HomeMy WebLinkAbout20190159 Ver 1_PreFiling Acknowledgement Email_20200929Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, September 29, 2020 4:28 PM
To: jmceachran@res.us
Subject: Pre -Filing Meeting Request Acknowledgement - Strawberry Hill - 20190159 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Strawberry Hill that you
submitted on 9/24/2020. The ID number for that project is 20190159, Version 1.
Reviewer Contact Information:
Reviewer: Erin Davis
Email: erin.davis@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20190159
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Erin Davis
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jamey McEachran
jmceachran@res.us
Strawberry Hill
North Carolina Division of Mitigation Services
Johnston
Street Address
217 West Jones Street
Address Line 2
aty
Raleigh
Rbstal / Zip Code
27603
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
2019-0159
Do you know the name of the staff member you would like to request a meeting with?
Erin Davis
Please give a brief project description below.*
The Strawberry Hill Mitigation Project is located within a mostly rural
watershed in Johnston County in Smithfield, NC at the crossroads of
Yelverton Grove Road and Brogden Road. The Project lies within the
Neuse River Basin, North Carolina United States Geological Survey (USGS)
8-digit Cataloguing Unit 03020201 (Neuse 01) and 14-digit hydrologic unit
code (HUC) 03020201140010, a NC Division of Mitigation Services (DMS)
Targeted Local Watershed (TLW) and the Division of Water Resources
(NCDWR) sub -basin 03-04-02 (Figure 1). This Project was selected by
DMS as a full delivery project to provide stream mitigation units and buffer
credits in the Neuse 01. The Project proposes to restore 3,719 linear feet
(LF) that will provide water quality benefit for 383 acres of drainage area.
Additionally, the Project will restore and preserve riparian buffer area within
the project area, which will provide 656,593.451 buffer credits for the
Neuse 01 watershed. Also, notably, the Project is in very close proximity
(approximately 0.4 miles) to the RES Polecat Stream Mitigation Bank Site,
offering even more functional uplift to the local watershed.
The Project area, in whole, is comprised of a 22.12-acre easement
involving two unnamed tributaries to Polecat Branch, which eventually
drains to the Neuse River. One of the tributary streams, and its associated
ditches, will not be subjected to stream mitigation and will only be utilized
for buffer mitigation. The stream mitigation component of the Project
involves one tributary, totaling 3,267 existing LF.
Please give a couple of dates you are available for a meeting.
10/9/2020
10/12/2020
10/19/2020
Please attach the documentation you would like to have the meeting about.
Figures_Combined_StrawberryHill.pdf 14.64MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
I" &r"4ul
Submittal Date 9/24/2020