Loading...
HomeMy WebLinkAbout20052167 Ver 2_Approval Letter_20060714*~ l O~O~ WAT~9pG r ~ .-I © '.C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 14, 2006 DWQ Project # OS-2167, Ver. 2 Franklin County Denmark Construction Company, Inc. Attn: Mr. Matthew Winslow 416 U.S. Highway 1, Suite B Youngsville, NC 27596 Subject Property: Winston Ridge Subdivision UT to Horse Creek [030401, 27-17-(0.3), C, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Mr. Winslow: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.085 acres of wetlands, 961inear feet of perennial streams, 4,300 square feet (ft2) of Zone 1 protected Neuse riparian buffers and 3,050 square feet (ft2) of Zone 2 protected Neuse riparian buffers to construct the proposed residential subdivision at the subject property, as described within your application dated March 3, 2006, and received by the N.C. Division of Water Quality (DWQ) on March 21, 2006, with more information received by the DWQ on Apri124, 2006, June 2, 2006, and July 6, 2006. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) NW39 when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 15O1inear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: ~://h2o.enr.state.nc.us/ncwetlands None Caro na tura~y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper ~ i. Denmark Construction Company, Inc. "~ .,.4„ Page 2 of 5 ' ' - July 14, 2006 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved Units Plan Location or Reference 404/Wetland 0.085 acres PCN a e 8 of 12 Stream 96 linear feet PCN a e 8 of 12 Buffers -Zone 1 4,300 (s uare feet PCN a e 11 of 12 Buffers -Zone 2 3,050 s uare feet PCN a e 11 of 12 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all. construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233 and GC 3404; 6. Diffuse Flow (No Review) All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Denmark Construction Company, Inc. • ~ - Page 3 of 5 ' July 14, 2006 7. Culvert Installation Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 8. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 OversightBxpress Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Denmark Construction Company, Inc. Page 4 of 5 ~ ' ~ ~'. July 14, 2006 , Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786. Sincerely, G~z-~ Al n W. Klimek, P.E. AWK/ijm Enclosures: GC 3402 Certificate of Completion cc: USAGE Raleigh Regulatory Field Office Eric Kulz, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Jay Keller, Skelly & Loy, 6404 Falls of the Neuse Road, Suite 103, Raleigh, NC 27615 Filename: 052167Ver2 W instonRidgeSD(Franklin~01_NBR