HomeMy WebLinkAbout20171156 Ver 1_Meeting Minutes 9 15 2020 IRT Site Visit_20200918Strickland, Bev From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Good morning; Wiesner, Paul Friday, September 18, 2020 9:12 AM Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Kim Browning; Haywood, Casey M CIV (USA) Reid, Matthew; tomsic@waterlandsolutions.com; Cara Conder; Kayne Van Stell Meeting Minutes: 9/15/2020 IRT Site Visit - As -Built Baseline Monitoring Report (MYO) - Horne Creek Tributaries (DMS#100026) - (SAW-2017-01510) (DWR# 20171156) - Yadkin 03040101 (Surry County) Horne Cr. Tributaries_100026_MYO Site Visit Meeting Minutes_09-15-20.pdf Follow up Flagged The meeting minutes from the September 15, 2020 IRT site visit are attached for your review. Please let us know if you have any questions, comments, additions or concerns. The final meeting minutes will be included in the 2020 MY1 report. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile Pau l.wiesner(cancdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 D_ E Q F��` -�Nle� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Haywood, Casey M CIV (USA)[mailto:Casey.M.Haywood@usace.army.mi1] Sent: Thursday, August 27, 2020 9:57 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; Byron Hamstead <byron_Hamstead@fws.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil>; McLendon, C S CIV USARMY CESAW (USA) <Scott.C.McLendon@usace.army.mil>; Crumbley, Tyler A <Tyler.A.Crumbley@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; tomsic@waterlandsolutions.com; Wiesner, Paul <paul.wiesner@ncdenr.gov> Subject: [External] RE: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Horne Creek Tributaries (DMS#100026) - (SAW-2017-01510) (DWR#20171156) - Yadkin 03040101 (Surry County) External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Please note the following: A site visit with DMS is scheduled for September 15, 2020 and comments will be due September 30, 2020. Thank you, Casey Haywood From: Haywood, Casey M CIV (USA)<CaseV.M.Haywood@usace.army.mil> Sent: Thursday, August 27, 2020 6:23 PM To: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; 'Wilson, Travis W. <travis.wilson@ncwildlife.org>; 'Bowers, Todd <bowers.todd@epa.gov>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Byron Hamstead <byron Hamstead@fws.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil>; McLendon, C S CIV USARMY CESAW (USA) <Scott.C.McLendon@usace.army.mil>; Crumbley, Tyler A<TVIer.A.Crumblev@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Cc: Reid, Matthew <matthew.reid@ncdenr.goy>; tomsic@waterlandsolutions.com; Wiesner, Paul <paul.wiesner@ncdenr.gov> Subject: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Horne Creek Tributaries (DMS#100026) - (SAW-2017-01510) (DWR#20171156) - Yadkin 03040101 (Surry County) Good morning, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: August 27, 2020 15-Day Comment Deadline: September 11, 2020 45-Day Credit Release Approval Deadline: October 11, 2020 2020 is Monitoring Year 1 for this project. Proiect information and location of the FINAL As -Built Baseline Monitorine Resort (MY0): Horne Creek Tributaries Site DMS Project # 100026 RFP# 16-006993 — Issued 9/16/2016 Institution Date: 5/25/2017 — Full Delivery Yadkin River Basin Cataloging Unit 0304101 Surry County, North Carolina Mitigation Plan Protect Credits: 5,389.000 SMUs (warm) As-Built-MYO Protect Credits: 5,389.000 SMUs (warm) Mitigation Plan Lengths/ Acreages: 5,428 ft. As-Built-MYO Lengths/ Acreages: 5,428 ft. FD Provider: Water & Land Solutions — Contact: Christopher Tomsic, tomsic@waterlandsolutions.com, (828) 493-3287 NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page (Updated): Blockedhttps://ncconnect.sharepoi nt.com/sites/1 RT-DMS/SitePages/Home.aspx HorneCrk_100026_MYO_2020. pdf Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/As Built%20ReDort%20%20Drawinia/Forms/AIIItems. asox?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20ReDort%20% 20Drawing%2FHorne%20Creek%20%28100026%29%2FHorneCrk%5F100026%5FMYO%5F2020%2Epdf&parent=%2Fsites %2F1 RT%2DDMS%2FAsBu i It%20Reoort%20%20Drawi nia % 2FHorne%20Creek%20%28100026%29 HorneCrk_100026_AB_2020. pdf Blockedhttps://ncconnect.sharepoint.com/sites/IRT- DMS/AsBuilt%20ReDort%20%20Drawinia/Forms/Allitems.asDx?id=%2Fsites%2FIRT%2DDMS%2FAsBuilt%20ReDort%20/ 20Drawi ng%2FHorne%20Creek%20%28100026%29%2FHorneCrk%5F100026%5FAB%5F2020%2Epdf&parent=%2Fsites% 2F1RT%2DDMS%2FAsBuiIt%20Reoort%20%20Drawinia 2FHorne%20Creek%20%28100026%29 Please let me know if you have questions or call to discuss. V/ r, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 BUILDING STRONG WATER & LAND SOLUTIONS Meeting Minutes Horne Creek Tributaries Mitigation Project, DMS Project ID #100026 USACE Action ID#: SAW-2017-01510 