Loading...
HomeMy WebLinkAbout20090380 Ver 1_Certification of Completion_20100318 Certificate of Completion c DWQ Project No. 1- C-`' County: Applicant: at, 7 Project Name: Recc-,%{'?. Date of Issuance of 401 Water Quality Certification: Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. t" r-•? Signature: t L7 fi. ^`? Date: t? ?? J R 1 20 #10 Agent's Certification aEaH- WATER ou VrE7AM-DcAIV ,,,T()ii.We, TEM1 R?CJJ I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified Professional I, lAZQ 14,er H u o+p-r- , as ad, d° a +?reed (i.e., Engineer, Landscape Architect, S _ Ak,caA?MI'el authorized to observe (periodically, w Permittee hereby state that, to the be o observation of the construction such ha compliance and intent of the 401 W r and specifications, and other Signature: ?e_- j Date: Professional ??? i vi eer- State of North Caro ina, having been ®tonstruction of the project, for the bilitie' e &rre and diligence was used in the Pkctio i w is observed to built within substantial Wfitioi9 and Buffer Rules, the approved plans Q w F. RO ??" onwir!c 1 -3 8 Date: '2VP5//D • CHARLOTTE. CHARLOTTE•MECKLENBURG UTILITIES March 15, 2010 Ms. Cyndi Karoly, Supervisor 401 Oversight and Express Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 REF: DWQ Project No. 09-0380 Beaver Dam Creek Tributary Sewer Main Dear Ms. Karoly: MAR 1 D.Wi - WATER QUALITY MUMS- AND STORM TER M M01 Attached please find a Certificate of Completion for the above-mentioned project. If you have any questions or comments, please contact me by phone at (704) 391-5124, or via e:mail at whunter2charlottenc.gov. Sincerely, Walter F. Hunter, PE Project Manager Charlotte-Mecklenburg Utilities Cc: Alan Johnson, Mooresville Regional Office, NCDENR CHARLOTTE-MECKLENBURG UTILITIES www.cmutilities.com Engineering 5100 Brookshire Boulevard PH: (704) 391-5124 Charlotte, NC 28216 e-mail: whunter@ci.charlotte.nc.us