit hers ravenel. com CONFIDENTIALITY AND NONDISCLOSURE 4 Cashion, Ted From: Cashion, Ted Sent: Wednesday, September 16, 2020 527 PM To: Christyn L Fertenbaugh(christyn.fertenbaugh@ncdenr.gov) Cc: Robinson, Jason Subject: FW; [External) FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hi Christyn, Below is the answer to the time lag between construction of the sewer line and the time the line is active. We will certainly include the conditions in the permit you suggested. I'm confused (imagine that) on the comment you made in your previous email that like several of the other Chatham Park lines that are under construction or finished, they can't hook onto the Pittsboro WWTP yet. I guess my question is, why can't they connect to Pittsboro yet? Thanks and have a good evening. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.sov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 r tl: NA 1 DeporttMM of tnvrar *ffW OraRt, Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. I will be working away from the office most days. 1 will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919- 791 4200. Based on the current guidance to minimize the spread of COV1D-19, DE'Q has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Oldham, Robbie <ROldham@withersravenel.com> Sent: Wednesday, September 16, 2020 4:09 PM To: Cashion, Ted <ted.cashion@ncdenr.gov>; Huff, Chris <Chuff@withersravenel.com> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Niernal email. Do not click -links or open attachments unless you verify. Send all suspidous.emall as an attachment to rea��t:spa�t.gov Good afternoon Mr. Cashion, I can advise with your question regarding timing. As you probably know with Chris' memo, this sewer line will serve both office and residential development within CP with the first development occurring early next year. We have 154 residential units just to east that will be served by this interceptor with the plans hopefully being approved by the Town of Pittsboro next month. We are on the October Planning Board and anticipate Town Board approval soon thereafter with construction starting firs the year. We are hoping the subdivision will be under construction by the time this interceptor is completed. Hopefully that answers your question and we will be glad to discuss if you need more information. Thanks i�Robbie Oldham, PE, LEED AP I Vice President, Principal Consultant Wither Ra4nel WithersRavenel v 55 Grant Drive, Suite D I Pittsboro, PIC 27312 Office 919,469.3340 I Direct: ;-525.5180 { Mobile 919.795,0395 ; (1 G f roldham@withersravenel.com / WOO � LV W rf:LC j'r C,4`"i" j' L L� CONFIDENTIALITY AND NONDISCLOSURE wee L F GL� S + W��u v 4�4 From: Cashion, Ted <ted.cashion@ncdeirov> Sent: Wednesday, September 16, 2020 3:30 PM�'' SF I `� `� ,c: -,,✓~ To: Huff, Chris <Chuff@with ersravenel.com> Cc: Oldham, Robbie <ROldham withersravenel.com>; Robinson, Jason < ason.t.robinson ncdenr. ov> 2 r (Sr �/ . r- a A� � Cashion, Ted From: Sent: Cc: Subject: Chris, Cashion, Ted Wednesday, September 16, 2020 3:30 PM 'Huff, Chris' l wo 'Oldham, Robbie'; Robinson, Jason RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, W00041884 You noted in your answer below that this sewer line is a new line for the future development of Chatham Park, not a reroute. What is the time lag between when it wil I be constructed and when it will be activated? Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashionCcDncde,nr,gau 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. I wilt be working away from the office most days. l will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Cashion, Ted Sent: Wednesday, September 16, 2020 2:00 PM To: Huff, Chris <Chuff@withersravenel.com> Cc: Oldham, Bobbie <ROldham@withersravenel.com>; Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Yes, there will be another question or 2 from us. Waiting to finalize from our permit coordinator. Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 J r �anr rri �'Q:� Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the contends exempt by statute or other regulation. 