Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3200601_01_SpeedwaySubstation_CivilDrawings_2020-10-16_20201020
SPEEDWAYSUBSTATIONPREPARED FORSWINERTONCOVER SHEETC0.0©PROJECT TEAM GOVERNING AGENCIES GENERAL INFORMATION VICINITY MAP CIVIL CONSTRUCTION DRAWINGS FOR SPEEDWAY SUBSTATION 2410 WALLACE ROAD, MIDLAND, NORTH CAROLINA 28107 CABARRUS COUNTY, NC PARCEL PIN: 55432835280000 SITE PROJECT SITE EROSION CONTROL NOTES Know what's below. before you dig.Call R LANDOWNER EARTHWORK QUANTITIES NORTH SHEET LIST TABLE SHEET NUMBER SHEET TITLE REQUIREMENTS FILL COMPACTION REQUIREMENTS DESCRIPTION FREQUENCY OF DENSITY TESTS MAY BE DECREASED OR INCREASED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER OF RECORD BASED ON THE UNIFORMITY OR DISUNIFORMITY OF TEST RESULTS SUBGRADE PREPARATION STRIP AND REMOVE EXISTING VEGETATION, ROOT SYSTEMS, ORGANIC SOILS, DEBRIS, AND ANY OTHER DELETERIOUS MATERIALS FROM PROPOSED ROADWAY AREAS AND WHERE MAT OR SHALLOW FOUNDATIONS WILL BE CONSTRUCTED. SUBSEQUENT TO THE SURFACE CLEARING AND GRUBBING EFFORTS, THE EXPOSED NATURAL SUBGRADE SOILS BENEATH PROPOSED ROADWAY AREAS AND MAT OR SHALLOW FOUNDATION AREAS SHOULD BE PROOF-ROLLED TO DETERMINE THE LOCATIONS OF ANY SOFT OR YIELDING SOILS THAT MAY REQUIRE REMOVAL AND REPLACEMENT. ADDITIONALLY, THE SUBGRADE SOILS BENEATH ROADWAYS SHOULD BE SCARIFIED, MOISTURE CONDITIONED AND COMPACTED TO A MINIMUM DEPTH OF TWELVE INCHES. THE MOISTURE CONTENT AND COMPACTION OF SUBGRADE SOILS SHOULD BE MAINTAINED UNTIL ROADWAY CONSTRUCTION. LIFT THICKNESS LOOSE LIFT THICKNESS OF 8 INCHES OR LESS Per the Modified Maximum Density Test (ASTM D1557) 1 Material Type and Location Approved imported engineered fill: Beneath substation foundations: MINIMUM COMPACTION (%) AND OPTIMUM MOISTURE CONTENTS FOR COMPACTION On-site native soils: Fill placed in array areas: Miscellaneous backfill: Compacted native soils for roadways: Utility trench subgrade and backfill1: Aggregate base (pavements): 85 85 90 85 95 -3% -3% -3% -3% -3% +3% +3% +3% +3% +3% 1Compaction requirements may be increased by the electrical engineer based on thermal resistivity analyses. Upper 12 inches should be compacted to 95% within structural areas. Low-volume change imported soils should be used in structural areas. ASTM D6938 Backscatter Method may be used for compaction testing in trenches in order to avoid damage to conductors. Frequency of tests may be increased or decreased at the discretion of the Geotechnical Engineer of Record. BENEATH SUBSTATION FOUNDATIONS: 1 TEST PER 2,500 SF PER LIFT WITHIN FILL SLOPES:1 TEST PER 2,500 SF PER LIFT RECOMMENDED DENSITY TEST FREQUENCY FILL PLACED IN ARRAY AREAS: 1 TEST PER 5,000 SF PER LIFT MISCELLANEOUS BACKFILL: 1 TEST PER 5,000 SF PER LIFT COMPACTED NATIVE SOILS FOR ROADWAYS: 1 TEST PER 1,000 LF UTILITY TRENCH SUBGRADE AND BACKFILL: 1 TEST PER 300 LF PER LIFT AGGREGATE BASE FOR ROADWAYS: 1 TEST PER 1,000 LF NOTES: THE FILL COMPACTION REQUIREMENTS AND ROADWAY RECOMMENDATION TABLES ARE FOR REFERENCE ONLY. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PREPARED BY TERRACON CONSULTANTS, INC. FOR ALL GEOTECHNICAL REQUIREMENTS AND RECOMMENDATIONS. Minimum Compaction Requirement (%) Range of Moisture Contents for Compaction (% over optimum) Minimum Maximum ASTM D6938 BACKSCATTER METHOD SHALL BE USED FOR COMPACTION TESTING IN TRENCHES IN ORDER TO AVOID DAMAGE TO CONDUCTORS LIFTS FOR FILL SLOPES MUST BE PLACED HORIZONTALLY. BENCHING IS REQUIRED WHEN TYING-IN TO ANY EXISTING SLOPE OF 5:1 (H:V) OR STEEPER. MINIMUM BENCH HEIGHT SHALL BE 4 FEET, AND A SHEAR KEY IS REQUIRED AT THE TOE OF THE SLOPE, WITH A MINIMUM SHEAR KEY DEPTH OF 2 FEET