Loading...
HomeMy WebLinkAbout540062_Response to Notice_20201022Dear Mr. May, �FCFt�Fo/Nco OC F'v9ip�A T 22'16 tor �a�0 wa h/? O19 Q0,00 i n R�9inna ��ron �e 1 sent the latest sludge survey in with my response showing that lagoon #1 has a total treatment volume of 52% and explained the situation of removing sludge from lagoon #2 by mistake. I have secured Down East Dewatering to handle the sludge removal and the plan is to start in March 2021 and apply prior to planting corn. I have current soil samples and the only thing that will be needed is to take a current sludge sample prior to land application. If there is any further information that is needed please contact me at 252-521-2787. Sincerely, Rodney Smith