1 will be working away from the office most days. 1 will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COViD-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Huff, Chris <Chuff@withersravenel.com> Sent: Wednesday, September 16, 202010:48 AM To: Cashion, Ted <ted.cash.on@ncdenr.gov> Cc: Oldham, Robbie <ROldham withersravenel.com> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 r External email. Do not click Jinks or open attachments unless you verify. Send all auspicious email as an attachment , 1'e+r%4Vam@nr. ov 4 Cashion, Ted From: Fertenbaugh, Christyn L Sent: Tuesday, September 15, 2020 2:53 PM To: Cashion, Ted Cc: Robinson, Jason Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Mello, Thanks for the info, I wasn't aware of the narrative information. What we need to do is verify if they are planning to construct it and leave it as a dry line — e.g., what is the time lag between when it will be constructed and when it will be activated? If there's a lag of any significant length of time, then it is considered to be a dry line — like several of the other Chatham Park lines that are under construction or finished, but cannot be utilized since they cannot hook onto the Pittsboro WWTP yeti Simply stating flows will be permitted later isn't really clear as to when those flows will be activated, so that's ere we need the verification as to what is actually going on (this is really applicable to any situation, not just thes)asystems). Either way, we'll need a perr)1 i condition inserted about not making flow tributary until the upstream flows are r permitted and certified —which ill need to go on the front page in addition to being in the special conditions. Thanks! Christyn L. Fertenbaugh, P.E. i Environmental Engineer) C r Municipal Permitting Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" 919-707-3625 — Office 919-807-6489 — Fax christ n.fertenbau h ncdenr. ov Please note that during this unusual time, I am unfortunately not available via my regular telephone number. The best way to reach me is via email. If you would like speak with me on a call, please contact me via email to schedule an internet call, such as using Teams, Zoom, WebEx. or other web -based calling services. Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N. Salisbury Street Rm. 925S Raleigh, NC 27604-1170 f)rirurtmm�t a mrinxfrneals! Ou.rtitr Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties. From: Cashion, Ted Sent: Tuesday, September 15, 2020 1:04 PM To: Fertenbaugh, Christyn i-<christyn.fertenbaugh@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hi Christyn, We will add the special condition regarding wetlands as you suggested. Your comment about the 'dry line' is still confusing me, maybe because I have forgotten the concerns regarding Pittsboro and Chatham Park. Their response was "This is a new line for the future development of Chatham Park, not a reroute". This will be a 0 flow permit. The narrative states that future connecting sewers will have the permitted flows. Flows will be trib to the Pittsboro WWTP. What other question(s) do I need to pose to them about this? Sorry for my confusion.... thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion ncdenr. ov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 will be working away from the office most days. 1 will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COVID-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To occomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Fertenbaugh, Christyn L <christ n.fertenbau h ncdenr. ov> Sent: Monday, September 14, 202010:57 AM To: Cashion, Ted <ted.cashion@ncdenr.eov> Cc: Robinson, Jason<iason.t.robinson@ncdenr.eov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hello, I noted that they really didn't answer the dry line question clearly — you had asked if it was a dry line or a reroute, and they said "this is a new line." I think they need to clarify further on that point. For the wetlands impacts, since there aren't any manholes that appear to be impacting wetlands, we can insert a condition that reads: All sewers located within the buffers for wetlands as specified in 15A NCAC 02T.0305(f) shall meet the materials, testing methods, and acceptability standards for water mains as specified in 15A NCAC 18C. If you need anything else, please let me know. Thanks! Christyn L. Fertenbaugh, P.E. Environmental Engineer Municipal Permitting Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" 919-707-3625 — Office 919-807-6489 —Fax christyn.ferten ba ue h @ ncd en r.eov Please note that during this unusual time, I am unfortunately not available via my regular telephone number. The best way to reach me is via email. If you would like speak with me on a call, please contact me via email to schedule an internet call, such as using Teams, Zoom, WebEx, or other web -based calling services. Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N. Salisbury Street Rm. 92SS Raleigh, NC 27604-1170 rr�afiI, Al . :,tip I eaannrotT"` nt at tftr cntal awNcy Email correspondence to and frorTf this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Cashion, Ted Sent: Friday, September 11, 2020 7:43 AM To: Fertenbaugh, Christyn t <christ n.fertenbau h ncdenr. ov> Cc: Robinson, Jason <'ason.t.robinson ncdenr. ov> Subject: FW: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hi Christyn, See the response below and attached and provide comments/special conditions as needed. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 V f. - o, �—D,— E P�ps�Ynrl er (nyY{vyryrthi , Subscribe to Collection System & Sewer Permittinq Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. l will be working away from the office most days. 1 will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Huff, Chris <Chuffwithersravenel.com> Sent: Thursday, September 10, 2020 4:30 PM To: Cashion, Ted <ted.cashion@ncdenr.sov>; John Poteat <' oteat ittsboronc. ov> Cc: Oldham, Robbie <ROldham withersravenel.com>; Robinson, Jason <iason.t.robinson@ncdenr.sov>; Chris Kennedy <ckennedy@oittsboronc.eov> Subject: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 �n $xternal:ernail..Do not cifak links or open attachments unless you verify. Send all suspidous email:as an attadlsmentto e ort.s am nc. ov Ted, See comments below in RED. Please call if you have any questions. Take care, Christopher Huff, PE 115 MacKenan Drive I Cary, NC 27511 Office: 919.469,3340 I Direct: 919.535.5161 Mobile: 919.795.0401 chuff@?withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Cashion, Ted <ted.cashionncdenr.gov> Sent: Monday, September 07, 202011:17 AM To: John Poteat <lpoteat a2pittsboronc.eov>; Huff, Chris <Chuff@withersravenel.com> Cc: Robinson, Jason <lason.t.robinson@ncdenr.eov>; Chris Kennedy <ckennedyepittsboronc.gop Subject: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 We are beginning review of the subject application and have some questions for you to clarify. Item IX.2 of the application was marked 'no' for complying with separation requirements for wetlands. Please explain. We have attached plan sheet PP-1 to show where the wetland impact �s located. This impact has been permitted and we are using AWWA C-900 PVC pipe, which meets water main requirements. Please address the following from our permit coordinator: They're stating it connects to and from existing gravity sewers. Which sewers are those, e.g. permit numbers? Are either octiv%ertified? This information is ;ocated in Section V of the FTA. We are connecting to an existing 12" line with permit number WQ0036828 and the line is active. What part of Chatham Park will it serve and what are the expected future flows? We can't verify that it is sized properly without knowing what they anticipate being discharged. We have attached a design memorandum on what area will be served and line sizing calculations. it's not clear to us whether this is intended to be a dry line or a reroute of existing flows, based on the info we have. Please elaborate. This is a new line for the future development of Chatham Park, not a reroute. We'll continue review and drafting of the permit upon submittal and review of the above items. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 4:� f. T .. ; D � DryarW44%6f if owem RfJ: Subscribe to Collection System & Sewer Permittin4 Uodates Email correspondence to and from this address may be subject to the North Carolina Public Records taw and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 will be working away from the office most days. i will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COViD-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Cashion, Ted From: Cashion, Ted Sent: Tuesday, September 15, 2020 1:04 PM To: Fertenbaugh, Christyn L Cc: Robinson, Jason Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hi Christyn, We will add the special condition