Loading...
HomeMy WebLinkAbout20201230 Ver 1_Shoreline Stabilization_20201023Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/22/2020 8:01:07 AM (Submittal) Submit by Montalvo, Sheri A 10/23/2020 1:53:20 PM (Non -DOT - Approver) • The task was assigned to Montalvo, Sheri A 10/22/2020 8:01 AM Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. (First click here is the EPA Clean Water Act, second click here will be the form Pre Filing Meeting.) Attach documentation of Pre -Filing Meeting Request here: Meeting Request Form.pdf 431.52KB Pre -fling Meeting or Request Date 9/21/2020 ID# 20201230 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * stephen.deutsch@me.com Rease provide an err -ail address for payment and requests for pure infornation here. Owner Information: Name: * Stephen Deutsch Email: * stephen.deutsch@me.com Phone Number:* (704)771-6722 (xxx)xxx-xxxx Mailing Address:* Street Address 16100 Weatherly Way Address Line 2 city State / Frovince / Region Huntersville NC Rbstal / Zip Code Country 28078-8953 US Is there an agent working on the project?* Agent/Consultant Information ...................................................................................................... Name: * Company Affiliation:* Email: * Phone Number:* Mailing Address:* a Yes O No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (xxx)xxx-xxxx Street Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Postal / Zip Code 28115 Asigned and dated copyof the Agent Authorization letter:* Auth. Form.pdf 205.74KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Deutsch Property State / Province / Fegion NC Country United States If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Upload Map: Survey.pdf Vicinity Maps.pdf Directions.pdf Latitude:* 35.441653 407.1 KB 2.51MB 251.36KB Longitude:*-80.914833 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 322.91KB Buffer Form.pdf 366.47KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shoreline Pics.pdf 1.56MB 4. Location of the property (where work is to be conducted) Nearest Town:* Huntersville County:* Mecklenburg Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 16100 Weatherly Way Huntersville, NC 28078 PID # 00145295 hclude phasellot nunber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Take E Statesville Ave to E Center Ave 1 min (0.2 mi) Head west toward E Statesville Ave 246 ft Turn left toward E Statesville Ave 197 ft Turn left onto E Statesville Ave 0.1 mi Take NC-115 S, I-77 S and NC-73 W to Terry Ln in Huntersville 22 min (14.2 mi) Turn right onto E Center Ave 0.4 mi Turn left onto S Church St 0.5 mi Turn right onto College St 0.1 mi Turn left onto S Main St 1.2 mi Continue onto NC-115 S 2.1 mi Turn right onto Langtree Rd 1.1 mi Use the left 2 lanes to turn left to merge onto I-77 S/US-21 S Continue to follow I-77 S 5.9 mi Take exit 25 toward Concord/Huntersville 0.3 mi Turn right onto NC-73 W/Sam Furr Rd Continue to follow NC-73 W 2.6 mi Follow Terry Ln and North Point Rd to Weatherly Way 3 min (0.8 mi) Turn right onto Terry Ln 0.3 mi Turn right onto North Point Rd 0.3 mi Turn right toward Weatherly Way 249 ft Turn right onto Weatherly Way 0.2 mi 16100 Weatherly Way Huntersville, NC 28078 Aease include road narres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Pesidential, undeveloped, etc. 6. Property Size 0.739 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Install fresh layer of VA Fieldstone rip rap on existing shoreline. 8. How will the work be done?* r From Land rJ From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 6' below (390 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 1' above (65 sf) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Grass buffer, no trees removed, no disturbance to buffer. Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:' Janice Estep Signature: [rrr�.v'�r/ra �53�u�.rr.cT.dwaa:.� Initial Review Is this accepted into the review process?* Project Number:* 20201230 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. STREET ADDRESS: PLAN NO. PARCEL ID: Ooj!4 1J A Q5' Please print: Property Owner:..�j3� Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize of C,' t�C. (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached, Property Owner's Address (if different than property above): Telephone: 10—LI - II j - tiz_3 -A,%_ We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Authorized Signature Date: ►o�a0 Date: I. Oary1 W- Lang, certify that this mop was drown under my .