AND MINIMUM WIDTH OF 15 FEET, WITH THE BASE OF THE KEY EXCAVATION BEING SLOPED A MINIMUM OF 2% DOWNWARD TOWARD THE EXISTING SLOPE. THE NEED FOR A BACK DRAIN SHOULD BE EVALUATED BY THE GEOTECHNICAL ENGINEER OF RECORD WHERE THERE IS POTENTIAL FOR SHALLOW GROUNDWATER, ELEVATED MOISTURE INFILTRATION, OR PERCHED WATER CONDITIONS. ROADWAY RECOMMENDATIONS COMPACTED NATIVE SOILS ACCESS ROAD DESIGN RECOMMENDATIONS: BASED UPON THE SOILS CONDITIONS ENCOUNTERED IN THE TEST BORINGS, THE USE OF ON-SITE SOILS FOR CONSTRUCTION OF ON-SITE ROADS IS CONSIDERED ACCEPTABLE. CONSTRUCTION OF THE UN-SURFACED NATIVE ROADWAYS SHOULD CONSIST OF A MINIMUM OF 12 INCHES OF COMPACTED ON-SITE SOILS. 95 -3%+3% MATERIALS AND CONSTRUCTION OF ROADWAYS FOR THE PROJECT SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) OR THE APPLICABLE LOCAL GOVERNING BODY. WITHOUT THE USE OF ASPHALT CONCRETE OR OTHER HARDENED MATERIAL TO SURFACE THE ROADWAYS, THERE IS AN INCREASED POTENTIAL FOR EROSION OF THE ROADWAY TO OCCUR. THE UN-SURFACED ROADS ARE EXPECTED TO FUNCTION WITH PERIODIC MAINTENANCE. NOTE: THE FILL COMPACTION REQUIREMENTS AND ROADWAY RECOMMENDATION TABLES ARE FOR REFERENCE ONLY. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PREPARED BY TERRACON CONSULTANTS, INC. FOR ALL GEOTECHNICAL REQUIREMENTS AND RECOMMENDATIONS. SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGENERAL NOTESC0.1©GENERAL NOTES:EROSION CONTROL NOTES GENERAL EROSION CONTROL GRADING:PHASE 1 CONSTRUCTION SEQUENCE PHASE 2 CONSTRUCTION SEQUENCE SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGENERAL NOTESC0.2©” “” ” GUIDELINES FOR SITE DEVELOPMENT OF DUKE ENERGY SUBSTATIONS: ” ”” ” “” “” ” ” “” ”” ” ” ”“”” ”” ·”“”” ”“” ·” ·” · · ·” · · · GUIDELINES FOR ACCESS DRIVES OF DUKE ENERGY SUBSTATIONS: “” “ “” “”“” “” “ ”“” “” DUKE ENERGY ELECTRIC TRANSMISSION RIGHT-OF-WAY GUIDELINES/ RESTRICTIONS VALID FOR NORTH CAROLINA AND SOUTH CAROLINA: TT IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEXISTINGCONDITIONS ANDDEMOLITION PLANC1.0©Know what's below. before you dig.Call R DEMOLITION LEGEND NORTH TT IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONPHASE 1 EROSIONCONTROL PLANC2.0©EROSION CONTROL LEGEND NPDES GROUND COVER SELF MONITORING AND INSPECTION NOTIFICATION Know what's below. before you dig.Call RNORTH TT IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONPHASE 2 EROSIONCONTROL PLANC2.1©NPDES GROUND COVER SELF MONITORING AND INSPECTION NOTIFICATION EROSION CONTROL LEGEND Know what's below. before you dig.Call R NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.2©01TEMPORARY SILT FENCE ⁰ 02SILT FENCE OUTLET 06TEMPORARY CONSTRUCTION ENTRANCESFSFSFSF CONCRETE WASHOUT CONCRETE WASHOUT STATION 04 05 SEDIMENT BASIN 03 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.3©01SKIMMER SEDIMENT BASIN 02TEMPORARY DIVERSION DITCH SECTION A PLAN VIEW 03 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.4©SKIMMER BAFFLE XX NCDEQ TEMPORARY SEEDING RECOMMENDATIONS · · · · · TEMPORARY SEEDING RECOMMENDATIONS - LATE WINTER/EARLY SPRING TEMPORARY SEEDING - FALLTEMPORARY SEEDING - SUMMER 03 02 01 RIP-RAP STABLE CONVEYANCE INTO BASIN 04 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.5©XX SURFACE ROUGHENING AND SLOPE TRACKING DETAIL “” 02BENCHING / KEYING SLOPES DETAIL 01 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.6©CHANNEL INSTALLATION DETAIL Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of RECPs extended beyond the up-slope portion of the trench. Use ShoreMax mat at the channel/culvert outlet as supplemental scour protection as needed. Anchor the RECPs with a row of staples/stakes approximately 12"(30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" apart across the width of the RECPs. 