HomeMy WebLinkAbout20201403 Ver 1_PreFiling Acknowledgement Email_20201013Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, October 13, 2020 9:14 AM
To: sskent@burnsmcd.com
Subject: Pre -Filing Meeting Request Acknowledgement - Piedmont Natural Gas - Line 473 -
20201403 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Piedmont Natural Gas - Line
473 that you submitted on 10/6/2020. The ID number for that project is 20201403, Version 1.
Reviewer Contact Information:
Reviewer: Stephanie Goss
Email: stephanie.goss@ncdenr.gov
Reviewing Office: Raleigh Regional Office - (919) 791-4200
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201403 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 10/6/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Sara Kent
sskent@burnsmcd.com
Piedmont Natural Gas - Line 473
Piedmont Natural Gas
Johnston
Street Address
4720 Piedmont Row Drive
Address Line 2
aty
Charlotte
Fbstal / Zip Code
28210
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
NC
Country
United States
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The Project includes the construction and operation of an approximately
1.75-mile, 8-inch natural gas pipeline. The pipeline will tie into the existing
Line 94 pipeline south of NC Business Route 70 and at the southern
terminus of Wildwood Drive. The pipeline will then travel north along
Wildwood Drive and cross NC Business Route 70 and the North Carolina
Railroad via Horizontal Directional Drill (HDD). The route then continues
northwest paralleling NC Business Route 70 and the railroad before turning
northeast/east along Highway 42. The pipeline extends along Highway 42
for approximately 0.8-miles before crossing to the north side of the road via
a conventional bore and terminating at the Flowers Plantation Regulator
Station. The pipeline terminus points are at: south/west (35.626745, -
78.43911) and north/east (35.643098,-78.430338). An approximately 0.3-
acre launcher and main line valve station is proposed at the southern
terminus and the Flowers Plantation Regulator Station is approximately 0.5
acres.
Please give a couple of dates you are available for a meeting.
10/14/2020
10/15/2020
10/20/2020
10/21 /2020
Please attach the documentation you would like to have the meeting about.
Line 473 Figures.pdf 915.72KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
��¢ C,` .ter
Submittal Date 10/6/2020