Loading...
HomeMy WebLinkAboutNCC190372_Flow Acura Final Inspection Release Report_20201023SEDIMENTATION INSPECTION REPORT New Hanover County Engineering Department 230 Government Center Drive - Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910)-798-7139 Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist Email. • bwetherill@nhcgov.com Project Name & Location: Flow Acura —4952 New Centre Dr. Grading Permit #: 63-94 Revision 4 Financially Responsible Party & Address: Flow 4951 New Centre, LLC — 500 West Fifth St., Ste.1800 Winston Salem, NC 27101 Pictures: ❑ Yes ® No Weather & Soil Conditions: Sunny Dry 85F Inspection Type: ❑ Initial ❑ Periodic ® Final ❑ Complaint Date Report Sent: 6/8/2020 Contact Made With: N/A Inspection report to be sent/given, including financially responsible party: Donald Flow — dflowl2floauto.com / Richard Kern — rkern(@magnoliaconstruction.com / Chance Barnes—cbarnes@magnoliaconstruction.com Has this project been issued and NOV? ❑ Yes ® No Potential NPDES violation? ❑ Yes ® No Degree: Choose an item. NPDES Type: Choose an item. Is there offsite sediment? ❑ Yes ® No Degree: Choose an item. Location: Click or tap here to enter text. Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for the site to remain in compliance with the Erosion and Sedimentation Control Ordinance: ® N/A Part2: Please take corrective action for the following items prior to next periodic inspection for the site to remain in compliance with the Erosion and Sedimentation Control Ordinance: N N/A Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination, if applicable. Report by: Beth Furr Date of Inspection: 6/3/2020 Others Present: N/A Lfurr2nhcgov.com Pictures: N/A Contact this office with any questions and/or comments about this report and/or project.