HomeMy WebLinkAbout20201300 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201025Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, October 25, 2020 12:01 AM
To: josselyn@bfec.org
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Walker WNCSI - Walker WNCSI -
20201300 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Walker WNCSI that you submitted on 9/24/2020. The ID number for that project is 20201300,
Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days requirement and your
application can now be accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
ID#* 20201300
Version* 1
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name * Josselyn Lucas
Contact Email Address* josselyn@bfec.org
Project Name* Walker WNCSI
Project Owner* Brushy Fork Environmental Consulting, Inc.
Project County* Watauga
Owner Address: Street Address
10565 Highway 421 South
Address Line 2
aty State / Frovince / Region
Trade TN
Rbstal / Zip Code Country
37691 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.
The purpose of the project is to stabilize eroding stream banks on Cove
Creek. Lack of a vegetated riparian buffer, runoff from adjacent roadways,
and an increased sediment load due to upstream agricultural land use has
caused degradation on this reach. Streambank benching and sloping,
installation of natural channel design structures, and a planted riparian
forest buffer will be used to restore the reach.
Please give a couple of dates you are available for a meeting.
10/1 /2020
10/4/2020
Please attach the documentation you would like to have the meeting about.
Walker Site Plan_2_8-27-19-Layout2.pdf 406.12KB
Aerial Map.pdf 1.84MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/24/2020