Loading...
HomeMy WebLinkAbout20201377 Ver 1_PreFiling Acknowledgement Email_20201013Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, October 13, 2020 9:05 AM To: ieckardt@wildlandseng.com Subject: Pre -Filing Meeting Request Acknowledgement - South Ellerbe Restoration - 20201377 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for South Ellerbe Restoration that you submitted on 10/2/2020. The ID number for that project is 20201377, Version 1. Reviewer Contact Information: Reviewer: Stephanie Goss Email: stephanie.goss@ncdenr.gov Reviewing Office: Raleigh Regional Office - (919) 791-4200 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201377 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 10/2/2020 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Ian Eckardt ieckardt@uvildlandseng.com South Ellerbe Restoration City of Durham Public Works Department, Stormwater and GIS Services Division (POC: Sandra Wilbut, PE, Engineering Manager) Durham Street Address 101 City Hall Plaza Address Line 2 City Durham Fbstal / Zip Code 27701 State / Frovince / Fegion NC Country USA Is this a transportation project?* Yes o No Type(s) of approval sought from the DWR: 141 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express • Individual Permit F Modification • Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* The project seeks to improve water quality in the Ellerbe Creek watershed and help the city of Durham meet the Falls Lake Nutrient Management Strategy Rules through the restoration of a stream and wetland complex that will filter storm water for approximately 485 acres of urban area north of downtown Durham. To date the project has involved the demolition of the former Duke Diet and Fitness Center and removal of underground storage tanks. Design for additional site remediation and restoration is ongoing. Additional remediation involves the removal of the top two to three feet of soil across a majority the site and remaining impervious surfaces including building foundation, parking lot and driveway. The restoration work will involve the construction of a floodplain wetland complex and the excavation of new channel alignments, as well as the placement of in - stream habitat and grade control structures. Restoration work will involve approximately 2,000 linear feet of stream which includes day -lighting approximately 700 feet of currently piped stream. A pre -application office meeting was held with NCDWR staff (Stephanie Goss) on July 25, 2019 and included Ross Sullivan with the USACE Raleigh Regulatory Office. A follow up site meeting took place on September 9, 2019 with both NCDWR and USACE staff in attendance. Please give a couple of dates you are available for a meeting. 10/14/2020 10/23/2020 Please attach the documentation you would like to have the meeting about. South Ellerbe Restoration Pre- 3M6 Filing_Figures.pdf pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/2/2020