HomeMy WebLinkAbout20201283 Ver 1_PreFiling Email 30-Day Clock Reached_20201025Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, October 25, 2020 12:01 AM
To: richard.harmon@woodplc.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Duke Energy Roxboro Steam Electric Plant
Roxboro Ash Basin Landfill Project - Duke Energy Roxboro Steam Electric Plant
Roxboro Ash Basin Landfill Project - 20201283 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill Project that you submitted
on 9/24/2020. The ID number for that project is 20201283, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days requirement and your
application can now be accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
ID#* 20201283 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name*
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Dicky Harmon
richard.harmon@woodplc.com
Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill
Project
Duke Energy
Person
Street Address
1700 Dunnaway Road
Address Line 2
Qty
Semora
Fbstal / Zip Code
27343
State / Rovince / Fbgion
North Carolina
Country
USA
Is this a transportation project?* Yes c: No
Type(s) of approval sought from the DWR:
* 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
* Individual Permit F Modification
* Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes (-- No
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.*
Duke Energy has developed closure plans for the WAB and the EAB at the
Roxboro Plant for the disposal of CCR from each ash basin into the existing
onsite industrial landfill and planned I landfill expansion. Duke Energy
proposes to permit and build an 80-acre landfill expansion (the "project
site" for this assessment) capable of containing the estimated 14.1 million
cubic yards of CCR from the adjacent ash basins to support the closure by
excavation plans.
To complete construction of the proposed Landfill expansion, excavate the
WAB and EAB, and develop three borrow areas, permanent impacts to
wetlands and streams will be necessary. Wetland impacts will be limited to
the Landfill expansion, the WAB and Borrow Area 1. The proposed total
wetland impact is 0.75 acre. Stream impacts will be limited to the Landfill
expansion, the WAB, Borrow Area 1, and Borrow Area 8. The proposed
total stream impact is 3,066 linear feet. Since the Roxboro Plant in not
located within a river basin subject to state riparian buffer regulations,
there will be no impacts to state regulated riparian buffers within the project
site.
Based on the review of the mitigation options available, it was determined
that credit purchase through the North Carolina Division of Mitigation
Services (NCDMS) In -Lieu Fee Program was necessary because there are
no private mitigation banks offering wetland or stream credits in the
Roanoke River Basin at this time. Onsite mitigation and offsite mitigation
opportunities were not explored because the In -Lieu Fee option was
available.
Construction of the proposed Landfill expansion, WAB and EAB excavation,
and development of three borrow areas will have no effect on federally
protected species and is not expected to influence cultural resources or
historic properties. The proposed action should have no effect on
environmental justice for the surrounding residential communities; is not
expected to impact noise -sensitive land uses; and is not expected to impact
air quality locally or regionally.
Please give a couple of dates you are available for a meeting.
10/24/2020
Please attach the documentation you would like to have the meeting about.
Draft Duke Roxboro IP 09.01.20.pdf 1.81 MB
Duke Roxboro IP Figures_REDUC 8-31-20.pdf 4.84MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
cs�rrt� t�a�
Submittal Date 9/24/2020