regarding wetlands as you suggested. Your comment about the 'dry line' is still confusing me, maybe because I have forgotten the concerns regarding Pittsboro and Chatham Park. Their response was "This is a new line for the future development of Chatham Park, not a reroute". This will be a 0 flow permit. The narrative states that future connecting sewers will have the permitted flows. Flows will be trib to the Pittsboro WWTP. What other question(s) do I need to pose to them about this? Sorry for my confusion.... thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 e:! � �-;E �,I11 �/ DSO t N [n�tonrnenW am%" Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. i will be working away from the office most days. I will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200, Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov> Sent: Monday, September 14, 2020 10:57 AM To: Cashion, Ted <ted.cashion@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Mello, noted that they really didn't answer the dry line question clearly — you had asked if it was a dry line or a reroute, and they said "this is a new line." I think they need to clarify further on that point. For the wetlands impacts, since there aren't any manholes that appear to be impacting wetlands, we can insert a condition that reads: All sewers located within the buffers for wetlands as specified in 15A NCAC 02T.0305(f) shall meet the materials, testing methods, and acceptability standards for water mains as specified in 15A NCAC 18C. If you need anything else, please let me know. Thanks! Christyn L. Fertenbaugh, P.E. Environmental Engineer Municipal Permitting Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" 919-707-3625 —Office 919-807-6489 — Fax christyn.fertenba ugh (@ncden r.sov Please note that during this unusual time, 1 am unfortunately not available via my regular telephone number. The best way to reach me is via email. If you would like speak with me on a tali, please contact me via email to schedule an internet call, such as using Teams, Zoom, WebEx, or other web -based calling services. Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N. Salisbury_ Street, Rm. 9255 Raleigh, NC 27604-1170 Cashion, Ted From: Fertenbaugh, Christyn L Sent: Monday, September 14, 2020 10:57 AM To: Cashion, Ted Cc: Robinson, Jason Subject: RE: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hello, I noted that they really didn't answer the dry line question clearly — you had asked if it was a dry line or a reroute, and they said "this is a new line." I think they need to clarify further on that point. [the the wetlands impacts, since there aren't any manholes that appear to be impacting wetlands, we can insert a dition that reads: All sewers located within the buffers for wetlands as specified in 15A NCAC 02T.0305(f) shall meet' materials, testing methods, and acceptability standards for water mains as specified in 15A NCAC 18C. If you need anything else, please let me know. Thanks! Christyn L. Fertenbaugh, P.E. Environmental Engineer Municipal Permitting Unit Division of Water Resources Department of Environmental Quality "Subscribe to Collection System & Sewer Permitting Updates" 919-707-3625 — Office 919-807-6489 — Fax christ n.fertenbau h ncdenr. ov Please note that during this unusual time, I am unfortunately not available via my regular telephone number. The best way to reach me is via email. If you would like speak with me on a call, please contact me via email to schedule an internet call, such as using Teams, Zoom, WebEx, or other web -based calling services. Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N. Salisbury Street Rm. 9255 Raleigh, NC 27604-1170 D, E IWA I Q parlmanl o "Won"Mial ounoty Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Cashion, Ted Sent: Friday, September 11, 2020 7:43 AM To: Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: FW: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Hi Christyn, See the response below and attached and provide comments/special conditions as needed. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion ncdenr. ov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 D. .. _Q�s .., Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 will be working away from the office most days. ! will be checking email periodically. if you need immediate assistance please contact a water resources staff member at our main number, 919-791-4100. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Huff, Chris <Chuff,@withersravencl.corn> Sent: Thursday, September 10, 2020 4:30 PM To: Cashion, Ted <ted.c_a_shion@,ncdenr.eov>; John Poteat <iooteat(@Pittsboronc.gov Cc: Oldham, Robbie <ROldham@withersravenel.com>; Robinson, Jason <'ai son.t.robinson@ncdenr.eov>; Chris Kennedy <ckenned ittsboronc. ov> Subject: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 FENWItxternal email. Do not-dick�linksor open attachments unless you verify. Send all suspicious email as an attachmentto •re ort.s am cwnc •ov Ted, See comments below in RED. Please call if you have any questions. Take care, Christopher Huff, PE 115 MacKenan Drive I Cary, NC 27511 Office- 919.469.3340 1 Direct 919.535 5161 Mobile 919 795.0401 chuff@withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Cashion, Ted <ted.cashion@ncdenr.eov> Sent: Monday, September 07, 2020 11:17 AM To: John Poteat <jPooteat@Pitt sboronc.eov>; Huff, Chris <Chuff@withersravenel_.com> Cc: Robinson, Jason <'ason.t.robinson ncdenr. ov>; Chris Kennedy <ckenned ittsboronc. ov> Subject: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 We are beginning review of the subject application and have some questions for you to clarify. Item IX.2 of the application was marked 'no' for complying with separation requirements for wetlands. Please explain. We have attached plan sheet PP-1 to show where the wetland impact is located. This impact has been permitted and we are using AWWA C-900 PVC pipe, which meets water main requirements. Please address the following from our permit coordinator: • 'They're stating it connects to and from existing gravity sewers. Which sewers are those, e.g. permit numbers? Are either actin%ertified? This information is located in Section V of the FTA. We are connecting to an existing 12" line with permit number WQ0036828 and the line is active. • What port of Chathom Park will it serve and what are the expected future flows? We can't verify that it is sized properly without knowing what they anticipate being discharged. We have attached a design memorandum on what area will be served and line sizing calculations. • It's not clear to us whether this is intended to be a dry line or a reroute of existing flows, based on the info we have. Please elaborate. This is a new line for the future development of Chatham Park, not a reroute. We'll continue review and drafting of the permit upon submittal and review of the above items. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 DD- E aP;+ri'ZRS a! Im.er~u;.R/ Subscribe to Collection Svstem & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. i will be working awayfrom the office most days. l will be checking email periodically. if you need immediate assistance please contact a water resources staff member at our main number, 9I9-79I-4200. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, fill DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 4 Cashion, Ted From: Huff, Chris <Chuff@withersravenel.com> Sent: Thursday, September 10, 2020 4:30 PM To: Cashion, Ted; John Poteat Cc: Oldham, Robbie; Robinson, Jason; Chris Kennedy Subject: [External] FW: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 Attachments: Sheet PP-1.pdf; 2020-08-06 Chatham Park 7-1 Interceptor Pipe Sizing Memo.pdf • External email. Do not crck-links or open attachments unless you verify: Send all suspidous erhail as an attachmentto eRort.spam�2ncyov Ted! See comments below in RED. Please call if you Have any questions. Take care, Christopher Huff, PE 0 - ----- 115 MacKenan Drive I Cary, NC 27511 Office 919.469,3340 I Direct 919,535-5161 Mobile: 919 795 0401 chuff2withersraven el.com 1.S:JZ1Z:[E J CONFIDENTIALITY AND NONDISCLOSURE From: Cashion, Ted <ted.cashion@ncdenr.eoy> Sent: Monday, September 07, 202011:17 AM To: John Poteat <' oteat ittsboronc. ov>; Huff, Chris <Chuff!2withersravenel.com> Cc: Robinson, Jason <iason.t.robinson ncdenr. ov>; Chris Kennedy <ckennedy@pittsboronc.eov> Subject: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 We are beginning review of the subject application and have some questions for you to clarify. Item IX.2 of the application was marked 'no' for complying with