Subject: NCIRT Horne Creek Tributaries As -Built Baseline Site Visit Date Prepared: September 16t", 2020 Meeting Date and Time: September 15t", 2020 10:30 am —1:30 pm Meeting Location: Kiger Road, Pinnacle, NC (36.28257,-80.50831) Recorded By: Cara Conder Attendees: USACE: Todd Tugwell NCDEQ DWR: Erin Davis DMS: Matthew Reid, Paul Wiesner WLS: Kayne VanStell, Cara Conder, and Kyle Obermiller These meeting minutes document notes and discussion points from the North Carolina Interagency Review Team (NCIRT) As -Built Baseline Site Meeting for the Horne Creek Tributaries Mitigation Project (Yadkin River Basin, CU 03040101, Warm Water Thermal Regime). Water & Land Solutions, LLC (WLS) submitted a Final As -Built Baseline Monitoring Report on August 3rd, 2020 and the site visit was held on September 151", 2020. The meeting began with a general summary of the overall project construction and dates. These meeting minutes proceed in order of discussion. 1. Erin Davis asked for a redline vegetation table in the as -built and also noted that there was not a planting list provided with quantities and species. WLS has corrected the oversight and attached the planting list to these meeting minutes. 2. Erin Davis asked if WLS had maximum depths of the vernal pools on the as -built drawings. Kayne VanStell responded that there are no depths on the as -built drawings, and these are actually floodplain depressions for storage and not vernal pools. Floodplain depression depths range 6-14 inches, but it was noted the contractor installed brush at the bottom and the water surface elevations will fluctuate over time based on seasonal water table and rainfall events. 3. Erin Davis noted that there is riprap on the inlets and outlets on the BMPs. Kayne stated that the stone outlet is added protection for headcutting and erosion. waterlandsolutions.com 1 7721 Six Forks Rd, Ste 130, Raleigh, NC 27615 1 919-614-5111 WATER & LAND SOLUTIONS 4. Todd Tugwell and Erin Davis asked if any project areas had buffer widths less than 30 ft. WLS responded that there were a few areas, but this was addressed in the mitigation plan and WLS utilized the non- standard buffer tool, as there are many areas of the site with buffers wider than 30 ft. 5. Todd Tugwell asked when planting was completed. Cara Conder stated April 30tn 6. Erin Davis requested to mention weather/rain delays in future reports as needed. Kayne VanStell did confirm WLS had construction delays due to significant and timely rain events on this site. 7. Erin Davis requested to add all non -credited wetland areas to the CCPV. The revised CPPV is attached to these meeting minutes. 8. Erin Davis stated to address cattails in BMP or buffer (preferably by hand removal) if they become a monoculture. 9. Todd Tugwell said that going forward do not use smooth/non-corrugated pipes in crossings. 10. Todd Tugwell asked if WLS has concerns about vegetation establishing on the steeper side slopes. Kayne VanStell responded yes, WLS does have concerns on excavated side slopes <3:1, but we have not observed any rills after multiple bankfull storm events with overland flows, so we will continue to monitor the vegetation and side slope areas. 11. Todd Tugwell noted that on the lower section of R1 there is a side channel starting to form. WLS will continue to monitor this area and repair/stabilize if needed. 12. Todd Tugwell noted that some of the structure drops on R5 are steep and asked if they match the mitigation design plan. Kayne VanStell said the construction did not deviate from the mitigation plan design. 13. Paul Wiesner asked why the pipes in the crossings are skewed. Kayne VanStell said the easement boundary was finalized before the final design approval and some adjustments were made during construction. WLS noted they will monitor for any scour areas in the channel or side slopes associated with the skew angles. 14. Todd Tugwell noted that the invert of the downstream pipe on R4 was too high. Kayne VanStell agreed and said WLS will monitor and lower the invert (bury the pipe) or raise the downstream rifle invert elevation if needed. 15. Erin Davis requested to add a photo point of the slope on the right side of R4 for vegetation establishment. 