HomeMy WebLinkAbout20181274 Ver 1_Mitigation Plan Addendum Request_20200923Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent:
Wednesday, September 23, 2020 9:27 AM
To:
Wiesner, Paul; Haywood, Casey M CIV (USA); Davis, Erin B; Tugwell, Todd J CIV
USARMY CESAW (US)
Cc:
Jeff Keaton; Shawn Wilkerson; Xu, Lin; Phillips, Kelly D
Subject:
[External] RE: [Non-DoD Source] Notice of NCDEQ - DMS Mitigation Plan Addendum
Request: Lyon Hills Mitigation Site (DMS#100085) - (SAW-2018-01784) (DWR#
20181274) - Yadkin 03040101_Wilkes County
Follow Up Flag: Follow up
Flag Status: Completed
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Thanks Paul. Since Erin, Todd and I already discussed this, we won't need a review period. I was a little
confused about the tables since some of them discuss a 42-ft wide crossing but it's listed as a 40-ft easement
break. Otherwise I'll just file this away for the As -Built review.
Thanks
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
-----Original Message -----
From: Wiesner, Paul <paul.wiesner@ncdenr.gov>
Sent: Tuesday, September 22, 2020 6:09 PM
To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B
<erin.davis@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA)
<Todd.J.Tugwell@usace.army.mil>
Cc: Jeff Keaton <jkeaton@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Xu, Lin
<lin.xu@ncdenr.gov>; Phillips, Kelly D <Kelly.Phi Ili ps@ncdenr.gov>
Subject: [Non-DoD Source] Notice of NCDEQ- DMS Mitigation Plan Addendum Request: Lyon Hills Mitigation
Site (DMS#100085) - (SAW-2018-01784) (DWR#20181274) - Yadkin 03040101_Wilkes County
Casey, Erin, Kim, and Todd;
Wildlands Engineering Inc. (WEI) and DIMS are requesting a minor project change (crossing update from a
bridge to a culvert) on the Lyon Hills Mitigation Site. Proposed mitigation credits are not anticipated to
change based on the crossing update.
DMS understands that WEI has contacted the USACE and DWR and a 404/401 permit modification is not
necessary for this minor change.
The crossing change is documented in the attached mitigation plan addendum and will also be documented in
the project's post construction MYO - As -Built/ Record Drawing report.
Project construction is scheduled to begin on October 5, 2020.
Please review and let us know if have any questions, comments or concerns. Unless there is an issue, WEI
plans to begin construction on the site as scheduled.
Project information is as follows:
Lyon Hills Mitigation Site
DMS Project # 100085
Institution Date: 6/22/2018
RFP 16-007334 (Issued: 12/7/2017)
Yadkin River Basin
Cataloging Unit 03040101
Wilkes County, North Carolina
USACE Action ID: SAW-2018-01784
DWR#: 20181274
Proposed Mitigation Project Credits (per the IRT approved mitigation plan):
5,304.783 SMU (cool)
Full Delivery Provider: Wildlands Engineering Inc. (WEI) - Contact: Jeff Keaton, PE I Senior Water Resources
Engineer
0: 919.851.9986 x103 M: 919.302.6919
NCDEQ- DMS Project Manager: Kelly Phillips, kelly.phillips@ncdenr.gov <mailto:kelly.phillips@ncdenr.gov>,
(919) 723-7565
Thanks
Paul Wiesner
Western Regional Supervisor
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-273-1673 Mobile
paul.wiesner@ncdenr.gov <mailto:paul.wiesner@ncdenr.gov>
Western DMS Field Office
5 Ravenscroft Drive
Suite 102
Asheville, N.C. 28801
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
3