separation requirements for wetlands. Please explain. We have attached plan sheet PP-1 to show where the wetland impact is located. This impact has been permitted and we are using AWWA C-900 PVC pipe, which meets water main requirements. Please address the following from our permit coordinator: They're stating it connects to and from existing gravity sewers. Which sewers are those, e.g. permit numbers? Are either active%ertified? Th+s information is located in Section V of the FTA. We are connecting to an existing 12" fine with permit number WQ0036828 and the line is active. What part of Chatham Park will it serve and what are the expected future flows? We can't verify that it is sized properly without knowing what they anticipate being discharged. We have attached a design memorandum on what area will be served and line sizing calculations. It's not clear to us whether this is intended to be a dry line or a reroute of existing flows, based on the info we have. Please elaborate. This is a new line for the future development of Chatham Park, not a reroute. We'll continue review and drafting of the permit upon submittal and review of the above items. ted Ted Cashion Water Quality Reg=onal Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion ncdenr. ov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 -WE Mpa'ssnl a! [nrttrsnfnL! QW►� Subscribe to Collection System & Sewer Permitting Llodates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 will be working away from the office most days. I will be checking email periodically. If you need immediate assistance please contact a water resources staff member at our main number, 919-791.4200. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. —•..M.. w„ .-a... ram_ ...� OWGSLlyd lO HMOL uoAwnS I LiwueW I uaiwj3uA .' bOldlMiN1 83M35 r 1auaneasjagl!m oli Iv01lD3s oa+sz 01 oo+oL els AM WVHIVH:) 1 ' Stp �CZYlS 3NiHa1Yn {gP{gf.foitPt~:,, • ' � �' �� r t � �l Ij �^� `•see f Y 5 9r d 9 - d9 s�— 0 WithersRavenel Our People Your Success DESIGN MEMORANDUM To: Town of Pittsboro From: Christopher N. Huff, PE - WithersRavenel, Inc. Date: August 6, 2020 Project: Chatham Park Section 7.1 Sewer Interceptor (2120469.11) Subject: Interceptor Pipe Sizing The purpose of this design memorandum is to discuss the process of how the Section 7.1 Sewer Interceptor was sized. The sizing of the sewer interceptor was based on flow information derived by WithersRavenel (attached). The pipe size for this interceptor will be 8 inches in diameter. The design standard for the interceptor is for the pipes to flow 50% full at average daily flow, with a minimum velocity of 2.0 ft/sec and no more than 75% full during the calculated peak flow. The minimum slope and velocity are requirements as published in the State's "Minimum Design Criteria for the Permitting of Gravity Sewers". All calculations were performed using Bentley Flow Master, utilizing the Manning Formula with a Roughness Coefficient of 0.013 and a minimum pipe slope of 0.60%. In Table 1, top section, shows the 8-inch interceptor flowing at average daily flow. The average daily flow for the interceptor is estimated to be 192,000 gpd. Results from Flow Master shows the interceptor will have a flow depth of 3.09" and a flow velocity of 2.28 ft/sec. The bottom section is for peak flow. The peak flow was derived by multiplying the average daily flow by a peaking factor of 2.5, which is 480,000 gpd (192,000 gpd * 2.5). Results from Flow Master shows the interceptor will have a flow depth of 5.38" and a flow velocity of 2.97 ft/sec. Detailed results are attached to this design memorandum. TABLE 1 Minimum Normal Pipe Size and Solve Friction Roughness Channel Depth Diameter Discharge Percent Velocity Material For Method Coefficient Slope N (in) (in) (MGD) Full (%) (Ft/s) Pipe sizing - Minimum Slope at Average Daily Flow 8-inch PVC Normal section Depth I Manning Formula 1 0.013 0.60 3.09 8 192,000 38.7 1 2.38 Pipe Sizing - Minimum Slope at Peak Flow 8-inch PVC section Normal I Depth Manning Formula 0.013 0.60 5.38 8 480,000 67.3 2.97 As shown the 8-inch interceptor meets the flow depth and minimum velocity requirements for average daily flow as required in the "Minimum Design Criteria for the Permitting of Gravity Sewers" and the peak flow is below the 75% flow depth. 