Loading...
HomeMy WebLinkAbout20190159 Ver 1_PreFiling Acknowledgement Email_20200929Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, September 29, 2020 4:28 PM To: jmceachran@res.us Subject: Pre -Filing Meeting Request Acknowledgement - Strawberry Hill - 20190159 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Strawberry Hill that you submitted on 9/24/2020. The ID number for that project is 20190159, Version 1. Reviewer Contact Information: Reviewer: Erin Davis Email: erin.davis@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20190159 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Erin Davis Pre -Filing Meeting Request submitted 9/24/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jamey McEachran jmceachran@res.us Strawberry Hill North Carolina Division of Mitigation Services Johnston Street Address 217 West Jones Street Address Line 2 aty Raleigh Rbstal / Zip Code 27603 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 2019-0159 Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below.* The Strawberry Hill Mitigation Project is located within a mostly rural watershed in Johnston County in Smithfield, NC at the crossroads of Yelverton Grove Road and Brogden Road. The Project lies within the Neuse River Basin, North Carolina United States Geological Survey (USGS) 8-digit Cataloguing Unit 03020201 (Neuse 01) and 14-digit hydrologic unit code (HUC) 03020201140010, a NC Division of Mitigation Services (DMS) Targeted Local Watershed (TLW) and the Division of Water Resources (NCDWR) sub -basin 03-04-02 (Figure 1). This Project was selected by DMS as a full delivery project to provide stream mitigation units and buffer credits in the Neuse 01. The Project proposes to restore 3,719 linear feet (LF) that will provide water quality benefit for 383 acres of drainage area. Additionally, the Project will restore and preserve riparian buffer area within the project area, which will provide 656,593.451 buffer credits for the Neuse 01 watershed. Also, notably, the Project is in very close proximity (approximately 0.4 miles) to the RES Polecat Stream Mitigation Bank Site, offering even more functional uplift to the local watershed. The Project area, in whole, is comprised of a 22.12-acre easement involving two unnamed tributaries to Polecat Branch, which eventually drains to the Neuse River. One of the tributary streams, and its associated ditches, will not be subjected to stream mitigation and will only be utilized for buffer mitigation. The stream mitigation component of the Project involves one tributary, totaling 3,267 existing LF. Please give a couple of dates you are available for a meeting. 10/9/2020 10/12/2020 10/19/2020 Please attach the documentation you would like to have the meeting about. Figures_Combined_StrawberryHill.pdf 14.64MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature I" &r"4ul Submittal Date 9/24/2020