16. Erin Davis requested to add a camera or flow gauge to upper portion of R2. WLS will likely install a flow gauge instead of a camera. waterlandsolutions.com 1 7721 Six Forks Rd, Ste 130, Raleigh, NC 27615 1 919-614-5111 WATER & LAND SOLUTIONS 17. DMS noted that during their as -built site visit in July there was some minor easement encroachment from mowing on R2/R3. WLS addressed this with the landowner and they now understand that not even fescue can be mowed. WLS had installed horse tape around the easement markers in August and this encroached area is re-establishing. The landowner did not cut down any trees; however, this fall WLS will install another row of trees closer to the easement boundary. WLS will continue to closely monitor this area for any easement encroachment. It was also noted that the landowner requested the wooden markers instead of the t-posts. Todd Tugwell noted that split rail fence can be used to demarcate the easement boundary and Erin Davis mentioned planting additional trees/shrubs could be used as well to help aid with the boundary. Paul Wiesner discussed a new bollard spec that DMS has used recently, which landowners have liked visually. DMS will have Jeff Horton contact WLS with the bollard specs. WLS will discuss other easement demarcation options with the landowner and DMS if needed. USACE Summary (Todd Tugwell): • Concerned about the height of structure drops. • Continue to monitor the crossings/pipes for the angles and smooth material. There is nothing to address right now. • Monitor the vegetation on the side slopes as herbaceous layer is sparse on some areas. • There are 1-2 structures piping. • Monitor the floodplain pool depths, response to rainfall and surface/subsurface flow interaction. DWR Summary (Erin Davis): • Apply an additional seed mix to the side slopes. • The site does not have any major invasive species issues, but continue to monitor cattails and morning glory. • Erin asked if WLS has any random vegetation plots. There are no random plots on this site and all the plots are permanent. WLS will continue to monitor the vegetation on the site and if there are any issues in the future, WLS may add 1-2 random vegetation plots to monitor vegetation. waterlandsolutions.com 1 7721 Six Forks Rd, Ste 130, Raleigh, NC 27615 1 919-614-5111 Horne Creek Tributaries - Final Plant Quantities Common Name Species Stems Percent Planted Mitigation Plan Percent Green ash Fraxinus pensylvanica 250 3.4% 3.0% River birch Betula nigra 500 6.7% 7.0% Basswood Tilia americana 500 6.7% 7.0% Black gum Nyssa sylvatica 450 6.0% 6.0% American sycamore Platanus occidentalis 500 6.7% 7.0% Tulip poplar Liriodendron tulipifera 500 6.7% 7.0% Northern red oak Quercus rubra 250 3.4% 3.0% White oak Quercus alba 450 6.0% 6.0% Persimmon Diospyros virginiana 500 6.7% 7.0% I IrnhreIIa .. .,4 0 07G% &G% Redbud Cercis canadensis 400 5.4% 0.0% American hornbeam Carpinus caroliniana 450 6.0% 6.0% Witch hazel Hamamelis virginiana 450 6.0% 6.0% Pawpaw Asimina triloba 900 12.1% 6.0% Spicebush Lindera benzoin 450 6.0% 6.0% Tag alder Alnus serrulata 450 6.0% 6.0% Hazelnut Corylus americana 4501 6.0%1 6.0% Total Planted 1 7,4501 100.0%1 *changes from mitigation plan in red TM WATER & LAND SOLUTIONS Horne Creek Tributaries Mitigation Project Slurry County, North Carolina USACE Action ID Number: SAW-2017-01510 DMS project number: 100026 May 2020 MYO Current Conditions Plan view Monitoring Year 0 FIGURE NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US TM WATER & LAND SOLUTIONS Horne Creek Tributaries Mitigation Project Slurry County, North Carolina USACE Action ID Number: SAW-2017-01510 DMS project number: 100026 May 2020 MYO Current Conditions Plan view Monitoring Year 0 FIGURE 1 a NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US Conservation Easement Fence •33+$00 Top of Bank 32+0o Restoration �r 31+00'- R4A ' 4�_ . 30+0o R4B w Enhancement II - :,,.. . >29+0o VP6 �... • Flow Gauge 1 (688).:= "<; = Photo Station Cross Sections Vegetation Plot Stem Count VP 28+00 12+24 r•w: (6 8) Water Quality Feature 8 25+00 �.', :� 27+00 ' 26+00 ` .. �:-:. W t Q lity F t 12+55 10� 98 ' �• + l� ^� ;,,, ,i ;� _ ;�,�y. s , � Existing Wetland (No Credit) 4 0 .r Minor:piping; grade log j-hook vane (sta 19+55) Culvert 1. ;. 23+00 r. .. .. R5 20+00 19+00 -- .. 22 U` +00/ 18+00 17+00 601 ot L;� -' e � x �;•. -- ems--" J � � � _ - VP5 TJ r �� .3s, , 1�16a = VP4 �R4 2 , r 14+00 10+51 12+00 a . :. 1� 4. .....,11 Az �Wa R2R: °' } f 10+00 ` � � � � ... •'��.'"r .lye . r TM WATER & LAND SOLUTIONS Horne Creek Tributaries Mitigation Project Surry County, North Carolina USACE Action ID Number: SAW-2017-01510 DMS project number: 100026 May 2020 MYO Current Conditions Plan View Monitoring Year 0 FIGURE 1 b NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US Conservation Easement Fence 1� - — Top of Bank 40+00, 39+00 ,38+00 ;.: 36 00 a Access: 36.282164,-80.503379 ..' - • ..::..i.' .'...:.;x::•:„ .. ��" �"' S.. . VDR .35+00 • S jeye jMrthst z 100 200 trr' ti Source: E'sri, DigitalGlobe, Ger Geographics, CNES/Air M WATER & LAND SOLUTIONS Horne Creek Tributaries Mitigation Project Slurry County, North Carolina USACE Action ID Number: SAW-2017-01510 DMS project number: 100026 May 2020 MYO Current Conditions Plan view Monitoring Year 0 FIGURE NAD 1983 2011 State Plane North Carolina FIPS 3200 FT US