HomeMy WebLinkAbout20201461 Ver 1_PreFiling Acknowledgement Email_20201014Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Wednesday, October 14, 2020 2:27 PM
To: dcooper@vhb.com
Subject: Pre -Filing Meeting Request Acknowledgement - Rocky Branch Sewer Upgrade -
20201461 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Rocky Branch Sewer Upgrade
that you submitted on 10/13/2020. The ID number for that project is 20201461, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201461
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 10/13/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
David Cooper
dcooper@vhb.com
Rocky Branch Sewer Upgrade
City of Raleigh
Wake
Owner Address: Street Address
City of Raleigh Public Utilities Department
Address Line 2
1 Exchange Plaza #620
City State / Province / Fegion
Raleigh NC
Postal / Zip Code Country
27601 USA
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit F Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
NBRRO#20-164
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.*
Sewer upgrade along Rocky Branch Creek from Martin Luther King JR.
Blvd. to S. Wilmington Street, Raleigh, NC. Streams/wetlands delineated by
VHB / David Cooper, verified by USACE by desktop review, and
streams/buffer subjectivity verified on -site by Heather Smith (VHB) and
Cheng Zhang, determination letter dated 7/2/2020.
Project is currently in the design stage. Project will likely have unavoidable
buffer impacts, temporary / possibly permanent wetland impacts, temporary
/ possibly permanent stream impacts for stabilization. More information will
be available as design progresses and permit drawings are created for
submittal with the PCN.
The 75% design plans are attached for reference, but permit drawings
have not yet been created to show impacts to aquatic resources or riparian
buffers.
Please give a couple of dates you are available for a meeting.
11 /4/2020
11 /5/2020
Please attach the documentation you would like to have the meeting about.
RAL1902_Rocky Branch SS Improvement_75%
36.03MB
Design for VHB_2020-10-08.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/13/2020