HomeMy WebLinkAbout20180665 Ver 1_IRT Review Request As-Built Baseline Monitoring Report (MY0)_20201005Strickland, Bev
From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Monday, October 5, 2020 9:51 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Bowers, Todd;
Wilson, Travis W.; Leslie, Andrea J; Byron Hamstead; Munzer, Olivia
Cc: Tsomides, Harry; Shawn Wilkerson; Aaron Earley; Allen, Melonie; Stanfill, Jim; Harmon,
Beth; Wiesner, Paul; Smith, Ronnie D CIV USARMY CESAW (USA); McLendon, C S CIV
USARMY CESAW (USA)
Subject: [External] IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Alexander
Farm Stream Mitigation Site (DMS#100048) - (SAW-2018-00451) (DWR#20180665) -
Catawba River Basin HUC 03050101
Follow Up Flag: Follow up
Flag Status: Completed
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning all,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: October 05, 2020
15-Day Comment Deadline: October 20, 2020
45-Day Credit Release Approval Deadline: November 19, 2020
Proiect information and location of the FINAL As -Built Baseline Monitorine Resort (MY0):
Alexander Farm Stream Mitigation Site
DMS Project # 100048
USACE # SAW-2018-00451
DWR # 20180665
RFP: 16-007277 — Issued 06/21/2017
Institution Date: 01/26/2018 — Full Delivery
Catawba River Basin
Cataloging Unit 03050101
Alexander County, North Carolina
Proposed Mitigation Plan Assets:
4,258.100 S M U s
As -Built MYO Protect Credits:
4,258.100 S M U s
Mitigation Plan Lengths/ Acreages:
6,555 linear ft.
As-Built-MYO Lengths/ Acreages:
6,519 linear ft.
Provider: Wildlands Engineering; Contact: Aaron Earley aearlev@wildlandseng.com
Tel. 828-253-6856
NCDEQ- DIMS PM: Harry Tsomides, harry.tsomides@ncdenr.gov, 828-545-7057
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page (Updated):
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
AlexanderFarm_100048_MYO_2020. pdf
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Alexander%20Farm/AlexanderFarm 100048 MYO 2020.pdf?csf=1&web=1&e
=C' IggC'
Alexa nderFa rm_100048_AB_2020. pdf
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Alexander%20Farm/AlexanderFarm 100048 AB 2020.pdf?csf=1&web=1&e=D
31klm
Please contact the Mitigation Office if you have any questions.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG