Loading...
HomeMy WebLinkAboutNC0088404_More Information (Requested)_20201022 October 22, 2020 David Gray, Manager Bright Water LLC 378 Ambler School Rd Marietta, SC 29661 Subject: Request for Additional Information NPDES Permit NC0088404 The Rapids at French Broad Buncombe County Dear Mr. Gray: The Division has reviewed your application for you N PDES permit . To enable us to complete our review in accordance with N.C.G.S. 143-215.1 and 15A NCAC 2H .0105, please provide additional or revised information to address the following comments: • In accordance with 15A NCAC 2H .0105 (c), complete an updated Engineering Alternatives Analysis (EAA). The Division requires applicants to fully document and exhaust all alternatives to surface water discharge. The EAA should include boring logs and/or other inf ormation indicating that a subsurface system is neither feasible nor practical as well as written confirmation indicating that connection to a POTW is not an option. For the non-discharge alternatives, please demonstrate whether or not the physical size of the site is prohibitive, and whether or not the resulting loading rate is prohibitive based on-site specific soil conditions. For your reference, the "Engineering Alternatives Analysis (EAA) Guidance Document" is enclosed. Please complete and return the Attachment A Local Governments Review Form (page 8). The EAA should also include a present value of costs analysis as outlined in the Division's EAA guidance. Each alternative should be thoroughly evaluated, and each conclusion should be substantiated by appropriate documents and itemized budgets demonstrating that alternatives are cost prohibitive. Review of our records indicated that an Authorization to Const ruct (ATC ) Permit has not been applied for since NPDES permit NC0088404 was originally issued on July 6, 2007. I n Accord ance with 15A NCAC 02H .0138 (a)(3), the following requirement applies to this permit : If an Authorization to Construct has not been applied for in accordance with the requirements of the NPDES permit during the term of the permit, the permit will be considered void upon expiration and future actions will be considered as a new application. Since there has been no ATC application received for this facility , the permit application received on May 20, 2020 will be processed as a new permit application. The term “new” is defined in accord ance Mr. Gray October 21, 2020 Page 2 of 2 with 15A NCAC 02H .0103 (16). To process the application as a new application, an updated EAA will be required. Once the EAA is approved by the Division , a draft permit can be submitted to public notice. I f no response is received within 60 calendar days [per 15A NCAC 2H.0107(b)], the project will be deactivated and withdrawn from our review process and the documents recycled. If you have questions concerning the draft, please contact me at 919-707-3618, or via e-mail at derek.denard@ncdenr.gov. Sincerely, Derek Denard, Environmental Specialist NPDES Compliance and Expedited Permitting Division of Water Resources, NCDEQ Enclosure: Engineering Alternatives Analysis (EAA) Guidance Document ec: NPDES File [Laserfiche] David Gray, Bright Water LLC [dave@usbob.com] ARO / Tim Heim [Tim.Heim@ncdenr.gov]; Landon Davidson [landon.davidson@ncdenr.gov]; Linda Wiggs [linda.wiggs@ncdenr.gov]