55 Grant Drive, Suite D I Pittsboro, NC 27312 FLOW CALCULATIONS Chatham Park Section 7.1 Sewer Interceptor Basin Study Withers & Ravenel K.112112-04601120469.11-CP Sec 7.1 Sewer tntercentorlUtitities105-Desian PhaselSewer StudWBasin Ftows.xlsxlFtnw Cartrulatinnc Discharge Facility Design Units Flow per Unit (gpd) Number of Units Total Flow (gpd) Dwellings (Assume 3 bedrooms) per dwelling 180 300 54.000 Apartments per dwelling 240 250 60,000 School with showers and cafeteria per person 16 0 School without showers and with cafeteria per person 12 0 Boarding school per person 75 0 Motels at 65 gal/person (rooms only) per person 130 0 Trailer courts at 3 personsitrailer per lra ler 225 0 Restaurants per seat 40 0 Interstate or through highway restaurants per seat 180 0 Interstate rest areas per person 5 0 Service stations per vehicle serviced 10 0 Factories per person per 8 hr shift 25 0 Commerical per 1,000 sq. ft. of ultimate floor 120 250 30,000 Office per sq. ft 0.09 200,000 18,000 Hotel per room 250 120 30,000 Hospitals per bed 300 0 Nursing home (add 75 gals for laundry) per bed 120 0 Homes for the aged per bed 60 0 Child care center per child and adult 10 0 Laundromats, 9 to 12 machines per machine 250 0 Swimming pools per swimmer 10 0 Theaters, auditorium type per seat 1 5 0 Picnic areas per person 51 0 Summer Camp Campers per person 60 0.0 Staff per person 60 0.0 Resort camps, day & night with limited plumbing per campsite 50 0.0 Luxury camps with flush toilets per campsite 100 0.0 Churches (no kitchen) per seat 31 0.0 Current Flow 0 0.0 Proposed Flow 01 0.0 Average flow (gpd) 192,000 Average flow (gpm) 133 Design peaking factor 2.50 Peak flow (gpd) 480,000 Total flow (gpm) 333 Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Diameter Discharge Results Normal Depth Flow Area Wetted Perimeter Hydraulic Radius Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Average End Depth Over Rise Normal Depth Over Rise Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope Worksheet for Circular Pipe Q ADF Manning Formula Normal Depth SubCritical 0.013 0.60 % 8.00 In 192.000 gal/day 3.09 in 0.12 ft2 0.90 ft 1.67 in 0.65 ft 0.25 ft 38.7 °% 0.00653 ft/ft 2.38 ft/s 0.09 ft 0.35 ft 0.96 650,738 gal/day 604,941 gallday 0.00060 fllft 0.00 in 0.00 ft 0 0.00 in 0.00 ft 0.00 °% 38.69 "% Infinity fus Infinity ft/s 3.09 in 0.25 It 0.60 % 0.00653 ft/ft Bentley Systems, Inc. Haostad Methods Solution Csntientley FtowMaster VBi (SELECTserles 1) 108.11.01.03] WW2020 8.31:21 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-766-1666 Page 1 of 1 Worksheet for Circular Pipe Q Peak Flow Project Description "°., V Mq T{,ti. Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.60 % Diameter 8.00 In Discharge 480,000 gaUday Results Normal Depth 5.38 In Flow Area 0.25 W Wetted Perimeter 1.28 ft Hydraulic Radius 2.34 in Top Width 0.63 ft Critical Depth 0.41 ft Percent Full 67.3 % Critical Slope 0.00792 ftlft Velocity 2.97 ftls Velocity Head 0.14 ft Specific Energy 0.59 ft Froude Number 0,83 Maximum Discharge 650,738 gallday Discharge Full 604,941 gal/day Slope Full 0.00378 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.00 in Length 0.00 ft Number Of Steps 0 GVF Output -Data Upstream Depth 0.00 in Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 67.29 % Downstream Velocity Infinity fils Upstream Velocity Infinity ftls Normal Depth 5.38 In Critical Depth 0.41 ft Channel Slope 0.60 % Critical Slope 0.00792 ft/ft Bentley Systems, Inc. Haestad Methods Solution Centienlley F1owMaster V81 (SELECTseries 1) (08.11.01.031 810020 8.33:16 AM 21 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-I03-765-1666 Page 1 of 1 S Cashion, Ted From: Cashion, Ted Sent: Monday, September 7, 2020 11:17 AM To: John Poteat; Huff, Chris Cc: Robinson, Jason; Chris Kennedy Subject: Chatham Park Section 7.1 Sewer Interceptor fast track sewer extension application, WQ0041884 We are beginning review of the subject application and have some questions for you to clarify. Item IX.2 of the application was marked 'no' for complying with separation requirements for wetlands. Please explain. Please address the following from our permit coordinator: • They're stating it connects to and from existing gravity sewers. Which sewers are those, e.g. permit numbers? Are either active%ertified? • What part of Chatham Park will it serve and what are the expected future flows? We can't verify that it is sized properly without knowing what they anticipate being discharged. It's not clear to us whether this is intended to be a dry line or a reroute of existing flows, based on the info we have. Please elaborate. We'll continue review and drafting of the permit upon submittal and review of the above items. