Loading...
HomeMy WebLinkAbout20201550 Ver 1_PreFiling Acknowledgement Email_20201023Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, October 23, 2020 12:11 PM To: tbeasley@withersravenel.com Subject: Pre -Filing Meeting Request Acknowledgement - Clayton WRF - 20201550 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Clayton WRF that you submitted on 10/21/2020. The ID number for that project is 20201550, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201550 Regional Office* Reviewer List* Version* 1 Central Office - (919) 707-9000 Rick Trone Pre -Filing Meeting Request submitted 10/21/2020 ..................................................................................................................................................................................................................................................... Contact Name * Troy Beasley Contact Email Address* tbeasley@withersravenel.com Project Name* Clayton WRF Project Owner* Project County* Owner Address: Town of Clayton Johnston Street Address PO Box 879 Address Line 2 aty Clayton Fbstal / Zip Code 27520 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below. The proposed project consists of construction of: 1) a new Water Reclamation Facility (WRF) that will replace the existing Little Creek WRF which is undersized and outdated and will be decommissioned. The proposed WRF site will be located at the existing pump station along the Neuse River. 2) an access road to the new WRF site from North O'Neil Street along an existing overhead high tension powerline easement 3) a new sewer line to convey flow from the existing Little Creek WRF within the existing force main easement from the Little Creek WRF to the existing pump station. 4) Upgrades to the existing outfall pipe within the Neuse River. There are no anticipated wetland, stream or riparian buffer impacts for the construction of the WRF site or the access road. There will be temporary wetland and stream impacts for construction of the new sewer line within the existing easement. The project is anticipated to be permitted under either the existing NWP 12 or the proposed NWP-D. An EA has been prepared for the project and is currently being reviewed by NCDWI for approval. Please give a couple of dates you are available for a meeting. 11 /9/2020 11 /10/2020 11 /12/2020 Please attach the documentation you would like to have the meeting about. Figure 3 - Wetland -Buffer Determination 449.73KB Exhibit.pdf Figure 3 - Wetland -Buffer Exhibit.pdf 347.39KB Fig 3 - Overall Wetland -Buffer Del Exhibit.pdf 1.27MB pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/21/2020