Loading...
HomeMy WebLinkAbout20180665 Ver 1_IRT Review Request As-Built Baseline Monitoring Report (MY0)_20201005Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Monday, October 5, 2020 9:51 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J; Byron Hamstead; Munzer, Olivia Cc: Tsomides, Harry; Shawn Wilkerson; Aaron Earley; Allen, Melonie; Stanfill, Jim; Harmon, Beth; Wiesner, Paul; Smith, Ronnie D CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA) Subject: [External] IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Alexander Farm Stream Mitigation Site (DMS#100048) - (SAW-2018-00451) (DWR#20180665) - Catawba River Basin HUC 03050101 Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning all, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: October 05, 2020 15-Day Comment Deadline: October 20, 2020 45-Day Credit Release Approval Deadline: November 19, 2020 Proiect information and location of the FINAL As -Built Baseline Monitorine Resort (MY0): Alexander Farm Stream Mitigation Site DMS Project # 100048 USACE # SAW-2018-00451 DWR # 20180665 RFP: 16-007277 — Issued 06/21/2017 Institution Date: 01/26/2018 — Full Delivery Catawba River Basin Cataloging Unit 03050101 Alexander County, North Carolina Proposed Mitigation Plan Assets: 4,258.100 S M U s As -Built MYO Protect Credits: 4,258.100 S M U s Mitigation Plan Lengths/ Acreages: 6,555 linear ft. As-Built-MYO Lengths/ Acreages: 6,519 linear ft. Provider: Wildlands Engineering; Contact: Aaron Earley aearlev@wildlandseng.com Tel. 828-253-6856 NCDEQ- DIMS PM: Harry Tsomides, harry.tsomides@ncdenr.gov, 828-545-7057 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page (Updated): https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx AlexanderFarm_100048_MYO_2020. pdf https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Alexander%20Farm/AlexanderFarm 100048 MYO 2020.pdf?csf=1&web=1&e =C' IggC' Alexa nderFa rm_100048_AB_2020. pdf https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Alexander%20Farm/AlexanderFarm 100048 AB 2020.pdf?csf=1&web=1&e=D 31klm Please contact the Mitigation Office if you have any questions. V/ r, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 BUILDING STRONG