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion ncdenr. ov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 DE Subscribe to Collection System & Sewer Permitting Updates 1 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regplation. / will be working away from the office most days. I will be checking email periodically. if you need immediate assistance please contact a water resources staff member at our main number, 919-791-4200. Based on the current guidance to minimize the spread of COViD-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Cashion, Ted From: Cashion, Ted Sent: Monday, August 10, 2020 10:43 AM To: Fertenbaugh, Christyn L Cc: Robinson, Jason Subject: Re: Pittsboro Chatham Park Zero flow sewer extension application thanks Christyn, we'll follow up with them and let you know the deal. Ted Cashion Water Quality Regional operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashionCcDncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov> Sent: Monday, August 10, 202010:39 AM To: Cashion, Ted <ted.cashion@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: Pittsboro Chatham Park Zero flow sewer extension application Thanks — a few questions I have: • They're stating it connects to and from existing gravity sewers. Which sewers are those, e.g. permit numbers? Are either active/certified? 0 What part of Chatham Park will it serve and what are the expected future flows? We can't verify that it is sized properly without knowing what they anticipate being discharged. It's not clear to me whether this is intended to be a dry line or a reroute of existing flows, based on the info we have. I think the answers to the above will help clarify — if it is a dry line, we'll probably need to chat further before issuance. Christyn L. Fertenbaugh, P.E. Environmental Engineer Municipal Permitting Unit Division of Water Resources Department of Environmental Quality —Subscribe to Collection System & Sewer Permitting Updates" 919-707-3625 — Office 919-807-6489 — Fax christyn.fertenbaugh @ncdenr.gov Mailing: 1617 Mail Service Center Raleigh, NC 27699-1617 Physical: 512 N._Salisbury Street, Rm. 925S Raleigh, NC 27604-1170 Email correspondence to and from th,s address is subject to the North Carolina Public Records Law and may be disclosed to th rd porties. From: Cashion, Ted Sent: Saturday, August 8, 2020 11:27 AM To: Fertenbaugh, Christyn L<christyn.fertenbaugh@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: Pittsboro Chatham Park Zero flow sewer extension application Hi Christyn, Hope all is well in your world. Attached is an application we just received. Pittsboro is the applicant, it will serve Chatham Park, going to Pittsboro WWTP, and it's zero flow. In case you wish to review and provide comments for the fast track permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 E �+ Subscribe to Collection System & Sewer Permittincl Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Based on the current guidance to minimize the spread of COVID-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 41 Lfl-Y 1 Cashion, Ted �w D C�� J� From: Cashion, Ted Sent: Saturday, August 8, 2020 11:26 AM To: Christyn L Fertenbaugh(christyn.fertenbaugh@ncdenr.gov) Cc: Robinson, Jason Subject: Pittsboro Chatham Park Zero flow sewer extension application Attachments: Scanned from 2nd Floor Xerox.pdf Hi Christyn, Hope all is well in your world. Attached is an application we just received. Pittsboro is the applicant, it will serve Chatham Park, going to Pittsboro WWTP, and it's zero flow. In case you wish to review and provide comments for the fast track permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 .,DE qf W rlg ("Tommntv A� Nr�� Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Based on the current guidance to minimize the spread of COV1D-19, DEQ has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accomodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.