HomeMy WebLinkAbout20190864 Ver 1_PreFiling Acknowledgement Email_20201009Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, October 9, 2020 11:35 AM
To: Tim.Morris@kci.com
Subject: Pre -Filing Meeting Request Acknowledgement - Dales Creek Restoration Site -
20190864 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Dales Creek Restoration Site
that you submitted on 10/6/2020. The ID number for that project is 20190864, Version 1.
Reviewer Contact Information:
Reviewer: Erin Davis
Email: erin.davis@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201358 Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Holley Snider
Pre -Filing Meeting Request submitted 10/1/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Kathy B. Vinson
kbvinson@ec.rr.com
Bayshore Nine Dock uvith Boat Slips
Bayshore Nine, LLC
Carteret
Street Address
104 Poplar Ridge Drive
Address Line 2
aty
Goldsboro
Fbstal / Zip Code
27534
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Holley Snider
Please give a brief project description below.
Bayshore Nine, LLC is the owner of property located at 304, 306, and 308
Bayshore Drive in Cape Carteret. The riparian corridor of the property
includes a portion of a highground basin with 3 existing docks and a boat
ramp.
The property owners desire to build a new dock extending into Bogue
Sound, with five formalized boatslips and a platform. The proposed dock
would connect to an existing concrete pier located south of the existing
ramp.
The proposed dock with boat slips has been located as far west as
possible to avoid submerged aquatic vegetation (SAV) based on a SAV
survey conducted by Southern Environmental Group, Inc. (SEGi) on
September 15, 2020 and remain within the one -quarter water body
distance as required by CAMA. In order to avoid an additional closure of
shellfishing waters the proposed boat slips have been located a minimum
of 100' from existing boat slips (as determined by the Division of Marine
Fisheries- Shellfish Sanitation & Recreational Water Quality Section) in the
basin and located along an existing bulkhead within the basin.
Please give a couple of dates you are available for a meeting.
10/8/2020
10/20/2020
10/28/2020
Please attach the documentation you would like to have the meeting about.
09212020 Bayshore 9_V4.pdf 785.93KB
Attachment 1 - Findings.pdf 297.27KB
Bayshore 9 SEGi SAV Eval 9-15-2020 Final.pdf 208.4KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/1/2020