HomeMy WebLinkAbout20201307 Ver 1_Pre-Filing Meeting Request_20200925ID#* 20201307
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 9/25/2020
....................................................................................................................................................................................................................................................................................................
Contact Name * Lorilei DeSilva, Beth Mosteller
Contact Email Address* jaydesilva3@gmail.com, sbmosteller@icloud.com
Project Name* Suresh J & Lorilei DeSilva
Project Owner* Suresh J & Lorilei DeSilva
Project County* Iredell
Owner Address: Street Address
1605 Mt Isle Harbor Drive
Address Line 2
aty State / Frovince / Region
Charlotte North Carolina
Rbstal / Zip Code Country
28214 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
along shoreline 130 feet stacked stone, river rock transition, 222 feet
enhanced boulder Class A with boulders plantings, some trees to be
removed that have exposed root system
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
�ar.14
Submittal Date 9/25/2020