Loading...
HomeMy WebLinkAboutNC0065684_BIMS_20201020 (2)United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO065684 111 121 20/10/14 I17 18 LC] I 19 I s I 20L] 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 71 I 74 79 I I I I I I I80 701� I 711 L LJ L -1 I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 09:42AM 20/10/14 16/10/01 Country Wood WWTP NCSR 1004 Exit Time/Date Permit Expiration Date Monroe NC 28110 10:55AM 20/10/14 21/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Daniel G Wimpey/ORC/337-215-1165/ Keith Alan Shattuck/ORC/704-309-1119/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Joseph R Pearce,202 Mackenan Crt Cary NC 27511 /Director of Operations/919-653-6964/9194601788 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Laboratory Other Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Roberto Scheller DWR/MRO WQ/252-946-6481/ 10/15/2020 E91C2A007838943E.- Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 10/20/2020 A14CC681 AF27425... Page# NPDES yr/mo/day Inspection Type (Cont.) NCO065684 I11 12I 20/10/14 117 18 i c i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Inspection conducted on October 13, 2020 was result of an odor complaint received by this Office. Compliance history was reviewed from September 2019 through August 2020. No permit limit violations were reported during review period. At time of inspection treatment facility appeared to be well operated and maintained. Effluent was clear with no visible suspended solids. Construction of plant upgrades were ongoing at time of inspection. Four (4) aeration blowers and related piping and controls are to be replaced under A to C #065684A04. No excessive odors were noted around WWTP at time of inspection. This Office has received several complaints in the past regarding odor comming from Country Wood WWTP. The site was visited, as result of complaints, on April 23, 2018 and a Compliance Evaluation Inspection (CEI) was conducted on May 23, 2018. During both site visits no unusually strong or offensive odors were noted. Aeration basins had earthy smell and EQ basin had light ammonia smell that disipated 20-30 feet away from basin. Page# Permit: NCO065684 Owner -Facility: Country Wood WWTP Inspection Date: 10/14/2020 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? M ❑ ❑ ❑ Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc ❑ ❑ 0 ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification' ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Page# 3 Permit: NCO065684 Inspection Date: 10/14/2020 Owner -Facility: Country Wood WWTP Inspection Type: Compliance Evaluation Operations & Maintenance Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? NOT, 171,"M Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Contract lab Water Tech Laboratory, Certification #50. Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE Comment: The subject inspection was conducted in response to odor complaints. At time of inspection no unusually strong or offensive odors were noted. Aeration basins had an earthy smell and EQ basin had an ammonia smell that disipated 40 - 50 feet away from basin. Equalization Basins Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: EQ basin consists of 2 package treatment plants that have been converted to equalization basins equipped with dual pumps, high water alarms and related controls. Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Is the wet well free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Page# 4 Permit: NCO065684 Inspection Date: 10/14/2020 Owner -Facility: Country Wood WWTP Inspection Type: Compliance Evaluation Pump Station - Influent Yes No NA NE Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ 0 ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical Are the bars adequately screening debris? N ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Is the basin free of dead spots? N ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) 0 ❑ ❑ ❑ Comment: EQ basins pump to 3 treatment trains. Each treatment unit has EQ tank, areobic digester, aeration basin, secondary clarifier and sand filter. Treatment units discharge into common effluent pipe and passes through UV disinfection. Effluent passes through flowmeter and outfall pipe #001. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 5 Permit: NC0065684 Inspection Date: 10/14/2020 Secondary Clarifier Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Owner -Facility: Country Wood WWTP Inspection Type: Compliance Evaluation Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: At time of inspection effluent from secondary clarifier was clear with few suspended solids. Filtration (High Rate Tertiary) Yes No NA NE Type of operation: Down flow Is the filter media present? ❑ ❑ ❑ Is the filter surface free of clogging? ❑ ❑ ❑ Is the filter free of growth? ❑ ❑ ❑ Is the air scour operational? ❑ ❑ ❑ Is the scouring acceptable? ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? ❑ ❑ 0❑ Comment: Aerobic Digester Yes No NA NE Is the capacity adequate? 0 ❑ ❑ ❑ Is the mixing adequate? 0 ❑ ❑ ❑ Is the site free of excessive foaming in the tank? 0 ❑ ❑ ❑ # Is the odor acceptable? 0 ❑ ❑ ❑ # Is tankage available for properly waste sludge? 0 ❑ ❑ ❑ Comment: Sludge was being removed at time of inspection. Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? ❑ ❑ ❑ Are UV bulbs clean? ❑ ❑ ❑ Is UV intensity adequate? ❑ ❑ ❑ Page# 6 Permit: NCO065684 Inspection Date: 10/14/2020 Disinfection - UV Is transmittance at or above designed level? Is there a backup system on site? Is effluent clear and free of solids? Owner -Facility: Country Wood WWTP Inspection Type: Compliance Evaluation Yes No NA NE ❑ ❑ ❑ ■ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: At time of inspection construction around UV system was on going. C12 is being used while new UV basin is under construction. Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Sampler not in use at time of inspection. Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 7