Loading...
HomeMy WebLinkAbout20171548 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201024Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, October 24, 2020 12:01 AM To: lauren.norris-heflin@timmons.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Huffman Point - Huffman Point - 20171548 Ver 2 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Huffman Point that you submitted on 9/23/2020. The ID number for that project is 20171548, Version 2. Your Pre -Filing Meeting Request has now reached the 30 calendar days requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 ID#* 20171548 Version* 2 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 9/23/2020 ................................................................................................................................................................................................................................................................................................................ Contact Name * Lauren Norris -Heflin Contact Email Address* Project Name* Project Owner* Project County* Owner Address: lauren.norris-heflin@timmons.com Huffman Point Diamondback Investment Group, LLC Alamance Street Address Address Line 2 Cty Postal / Zip Code Is this a transportation project? * r Yes r No State / Province / Region Country Type(s) of approval sought from the DWR: * 401 Water Quality Certification - r- 401 Water Quality Certification - Regular Express * Individual Permit F Modification F- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 20171548 Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below.* The proposed project at the Huffman Point site located in Burlington, North Carolina within Alamance County includes the installation of an additional pedestrian crossing due to local municipality greenway requirements. Previously permitted impacts under Nationwide Permits 12, 14, and 18 and Water Quality General Certification Numbers 4133, 4135, and 4139 included 139 linear feet (I.f.) of permanent stream, 0.01 acres of permanent wetland impacts, and 78 I.f. of temporary stream impacts. Of the 139 I.f. of permanent stream impact, 114 I.f. is permanent for culvert fill and 25 I.f. is permanent — no loss fill for dissipator pads. The proposed pedestrian crossing will result in additional stream impacts, but will not cause overall permanent stream impacts to exceed the 150-linear foot permitting threshold. Non-compliance with Nationwide Permit 14 at impact location S-1 (see attached), originally permitted for 114 I.f. of permanent stream impacts, has resulted in the issuance of a Notice of Violation (NOV) by the USACE. Resolution of this NOV is in -progress, and a design is currently being created to bring the culvert into compliance and reduce permanent impacts back to 114 I.f. It is anticipated that the new design will be ready and provided to the USACE and DWR for review by the week of September 28th. It is understood that although a new permit application can be reviewed, no new permits will be issued for the additional proposed pedestrian crossing until the NOV is resolved. Please give a couple of dates you are available for a meeting. 9/23/2020 9/25/2020 9/28/2020 9/29/2020 10/1 /2020 Please attach the documentation you would like to have the meeting about. 401 Water Quality.pdf 137.91KB 404 Nationwide Permit 2017-02386 NW 12 14 979.81 KB 18.pdf pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/23/2020