HomeMy WebLinkAbout20201286 Ver 1_PreFiling Acknowledgement Email_20200929Strickland, Bev
From:
laserfiche@ncdenr.gov
Sent:
Tuesday, September 29, 2020 10:52 AM
To:
adam@marcoldredging.com
Subject:
Pre -Filing Meeting Request Acknowledgement - Duke Energy Progress Discharge
Canal Maintenance Dredging - 20201286 Ver 1
Attachments:
DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division
of Water Resources has received the Pre -Filing Meeting Request Form for Duke Energy Progress
Discharge Canal Maintenance Dredging that you submitted on 9/24/2020. The ID number for that project is 20201286, Version 1.
Reviewer Contact Information:
Reviewer: Robb Mairs
Email: robb.mairs@ncdenr.gov
Reviewing Office: Wilmington Regional Office - (910) 796-7215
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201286
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name * Adam W. Dillon
Contact Email Address* adam@marcoldredging.com
Project Name* Duke Energy Progress Discharge Canal Maintenance Dredging
Project Owner* Duke Energy Progress
Project County* Brunswick
Owner Address: Street Address
P.O. Box 1771
Address Line 2
aty
State / Frovince / Region
Raleigh
NC
Rbstal/Zip Code
Country
27602
USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
W Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Tara MacPherson
Please give a brief project description below.
Maintenance dredging of the Duke Energy Progress cooling canal pump
station basin located on Caswell Beach between the AIWW and the Atlantic
Ocean at 700 Caswell Beach Road. Basin is to be dredged to an average
depth of 18 feet. Approximately 170,000 cubic yards of spoil will be
discharged to the spoil area on site. Project will completed by Marcol
Dredging.
Please give a couple of dates you are available for a meeting.
9/25/2020
9/28/2020
9/29/2020
9/30/2020
10/1 /2020
Please attach the documentation you would like to have the meeting about.
200910 Duke Discharge Canal South.pdf 21.65MB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/24/2020