HomeMy WebLinkAbout20201550 Ver 1_PreFiling Acknowledgement Email_20201023Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, October 23, 2020 12:11 PM
To: tbeasley@withersravenel.com
Subject: Pre -Filing Meeting Request Acknowledgement - Clayton WRF - 20201550 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Clayton WRF that you
submitted on 10/21/2020. The ID number for that project is 20201550, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201550
Regional Office*
Reviewer List*
Version* 1
Central Office - (919) 707-9000
Rick Trone
Pre -Filing Meeting Request submitted 10/21/2020
.....................................................................................................................................................................................................................................................
Contact Name * Troy Beasley
Contact Email Address* tbeasley@withersravenel.com
Project Name* Clayton WRF
Project Owner*
Project County*
Owner Address:
Town of Clayton
Johnston
Street Address
PO Box 879
Address Line 2
aty
Clayton
Fbstal / Zip Code
27520
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below.
The proposed project consists of construction of:
1) a new Water Reclamation Facility (WRF) that will replace the existing
Little Creek WRF which is undersized and outdated and will be
decommissioned. The proposed WRF site will be located at the existing
pump station along the Neuse River.
2) an access road to the new WRF site from North O'Neil Street along an
existing overhead high tension powerline easement
3) a new sewer line to convey flow from the existing Little Creek WRF within
the existing force main easement from the Little Creek WRF to the existing
pump station.
4) Upgrades to the existing outfall pipe within the Neuse River.
There are no anticipated wetland, stream or riparian buffer impacts for the
construction of the WRF site or the access road. There will be temporary
wetland and stream impacts for construction of the new sewer line within
the existing easement. The project is anticipated to be permitted under
either the existing NWP 12 or the proposed NWP-D.
An EA has been prepared for the project and is currently being reviewed
by NCDWI for approval.
Please give a couple of dates you are available for a meeting.
11 /9/2020
11 /10/2020
11 /12/2020
Please attach the documentation you would like to have the meeting about.
Figure 3 - Wetland -Buffer Determination
449.73KB
Exhibit.pdf
Figure 3 - Wetland -Buffer Exhibit.pdf 347.39KB
Fig 3 - Overall Wetland -Buffer Del Exhibit.pdf 1.27MB
pdF only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/21/2020