Loading...
HomeMy WebLinkAbout20200016 Ver 1_UT3 Approach Memo_20200918Strickland, Bev From: Jeff Keaton <jkeaton@wildlandseng.com> Sent: Friday, September 18, 2020 11:38 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Haywood, Casey M CIV USARMY CESAW (USA); Wiesner, Paul; Phillips, Kelly D Cc: Shawn Wilkerson; Abigail Vieira Subject: [External] RE: Cross Creek Ranch UT3 Approach Memo Attachments: Figure 1. UT3 Concept Approach Map.pdf Follow Up Flag: Flag Status: Follow up Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Folks —After sending out the approach memo for UT3 at the Cross Creek Ranch site, we had a follow-up conference call and email exchange with Kim, Erin, and Casey. The result of those discussions is that we will propose three reaches for UT3. The first reach will be approximately 792 LF of restoration at the upstream end of the stream. The second reach will be 848 LF of "lumped" enhancement II consisting of a few different sections with different treatments similar to what was proposed in the memo. The lower 321 LF will be a short preservation reach. A map is attached to show the three separate reaches. Each reach will be described in more detail in the upcoming draft mitigation plan. Both Erin and Kim indicated that they would need to review the mitigation plan before agreeing on credit ratios, so we will hold off on further discussion of proposed ratios until the draft mit plan is submitted late this year. Erin and Kim did not think a final version of the memo was necessary, so I'm sending this email as the final communication on this until the draft mit plan is submitted. Please let me know if there are any questions or concerns. Thanks. Jeff From: Jeff Keaton Sent: Tuesday, August 4, 2020 1:59 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Phillips, Kelly D <Kelly.Phil lips@ncdenr.gov> Cc: Shawn Wilkerson <swilkerson@wildlandseng.com>; Abigail Vieira <avieira@wildlandseng.com> Subject: Cross Creek Ranch UT3 Approach Memo All — One of the outcomes of the Cross Creek Ranch post -contract site visit was a request by members of the IRT that the treatments and crediting for the different sections of UT3 be planned and discussed in a memo to be sent out to the IRT. Here is the comment from the post contract meeting summary: UT3 was walked from upstream to downstream, and it was noted by the IRT that the reach is in varying condition which will require fluctuating levels of treatment and design. Wildlands will provide a follow-up memo including a map and table that outline lengths, approaches, and associated crediting ratios for UT3 and provide it to NCDMS and the IRT for approval prior to major design efforts. The follow-up memo is attached. We look forward to your feedback on this memo and specifically if you agree with our proposed approach and crediting for the stream. Please let us know if we can move forward with the 2.5:1 credit ratio for the entire UT3 stream and the treatments we have proposed for that stream. Please feel free to contact me if we need to discuss. Thanks. Jeff Keaton, PE I Senior Water Resources Engineer 0:919.851.9986 x103 M: 919.302.6919 Wildlands Engineering, Inc. 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 ti : � ' �t r_ •mow �, - I ♦ �I� _• �� a Imo• VIA s w I Jk i Project Area 77. Project Parcels UT3 Approach f:. • Q' �•�, e 44 Restoration; , N7 1 *W,��, �'" aa f Enhancementll w. zr Preservation •tea •,� �..� _, %0 WILDLANDS ENGINEERING 0 200 400 Feet I I I I J r. Figure 1 UT3 Concept Approach Cross Creek Ranch Mitigation Site Yadkin River Basin 03040104 Montgomery County, NC