Loading...
HomeMy WebLinkAbout20201220 Ver 1_PreFiling Acknowledgement Email_20201002Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, October 2, 2020 3:56 PM To: burdette@mcadamsco.com Subject: Pre -Filing Meeting Request Acknowledgement - Project Flash - 20201220 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Project Flash that you submitted on 9/18/2020. The ID number for that project is 20201220, Version 1. Reviewer Contact Information: Reviewer: Email: Reviewing Office: Raleigh Regional Office - (919) 791-4200 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201220 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 9/18/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jennifer Burdette burdette@mcadamsco.com Project Flash Merck & Co, Inc. Durham Street Address Address Line 2 aty Fbstal / Zip Code Is this a transportation project? * r Yes r No State / Province / Region Country Type(s) of approval sought from the DWR: W 401 Water Quality Certification - r- 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification F- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 2004-0446 Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* Project Flash involves construction of a new manufacturing facility south of the existing Merck facility in the Treyburn Business Campus. The manufacturing facility will include two buildings along with associated parking lots, sidewalks/trails, stormwater control measures and utility connections. A linear wetland separates the project area from the existing facility requiring a road and a sanitary sewer crossing. A temporary power line will be installed within the fill slope of the proposed road crossing until a future distribution power line is planned and designed. Additional detail regarding the future distribution power line is provided under the Future Phases section below. The project will result in 0.098 acre of permanent wetland loss, 0.087 acre of temporary wetland impacts that will be permanently converted to herbaceous wetlands and 0.053 acre of temporary wetland impacts. Please give a couple of dates you are available for a meeting. 9/21 /2020 9/22/2020 9/23/2020 9/24/2020 9/25/2020 Please attach the documentation you would like to have the meeting about. 06-SPEC20097-Impact Maps.pdf 2.52MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 0��lrlvlt71 Submittal Date 9/18/2020