�\A �ARp� 0�. " Sf �y N. 7 Lper ' -on from on aclpRl Survey made Lnder my supervision; that the erol of closure os calculated by latitudes and departures ;s greater than 1110,000+. That the deeds and mops noted r used os references mot the boundaries not surtryed ore dearly Tndi-t dd as drown from information Indicated; that this plat was -.III L-4912 OIL W L� prepare n accardonae with G5. 47--30 as ameadad. WAneee my hood and Saul this _ day at Wit -1 "�� Ooryl W. Long PLS SiJn,eyor L-4918 GRAPHIC SCALE m 0 1. LA NOIRMAN y�.26 1 2" PPE mo f IN FSRT ) EonZ. 1 tmh 20 Fl ELOCATED ,,S89'28'46"E 107.60' 760 CONTOUR. OUR, 1 GAZEBOS LA ��Nn 1` p40 3.4PATIO 5.1 55.B J y 6ry o o .1 y 3. ? 113 31.5 ry. m y 2 STORYs 5.4 0a aO _ ,ov'oR N 17z.s LOT 1 Z eK�, 20.624 ACRESCONC. DRIVE SEE NOTE N ID FOR SEPTIC DRAIN FlELD EASEMENT i 1/�''• PIPE nE ONLI� ---- ------ -- r N88'41'S1"W Nt6'tt'37"w i I" PIPE 184.8T #4 REBAR � OLD LOT LINE PER UNREL'ARpED MAP BY R.B. PHpRR — L NONCGSMONUMENTFDJNDWCTHINI40F!' HATED MAY 9, 195H, (REVISED OCTOBER 5, lam) O R 3GHPROPFRfYMpYB€SwyBETO DTHER[OVENANTE, RESTAICDONS, EASFAREHTS DR i5,p>`wpYTlwifAAV Sf OF RE[ORp. ��\��\ 3, ALLDISTANCE3 SHOWN ARE SV RFACE xppZONTPt piST- '� CON C 4, IRON PINS FOUND OR SETAT p PRO— EDRNERE UNLESS OTH RWISENDIEO. DRIyEE — 5. ALL ARFAB SHOWN WERE HEREON WMPIttED llSIIRG THE cOaRDwATE [AMPUTATION METHOD. T MEEAIS d i7,9S1.5SQFT.OR0.522AGBEs. \ ` 6- THE PRDFEHTY f5 LIXATEO IN TOWN OF HUNIERSMLIF, MECMENRURGCOUxrv, C ..C. ODI-452-58 I'IRDN PIPE ]-14u)P€RTY ISmNE➢1GRIGENERALRE5DENT&MMECKIENBVRGC Uu G4 \ RICHARD E. KILLOIJGH KAY K. KILLCUCH B. PORTION OF -WELT PAOPERi1't LOCATED W—N A SPECIAL RWD HAZARD ARE DE15992 PG 249 AC NNG TO FEMA FWOG INSURANCE RATE MAP-CAMMUNM PANEL e3T1p4B2]ODJ EFFECTNE DATE: B/a)J]M 9 CONSULT WITH GOVERNING AGENCY FOR PREVAILING LAND NEVFLDP n i MEN ANR $DNING EEfIVIREMENTS PRIOR TO DESIGN OR CONSTRUCTION OFArvx IMPRDVEM€NTS- 1 Fm4a4VNxYFtDans[MeNT iaP TAx io aax-0xusPen arvPecoaoeo Met ev A.9 FHARR DATE D MAY 9, 19861PEVISED MARCH la, 1R691, AND PER RFEn saps N42] w- ARE VATEv DELEMBBR 13, 1990. IL JOIN1'I RIVI- YESSFMETUT PER DEEDB00%B422 RAGE M3, AND SHOWN ON CONC. UNRECORDED MAP BY R.B. PHARR DATED MAY 9, 19R8(REVISED MARCH 10, 1Rav)- A DRIVE POATION OF THE—VEWAY EASEMENT OVERLAPS Wli}i TH E ABDVE REi PEN 60 STATICORAINFIEly EASEMENT, ^� 12_ UNREOORWO DOCOME 'NO MAPS PROVIDED BY FORMER OWNER GAW EANGELOSI. w ca LEGEND ! PROPERTY CORNER AS LABLED O N I z #4 REBAR SET © $ 1 COMPUTED POINT • JI / EXISTING NAIL Q LIGHT POLE COpIL. LINES NOT SURVEYED E *RIVE DRAIN FIELD EASEMENT 7771 hT x 1.7• -- BRICI( COLUMNS�� DRIVEWAY EASEMENT #4 REBAR FOUND TIE ONLY N8B'42'49'E 77.16' I OVERLAP OF DRAINFFELD EASEMENT \ I AND DRIVEWAY EASEMENT 001-452-41 JAMES M_ ARCHER KAY C. ARCHER �[E OFT ' DB 5034 PG 411J pNVEN'` �h tie 001-452-05 JOHN F. YOUNGDLOOD. III NTTA W_ YCUNGBLOOD ` OO 18516 PG 1114 CONIC. DRIVE l` DRIVE Vlll #4 REBAR ` I� 1� CONC. DRIVE DRILL HOLE , I SEE NOTE ,y 11 FOR SEPTIC bRIVEWAY EASEMENT \ N\ 17-08 may' yo w� ` g4 REDAR FOUND f Iqg� 1" PIPE L0 NO { v ` WEA THERL Y WAY l `1 60' PUBLIC R/W ROAD WIDTH VARIES i- w La 9 W I, CR CD m co C rn � r' o a c� m a� L- VI �► C � Ol M D O M c n = C7 o [_fi m [] 1 _ .... m ID V q [n b N m C q cocn 3 v t" ro s 0 m ro CL ° o o � m EL O 3 � C � N � O m 5' � N L w? Li L ao�oa�, ScN3�p C= G a n a o m 63 o a z C C ? m 3 �o 3 z eo a n { O Q O O p `C ZE a d m O 3 � o- Cr �[ q Oi ➢f ro •c N 6 6 N N W W Full Pond/ Normal Water Level ' T ' ' Shoreline vo(:K Lake (At FuIf Pond/Normal Water Level) is, 6eA0tXJ K Co 51 I' "oQe- )( 65 1` OL) S e— ♦ 6 5 y ■��� � No -}-reel re -waved Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM 38018 Project Name/address: County: C 1 _p top Owner: Print Contractor/agent: Print attire The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (S)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake_ [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification 1, hereby state that I have been informed of the Catawba Riparian Bu er Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner . Date:—`f } r wi g "'8 Sim tot �a �, gg !f F a Olt I f