Loading...
HomeMy WebLinkAbout20201528 Ver 1_PreFiling Acknowledgement Email_20201026Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, October 26, 2020 7:07 AM To: kwilliams@lmgroup.net Subject: Pre -Filing Meeting Request Acknowledgement - TWSP 7 Sewer Force Main Improvements - 20201528 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for TWSP 7 Sewer Force Main Improvements that you submitted on 10/20/2020. The ID number for that project is 20201528, Version 1. Reviewer Contact Information: Reviewer: Robert Tankard Email: robert.tankard@ncdenr.gov Reviewing Office: Washington Regional Office - (252) 946-6481 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201528 Version* 1 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 10/20/2020 Contact Name * Kim Williams Contact Email Address* kwilliams@lmgroup.net Project Name* TWSP 7 Sewer Force Main Improvements Project Owner* City of New Bern c/o Jordan Hughes Project County* Craven Owner Address: Street Address 300 Pollock St Address Line 2 aty State / Frovince / Region New Bern NC Rbstal / Zip Code Country 28560 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Unsure of who has Craven County Please give a brief project description below. The project consists of constructing approximately 13,600 linear feet (LF) of 12-inch sewer force main, including four 320 LF to 2,100 LF directional bores, and replacement of the existing Pump Station #10 in New Bern, North Carolina. This project will remove a portion of the flow from the Township 7 community that is currently being pumped through an existing 8-inch force main. The project will also replace the existing Pump Station #10 with a flood -proof wet well and valve vault, and elevate controls above the 100-year base flood elevation. Public Trust Water areas (Trent River and Lawson Creek) will be directionally bored. Approximately 0.05 acre of temporary wetland impact is needed for one open cut area. Please give a couple of dates you are available for a meeting. 10/22/2020 10/23/2020 Please attach the documentation you would like to have the meeting about. TWSP 7 Sewer Wetland Map.pdf 2.91 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Cyr W,(lct Submittal Date 10/20/2020