Loading...
HomeMy WebLinkAbout20201333 Ver 1_PreFiling Acknowledgement Email_20201005Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, October 5, 2020 9:20 AM To: khamlin@sageecological.com Subject: Pre -Filing Meeting Request Acknowledgement - Holly Springs Business Park (formerly Green Oaks Parkway Sites) - 20201333 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Holly Springs Business Park (formerly Green Oaks Parkway Sites) that you submitted on 9/29/2020. The ID number for that project is 20201333, Version 1. Reviewer Contact Information: Reviewer: Stephanie Goss Email: stephanie.goss@ncdenr.gov Reviewing Office: Raleigh Regional Office - (919) 791-4200 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201333 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 9/29/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Kim Hamlin khamlin@sageecological.com Holly Springs Business Park (formerly Green Oaks Parkway Sites) Skie Properties Two, LLC Wake Street Address 3700 Laurel Hills Road Address Line 2 aty Raleigh Fbstal / Zip Code 27612 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* RRO #20-010 State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The overall project consists of the construction of a small business park comprised of five office buildings and flex space. Access to the Site will be provided by connections to Green Oaks Parkway. Driveways and parking spaces will be provided for each proposed building. Water and wastewater services will be connected to existing services adjacent to the Site. Heavy equipment typically used for utility installation projects (e.g. backhoes, bulldozers, etc.) will be utilized. A stream determination letter was issued on February 7, 2020 (RRO #20- 010). A PJD was submitted on July 30, 2019. A PJD concurrence e-mail was received from Mr. James Lastinger on August 20, 2019 (SAW-2013- 00472) after site meeting with Mr. Sean Clark of Sage. Please give a couple of dates you are available for a meeting. 10/14/2020 10/15/2020 Please attach the documentation you would like to have the meeting about. Figure 1 - Green Oaks Sites 1 USGS.pdf 996.99KB Figure 2 - Green Oaks Sites 1 Soils.pdf 1.03MB Figure 3 - Green Oaks Parkway Site PJD 669.26K6 Stream and Wetland Sketch Map.pdf NCDWR Stream Determination (RRO #20-010) 2.22M6 for Green Oaks Parkway.pdf Email Approval of PJD submittal from USACE (Action ID SAW-2013-00472) for Green Oaks 149.02KB Pkwy Site. pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature +W114 *ft Submittal Date 9/29/2020