HomeMy WebLinkAbout540062_Response to Notice_20201022Dear Mr. May,
�FCFt�Fo/Nco
OC F'v9ip�A
T 22'16 tor �a�0
wa h/? O19 Q0,00
i
n R�9inna ��ron
�e
1 sent the latest sludge survey in with my response
showing that lagoon #1 has a total treatment
volume of 52% and explained the situation of
removing sludge from lagoon #2 by mistake.
I have secured Down East Dewatering to handle the
sludge removal and the plan is to start in March
2021 and apply prior to planting corn.
I have current soil samples and the only thing that
will be needed is to take a current sludge sample
prior to land application.
If there is any further information that is needed
please contact me at 252-521-2787.
Sincerely,
Rodney Smith