Loading...
HomeMy WebLinkAbout20181274 Ver 1_Mitigation Plan Addendum Request_20200923Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, September 23, 2020 9:27 AM To: Wiesner, Paul; Haywood, Casey M CIV (USA); Davis, Erin B; Tugwell, Todd J CIV USARMY CESAW (US) Cc: Jeff Keaton; Shawn Wilkerson; Xu, Lin; Phillips, Kelly D Subject: [External] RE: [Non-DoD Source] Notice of NCDEQ - DMS Mitigation Plan Addendum Request: Lyon Hills Mitigation Site (DMS#100085) - (SAW-2018-01784) (DWR# 20181274) - Yadkin 03040101_Wilkes County Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Thanks Paul. Since Erin, Todd and I already discussed this, we won't need a review period. I was a little confused about the tables since some of them discuss a 42-ft wide crossing but it's listed as a 40-ft easement break. Otherwise I'll just file this away for the As -Built review. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers -----Original Message ----- From: Wiesner, Paul <paul.wiesner@ncdenr.gov> Sent: Tuesday, September 22, 2020 6:09 PM To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Cc: Jeff Keaton <jkeaton@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Xu, Lin <lin.xu@ncdenr.gov>; Phillips, Kelly D <Kelly.Phi Ili ps@ncdenr.gov> Subject: [Non-DoD Source] Notice of NCDEQ- DMS Mitigation Plan Addendum Request: Lyon Hills Mitigation Site (DMS#100085) - (SAW-2018-01784) (DWR#20181274) - Yadkin 03040101_Wilkes County Casey, Erin, Kim, and Todd; Wildlands Engineering Inc. (WEI) and DIMS are requesting a minor project change (crossing update from a bridge to a culvert) on the Lyon Hills Mitigation Site. Proposed mitigation credits are not anticipated to change based on the crossing update. DMS understands that WEI has contacted the USACE and DWR and a 404/401 permit modification is not necessary for this minor change. The crossing change is documented in the attached mitigation plan addendum and will also be documented in the project's post construction MYO - As -Built/ Record Drawing report. Project construction is scheduled to begin on October 5, 2020. Please review and let us know if have any questions, comments or concerns. Unless there is an issue, WEI plans to begin construction on the site as scheduled. Project information is as follows: Lyon Hills Mitigation Site DMS Project # 100085 Institution Date: 6/22/2018 RFP 16-007334 (Issued: 12/7/2017) Yadkin River Basin Cataloging Unit 03040101 Wilkes County, North Carolina USACE Action ID: SAW-2018-01784 DWR#: 20181274 Proposed Mitigation Project Credits (per the IRT approved mitigation plan): 5,304.783 SMU (cool) Full Delivery Provider: Wildlands Engineering Inc. (WEI) - Contact: Jeff Keaton, PE I Senior Water Resources Engineer 0: 919.851.9986 x103 M: 919.302.6919 NCDEQ- DMS Project Manager: Kelly Phillips, kelly.phillips@ncdenr.gov <mailto:kelly.phillips@ncdenr.gov>, (919) 723-7565 Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner@ncdenr.gov <mailto:paul.wiesner@ncdenr.gov> Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3