Loading...
HomeMy WebLinkAbout20180795 Ver 1_Notice of Initial Credit Release_20200922Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Tuesday, September 22, 2020 9:19 AM To: Dow, Jeremiah J; worth@restorationsystems.com Cc: Crocker, Lindsay; Tugwell, Todd J CIV USARMY CESAW (US); Bowers, Todd; Davis, Erin B; Haywood, Casey M CIV (USA); Wilson, Travis W.; kathryn_matthews@fws.gov; Merritt, Katie; Munzer, Olivia; Smith, Ronnie D CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA); Gibby, Jean B CIV USARMY CESAW (USA); David.E.Bailey2@usace.army.mil Subject: [External] Notice of Initial Credit Release/ NCDMS Slingshot Mitigation Site/ Rockingham Co/ SAW-2018-01170 Attachments: Slingshot_100058_CF 02_STR_RW_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning, The 15-Day Record Drawing review for the Slingshot Mitigation Site (SAW-2018-01170) ended September 18, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. There were no objections to issuing the initial credit release. Please find attached the current signed ledger, and IRT comments below. DWR Comments. Erin Davis: 1. For areas where the existing fencing was used as easement fence but deviated for the easement boundary by more than 25-50 feet, were easement sign posts installed along the actual boundary? 2. Both flow gauges appear to be located further downstream than shown in the mitigation plan monitoring figure. What is the reason for the change in the locations? 3. It is concerning that construction was deemed complete and the as -built baseline report was submitted in August without all of the site fencing installed (report page 4). In the future, DWR would not consider construction complete without the site planted and entire easement boundary signed/fenced. 4. DWR appreciated the inclusion of soil logs for all of the groundwater well locations. EPA Comments, Todd Bowers: At this time, based on the provided report I have no serious issues or concerns that would prevent or rescind the release of credits (30%) made on August 26, 2020. As such the EPA Region 4 Oceans, Wetland and Streams Protection Branch approves the release of 955.63 warm stream credits and 0.396 riparian wetland credits as an inclusion to the North Carolina Division of Mitigation Services In -lieu fee program. I do have some minor comments for the provider pertaining to planting. This site was planted at the latest date considered to be minimally suitable for planting. In the future it is recommended that the provider consider planting sooner in the year to minimize the risk of planting outside of the dormant season for bare -root saplings. The planting date of April 30 is poorly suited for maximizing the survivability of bare -root plants as this is well within the growing season for Rockingham County. Should supplemental planting be needed in the future, this may be a contributing factor to low survivability. The late planting date also puts the provider at additional risk for providing a MY1 report within the time frame considered to evaluate surviving plants at the end of the growing season (at least 180 days after planting and before November 1). I would also like to thank the provider for providing drone footage of the site. This information is very useful and while it does not replace in -person site visits, it does allow IRT members with time or travel constraints to evaluate the site in lieu of being there. If the provider wishes to hold a virtual site visit including a storyboard presentation with photos, notes and drone footage, for this or any newly built site, I highly encourage it. Please contact the District Mitigation Office if you have questions, Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Mitigation Project Name Slingshot DMS ID 100058 River Basin Cape Fear Cataloging Unit 03030002 County Rockingham USACE Action ID 2018-01170 DWR Permit 2018-0795 Date Project Instituted 4/24/2018 Stream/Wet. Service Area Cape Fear 03030002 Date Printed 8/26/2020 BROWNING.KIMBERLY.DANIELLE.1527683510 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 Date: 2020.09.22 09:00:44-04'00' Signature of Official Approving Credit Release Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 955.630 955.630 0.000 955.630 2020 8/26/2020 3 -Year 1 Monitoring 10.00% 318.544 2021 4 - Year 2 Monitoring 10.00% 318.544 2022 5 - Year 3 Monitoring 10.00% 318.544 2023 6 -Year 4 Monitoring 5.00 % 159.270 2024 7 -Year 5 Monitoring 10.00% 318.544 2025 8 -Year 6 Monitoring 5.00 % 159.270 2026 9 -Year 7 Monitoring 10.00% 318.544 2027 Stream Bankfull Standard 10.00% 318.544 2022 Totals 955.630 Total Gross Credits 3,185.434 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 955.630 Total Percentage Released 30.00% Remaining Unreleased Credits 2,229.804 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 0.396 0.396 0.000 0.396 2020 8/26/2020 3 -Year 1 Monitoring 10.00% 0.132 2021 4 -Year 2 Monitoring 10.00% 0.132 2022 5 - Year 3 Monitoring 15.00% 0.199 2023 6 - Year 4 Monitoring 5.00 % 0.067 2024 7 -Year 5 Monitoring 15.00% 0.198 2025 8 - Year 6 Monitoring 5.00 % 0.066 2026 9 -Year 7 Monitoring 10.00% 0.131 2027 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 0.396 Total Gross Credits 1.321 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 0.396 Total Percentage Released 30.00% Remaining Unreleased Credits 0.925 Page 1 of 2 Mitigation Project Name Slingshot USACE Action ID DMS ID 100058 DWR Permit River Basin Cape Fear Date Project Instituted Cataloging Unit 03030002 Stream/Wet. Service Area County Rockingham Date Printed Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 2,501.000 Warm Stream Enhancement I 587.000 Warm Stream Enhancement II 635.000 Warm Stream Preservation 391.000 Riparian Restoration 1.018 Riparian Enhancement 0.606 2018-01170 2018-0795 4/24/2018 Cape Fear 03030002 8/26/2020 Debits Warm Stream Restoration Credits Warm Stream Restoration Equivalent Credits Riparian Restoration Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 3,146.334 39.100 1.018 0.303 Released Credits 943.900 11.730 0.305 0.091 Unrealized Credits 0.000 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 943.900 11.730 0.305 0.091 Remaining Balance (Unreleased credits) 2,202.434 27.370 0.713 0.212 Total Remaining Balance (Released and Unreleased credits) 3,146.334 39.100 1.018 0.303 Page 2 of 2