HomeMy WebLinkAbout20201381 Ver 1_PreFiling Acknowledgement Email_20201006Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, October 6, 2020 8:30 AM
To: jlawler@smeinc.com
Subject: Pre -Filing Meeting Request Acknowledgement - Victoria Hills Service Line - 20201381
Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Victoria Hills Service Line that
you submitted on 10/5/2020. The ID number for that project is 20201381, Version 1.
Reviewer Contact Information:
Reviewer: Andrew Moore
Email: andrew.w.moore@ncdenr.gov
Reviewing Office: Asheville Regional Office - (828) 296-4500
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201381 Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Andrew Moore
Pre -Filing Meeting Request submitted 10/5/2020
......................................................................................................................................................................................................................................
Contact Name * Joey Lawler
Contact Email Address* jlawier@smeinc.com
Project Name* Victoria Hills Service Line
Project Owner* Dominion Energy North Carolina
Project County* Buncombe
Owner Address: Street Address
220 Operation Way
Address Line 2
aty State / Province / Region
Cayce SC
Fbstal / Zip Code Country
29033 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Andrew Moore
Please give a brief project description below.
Dominion Energy North Carolina (DENC) is planning to install approximately
4,120 linear feet of 2-inch diameter plastic natural gas pipeline and
approximately 2,490 linear feet of 4-inch diameter plastic natural gas
pipeline to provide service to the Victoria Hills residential subdivision which
is currently under construction in Arden, Buncombe County, North
Carolina. It is our understanding that this pipeline will be constructed
entirely within an existing maintained road right-of-way (ROW) and the
disturbed width will be approximately 10 feet, with additional workspace that
may be required at two proposed stream crossings (Avery Creek and an
unnamed tributary). Both stream crossings will also encroach within an
adjacent FEMA-designated floodplain. The project is not located within a
trout watershed, and we understand that less than 1.0 acre of land
disturbance will be associated with the pipeline installation. It is unclear at
this point whether impacts associated with construction of the new gasline
will require pre -construction written approval from NCDWR under GC-4133.
Impacts to streams/wetlands associated with the subdivision that the
gasline will serve were originally authorized under DWR #190189 (Lance
Road Subdivision).
Please give a couple of dates you are available for a meeting.
10/30/2020
Please attach the documentation you would like to have the meeting about.
Vicnity Exhibit.pdf 1.21 MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/5/2020