From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Wednesday, October 21, 2020 1:34 PM
To: David.E.Bailey2@usace.army.mil; Homewood, Sue
Cc: Pete Goria; Alex Elkan; Patrick Smith; Allan Hill
Subject: [External] RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9,
McLeansville, Guilford County; SAW-2018-02038 - WETLANDS MONITORING (S&EC
13795)
Follow Up Flag: Follow up
Flag Status: Flagged
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
nc. ov
Dave & Sue:
Patrick Smith will be the point of contact for S&EC from this point forward as he'll be managing the
monitoring work for Mr. Goria. I know you know Patrick, but below is his contact information in case
you need it.
PATRICK K. SMITH, PE, LEED®AP
President/Principal
Soil & Environmental Consultants, PA
Direct (919) 256-4541
Mobile (919) 302-5783
psmith@sandec.com
BOB ZARZECKI
Wetlands Department Manager/Principal
Soil & Environmental Consultants, PA
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Wednesday, October 21, 2020 1:20 PM
To: Bob Zarzecki <bzarzecki@sandec.com>
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>; sue.homewood@ncdenr.gov
Subject: RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford County; SAW-2018-
02038 - WETLANDS MONITORING (S&EC 13795)
Thanks Bob, I very much appreciate the detailed response. I look forward to the as -built. Please let me know if there are
any questions in the meantime.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
1
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Wednesday, October 21, 2020 1:14 PM
To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil>
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>; sue.homewood@ncdenr.gov
Subject: [Non-DoD Source] RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford
County; SAW-2018-02038 - WETLANDS MONITORING (S&EC 13795)
Dave
Yes, Patrick and I visited the site on October 61". We met with Mr. Goria and the contractor performing
the work. They had removed the majority of the fill from the pond bottom at the time of our site visit
and were still actively working on the site. They hit what they believed to be the original pond bottom
which prompted them to request the site visit with us to confirm. We agreed that they were at the
original pond bottom, as we could easily see what appeared to be old submerged stumps, roots and
the original pond bottom soils. They continued to remove the remainder of the fill after we left using
these visual clues and elevations as a guide. They completed the work last week and Mr. Goria took
the pictures which he provided to us and I sent to you yesterday. I anticipate the as -built survey (as
described below) to further confirm our belief that all of the fill has been removed from the pond
bottom.
BOB ZARZECKI
Wetlands Department Manager/Principal
Soil & Environmental Consultants, PA
From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil>
Sent: Wednesday, October 21, 2020 12:29 PM
To: Bob Zarzecki <bzarzecki@sandec.com>
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>; sue.homewood@ncdenr.gov
Subject: RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford County; SAW-2018-
02038 - WETLANDS MONITORING (S&EC 13795)
Thanks Bob. The work looks good. Were you able to do a site visit to confirm that the fill was removed down to the
appropriate level based on the approved wetland restoration plan?
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: Blockedhttp://corpsmapu.usace.army.miI/cm apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Tuesday, October 20, 2020 3:31 PM
To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; sue.homewood@ncdenr.gov
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>
Subject: [Non-DoD Source] RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford
County; SAW-2018-02038 - WETLANDS MONITORING (S&EC 13795)
Dave
See attached photos that Pete provided over the weekend. The low darker soil area is the graded
pond bottom. The brighter compacted soil is the side slope.
BOB ZARZECKI
Wetlands Department Manager/Principal
Soil & Environmental Consultants, PA
From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil>
Sent: Friday, October 16, 2020 3:03 PM
To: Bob Zarzecki <bzarzecki@sandec.com>; sue.homewood@ncdenr.gov
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>
Subject: RE: Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford County; SAW-2018-
02038 - WETLANDS MONITORING (S&EC 13795)
Hi Bob, and thanks for your email. I have itemized the Corps' responses below:
Assumption 1: Yes, limiting the as -built topographic data to the fill removal area and roughly 10 to 15 feet outside of the
limits of the fill removal limits should be fine, as long as that "area roughly 10 to 15 feet outside of the limits of the fill
removal limits" is representative of the natural pond bottom prior to the unpermitted fill.
Assumptions/Actions 2 and 3: The Corps concurs.
Would it be possible for you to provide pictures of the pond bottom where the unpermitted fill has been removed?
Thanks
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David. E.Bailey2@usace.army.miI
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Thursday, October 15, 2020 9:37 AM
To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; sue.homewood@ncdenr.gov
Cc: Pete Goria <petegorial@gmail.com>; Alex Elkan <AELKAN@brookspierce.com>; Patrick Smith
<psmith@sandec.com>; Allan Hill <ahill@triad-designgroup.com>
Subject: [Non-DoD Source] Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9, McLeansville, Guilford
County; SAW-2018-02038 - WETLANDS MONITORING (S&EC 13795)
David & Sue:
On behalf of the permittee, we are providing you a brief update on this project.
The permit approvals for this project included conditions that restoration work (removal of fill from the
approximately 1.58-acre area pond bottom, etc.) was to "be completed within 120 days of receipt of
all necessary federal, state and local approvals/permits".
The DWR approval was dated April 13, 2020 and the USACE approval was dated April 21, 2020. The
permitted work required a modification of the DEMLR erosion and sedimentation control (ESC) plan.
This permit modification approval was received on August 25, 2020 (copy attached).
As of today, the non -permitted fill has been removed from the pond bottom. The fill was removed to
the extent and depth of the original pond bottom which was identified in part by the evidence of
stumps, soil color, and other indicators of a drained pond bottom, along with the estimated elevation
identified within the permit documents.
The next step will be to breach the pond dam and stabilize the entire area (seed and mulch).
The project engineer is coordinating the dam breach with DEMLR staff. Any potential changes to the
breach plan provided in the permit documents will be provided to the USACE and DWR. DEMLR may
be reaching out to DWR to ensure the sequencing of the dam breach is acceptable.
We provide the follow assumptions/actions and ask for your confirmation of them.
1. Regarding the as -built, we understand that the USACE is looking for "...an as -built survey
to ensure that target elevations were met, including comparisons with elevations of
those areas within the pond bottom that were not filled or graded." We are assuming
that the permittee will only need to survey the approximate red boundary shown on the
attached drawing and that they don't need to survey the entire pond bed. This would
include getting topographic data roughly 10 to 15 feet outside of the limits of the fill
removal limits shown on the attached drawing. Please confirm this assumption is
correct.
2. We assume that this as -built survey does not need to extend down to the dam and can
be truncated to only show the area upstream (to the west) of the dashed orange line on
the attached drawing. Please confirm that our understanding is correct.
3. The site contractor has recommended the application of a temporary seed mix
(contractor grass seed blend, e.g., rye, etc.) at the same time that the wetland seed mix
is applied and mulched. This is consistent with other wetland restoration efforts that
S&EC has done in the past to ensure a quick stabilization of the area prior to the
emergence of the wetland species. Please confirm that this is acceptable to the USACE
and DWR.
Please contact me if you have any questions or would like to visit the site.
Sincerely,
BOB ZARZECKI
Wetlands Department Manager/Principal
Soil & Environmental Consultants, PA
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
Office (919) 846-5900
Direct (919) 256-4517
Mobile (919) 270-2068
bzarzecki@sandec.com
Visit us at sandec.com
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This
electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included
herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's
original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is