HomeMy WebLinkAbout20200967 Ver 2_Pre-Filing Acknowledgement Email_20201008 Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, October 8, 2020 5:24 PM
To: Sullivan, William
Subject: Pre-Filing Meeting Request Acknowledgement - Davis Park East-Hopson Rd Widening
- Davis Park East-Hopson Rd Widening - 20200967 Ver 2
Attachments: DWR Pre-Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form
for Davis Park East-Hopson Rd Widening that you submitted on (date). The ID number for that project
is 20200967, Version 2.
Reviewer Contact Information:
Reviewer:
Reviewer Email:
Reviewing Office: Central Office - (919) 707-9000
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnlrtl Qua fay
ID#* 20200967 Version* 2
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 10/7/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* William Sullivan
Contact Email Address* william.sullivan@kimley-horn.com
Project Name* Davis Park East-Hopson Rd Widening
Project Owner* Research Triangle, Ltd.
Project County* Durham
Owner Address: Street Address
600 E Colonial Drive
Address Line 2
Ste 100
City State/Rovince/Region
Orlando FL
Fbstal/Zip Code Country
32803 USA
Is this a transportation project?* ( Yes r No
Type(s)of approval sought from the DWR:
fJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20200967
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below.*
The project proposes to construct convert Hopson Road into a 4-lane
divided typical section from Distribution Drive to S Miami Boulevard in
Durham, Durham County, NC. In addition to the widening,the project
proposes intersection and turn lane improvements at the S Miami
Boulevard intersection, Keystone Drive intersection, and Distribution Drive
intersection. Due to the nature and location of the project, unavoidable
impacts will result to an unnamed tributary to Stirrup Iron Creek, Neuse
Buffer Zones 1 and 2,and two jurisdictional wetlands.
Please give a couple of dates you are available for a meeting.
10/19/2020
10/26/2020
Please attach the documentation you would like to have the meeting about.
DavisParkEast_Buffer_Ver 1_Approval
395.81KB
Letter_20200730.pdf
SAW-2020-01315 PJD Davis Park
2.13MB
Eastrevised1.pdf
DavisParkEast AA SIGNED 2020-07-
1.33MB
14_114021.pdf
Fig3_DavisParkEast_JDFeat.pdf 1.34MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 10/7/2020