Loading...
HomeMy WebLinkAbout20201283 Ver 1_PreFiling Email 30-Day Clock Reached_20201025Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, October 25, 2020 12:01 AM To: richard.harmon@woodplc.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill Project - Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill Project - 20201283 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill Project that you submitted on 9/24/2020. The ID number for that project is 20201283, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201283 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 9/24/2020 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Dicky Harmon richard.harmon@woodplc.com Duke Energy Roxboro Steam Electric Plant Roxboro Ash Basin Landfill Project Duke Energy Person Street Address 1700 Dunnaway Road Address Line 2 Qty Semora Fbstal / Zip Code 27343 State / Rovince / Fbgion North Carolina Country USA Is this a transportation project?* Yes c: No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification * Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below.* Duke Energy has developed closure plans for the WAB and the EAB at the Roxboro Plant for the disposal of CCR from each ash basin into the existing onsite industrial landfill and planned I landfill expansion. Duke Energy proposes to permit and build an 80-acre landfill expansion (the "project site" for this assessment) capable of containing the estimated 14.1 million cubic yards of CCR from the adjacent ash basins to support the closure by excavation plans. To complete construction of the proposed Landfill expansion, excavate the WAB and EAB, and develop three borrow areas, permanent impacts to wetlands and streams will be necessary. Wetland impacts will be limited to the Landfill expansion, the WAB and Borrow Area 1. The proposed total wetland impact is 0.75 acre. Stream impacts will be limited to the Landfill expansion, the WAB, Borrow Area 1, and Borrow Area 8. The proposed total stream impact is 3,066 linear feet. Since the Roxboro Plant in not located within a river basin subject to state riparian buffer regulations, there will be no impacts to state regulated riparian buffers within the project site. Based on the review of the mitigation options available, it was determined that credit purchase through the North Carolina Division of Mitigation Services (NCDMS) In -Lieu Fee Program was necessary because there are no private mitigation banks offering wetland or stream credits in the Roanoke River Basin at this time. Onsite mitigation and offsite mitigation opportunities were not explored because the In -Lieu Fee option was available. Construction of the proposed Landfill expansion, WAB and EAB excavation, and development of three borrow areas will have no effect on federally protected species and is not expected to influence cultural resources or historic properties. The proposed action should have no effect on environmental justice for the surrounding residential communities; is not expected to impact noise -sensitive land uses; and is not expected to impact air quality locally or regionally. Please give a couple of dates you are available for a meeting. 10/24/2020 Please attach the documentation you would like to have the meeting about. Draft Duke Roxboro IP 09.01.20.pdf 1.81 MB Duke Roxboro IP Figures_REDUC 8-31-20.pdf 4.84MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature cs�rrt� t�a� Submittal Date 9/24/2020