HomeMy WebLinkAboutNCC204727_ESC Approval Submitted_20201021ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Caviness Land Development, Inc.
Attn: Watson G. Caviness, President
1041 B Robeson Street
Fayetteville, NC 28305
NORTH CAROLINA
Environmental Quality
October 16, 2020
LETTER OF APPROVAL
RE: Project Name: Forest Oaks Phase 5, Section 2 Lots 263, 315, 316 & 317
Acres Approved: 1.04
Project ID: HARNE-2021-056
County: Harnett, City: Anderson Creek, Address: Silk Oak Drive
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Larry King & Associates, R.L.S., P.A
Date Received by LQS: September 17, 2020
Plan Type: New
Dear Mr. Caviness:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the j ob site.
This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been
undertaken, as required by Title 15A NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit. This form MUST be submitted and COC issued prior to the commencement of any land
disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the NOI form to Annette Lucas at Annette. lucasgncdenr. gov or Paul Clark at
Paul. clarkgncdenr. gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
°
NORTH CAflOLJNA _�
apa °'"'°' E"tal ° °'°` �� 910.433.3300
Letter of Approval
Caviness Land Development, Inc.
October 16, 2020
Page 2 of 2
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land -disturbance, as called for on the application
plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would
require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Mike Bowyer, Larry King & Associates, R.L.S., P.A — electronic copy
Landon Chandler, Senior Planner — electronic copy
DEMLR - Fayetteville Regional Office File