3.Roll center RECPs in direction of water flow in bottom of channel. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.Place consecutive RECPs end-over-end (Shingle style) with a 4"-6" overlap. Use a double row of staples staggered 4" apart and 4" on center to secure RECPs. 5.Full length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes approximately 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. 6.Adjacent RECPs must be overlapped approximately 2"-5" (5-12.5cm) (Depending on RECPs type) and stapled. 7.In high flow channel applications a staple check slot is recommended at 30 to 40 foot (9 -12m) intervals. Use a double row of staples staggered 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. 8.The terminal end of the RECPs must be anchored with a row of staples/stakes approximately 12" (30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 6 2 4 12"(30cm) 6" (15cm) 6" (15cm) 4"-6" (10-15cm) 8 6" (15cm) 5 7 4"(10cm) 3 1 A B C A B C NOTES: *Horizontal staple spacing should be altered if necessary to allow staples to secure the critical points along the channel surface. **In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. CRITICAL POINTS A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices 4"(10cm) 6" (15cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. STAPLE PATTERN GUIDE NOTES: * Use ECMDS for more accurate staple pattern selection. 2"-5" (5-12.5cm) 3.3' (1m) 6' (1.8m) 3' (0.9m) 4' (1.2m) 1.6' (0.5m) 2' (0.6m) 10" (25cm) 10"(25cm) 20"(0.5m) 0.7 Staples per SQ.YD.1.15 Staples per SQ.YD. 1.7 Staples per SQ.YD.3.4 Staples per SQ.YD.3.75 Staples per SQ.YD. 4:1 Slopes (A) 3:1 Slopes (B) 2:1 Slopes (C) 1:1 & Steeper Slopes (D) Medium/High Flow Channel (D) High Flow Channel And Shoreline (E) Drawing Not To Scale A B C D E 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 6' (1.8m) 3.3' (1m) 3.3' (1m) 3' (0.9m) 3.3' (1m) 3.3' (1m) 3.3' (1m) 1.6' (0.5m) 4' (1.2m) 4' (1.2m) 2' (0.6m) 2' (0.6m) 20"(0.5m) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com SLOPE INSTALLATION DETAIL Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 3B 4 2 5 1 3A 12"(30cm) 6" (15cm) 6" (15cm) *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. 3"(7.5cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.nagreen.com RIP-RAP APRON AT PIPE OUTLET RIP RAP SIZING CHART 02ROCK CHECK DAM 01 ”” 03COIR FIBER COMPOST SOCK SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.7©NCDEQ IMMEDIATE STABILIZATION SEEDING RECOMMENDATION (NURSE CROP) NCDEQ PRIMARY STABILIZATION SEEDING RECOMMENDATION (NON-NATIVE SPECIES) NCDEQ PRIMARY STABILIZATION SEEDING RECOMMENDATION (NATIVE SPECIES)NCDEQ PRIMARY STABILIZATION NATIVE SPECIES SEED MIXES PERMANENT SEEDING CONSTRUCTION SPECIFICATIONS AND MAINTENANCE TT IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONSITE PLANC3.0©Know what's below. before you dig.Call R SITE LEGEND NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONSITE DETAILSC3.1©02GRAVEL PAVEMENT SECTION 03ASPHALT PAVEMENT SECTION BEDDING AND TRENCH TYPICAL CULVERT DETAIL A BB A 01 04 TT IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SEE SHEET C4.1 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGRADING ANDDRAINAGE PLANC4.0©Know what's below. before you dig.Call R NORTH GRADING AND DRAINAGE LEGEND 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONENLARGED PADGRADING ANDDRAINAGE PLANC4.1©Know what's below. before you dig.Call R GRADING AND DRAINAGE LEGEND NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGRADING ANDDRAINAGE DETAILSC4.2©01BENCHING / KEYING SLOPES DETAIL