North Carolina Department of Environment and Natural Resources
Pat McCrory John E, Skvarla, III
Governor Secretary
October 24,2014I.
Mr.Ronald Nalley _
Town of Montreat
P.O.Box 423
Montreal,NC 28757
Re: Well Construction Permit: WS0100059 -
Town of Montreal Property
Property PINS: 072112813100000 and 072122212400000
Buncombe County,NC
Dear Mr.Nalley,
In accordance with the request,submitted on your behalf by Mr. Steve Freeman,to extend the effective date
of the Town of Montreat's water supply well construction permit WS0100052,we are forwarding well
construction permit W S0100059 dated October 24,2014, issued to the Town of Montreat.The permit is for
the construction of up to three additional water supply wells in accordance with the application submitted
February 27,2009.
The permit will be effective from the date of issuance and is subject to the conditions and limitations as
specified therein. Please review the attached permit conditions.
If you should have any questions or need additional information contact Andrew Moore at 828-296-4500.
Sincerely,
G.Landon Davidson,P.G.
Regional Supervisor
Water Quality Regional Operations Section
cc: ARO/file
Tracy Shinn,Buncombe County Environmental Health Department
NCDENR Public Water Supply Section,ARO
North Carolina Division of Water Resources—Ashevllle Regional Once
209011.S,Highway 70,SWannanoa,N.C. 28778
Phone(828)296-4500
FAX (828)299-7043
Intemet h1lpllporialaccencorglwelpkc/
An Equal OpporlunitylAarmalive Acton Employer
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF A WATER SUPPLY WELL OR WELL SYSTEM
(Wells or Well Systems with a Design Capacity of 100,000 Gallons Per Day or Greater)
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws,
Rules and Regulations:
PERMISSION IS HEREBY GRANTED TO
Town of Montreat
FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM consisting of up to three water supply wells on property owned
by the Town of Montreal(PIN Nos.072112813100000 and 072122212400000).This Permit is issued in accordance with the application
received on February 27,2009,in conformity with specifications and supporting data,all of which are filed with the Department of
Environment and Natural Resources and are considered integral parts of this Permit.
This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation.
This Permit does not constitute approval of a site, for which the Public Water Supply Section may require additional information or
approval of the proposed volume of water to be withdrawn,within an area defined as a Capacity Use Area,regulated by the Division of
Water Resources.
Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and
Standards(15A NCAC 02C .0100),and other State and Local Laws and regulations pertaining to water supply well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written
request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the
North Carolina General Statutes and filed with the Office of Administrative Hearings,6714 Mail Service Center,Raleigh,North Carolina
27699-6714. Unless such a demand is made,this Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or
exceptions as follows:
1. A well test for yield shall be conducted in accordance with 15A NCAC 02C.0I 10(b)and the results of that test
shall be submitted to the Division of Water Resources Regional Office within 30 days of the test conclusion.
2. Each well shall have a Well Contractor Identification Plate and a Pump Installation Information Plate in
accordance with 15A NCAC 02C.01070)(2)and(3).
3. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources
Information Processing Unit within 30 days of the well completion.
4. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113
and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources Information
Processing Unit within 30 days of the well abandonment.
Permit issued the 24th day of October,2014
FOR THE NORTH CAROLINA ENV RONMENTAL MANAGEMENT COMMISSION
Landon Davidson,Regional Supervisor
Water Quality Regional Operations Section
By Authority of the Environmental Management Commission
Permit No. # WS0100059