HomeMy WebLinkAbout20150416 Ver 1_NOTICE IRT Review Request As-Built Baseline MR (MY0)_20200917Strickland, Bev
From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Thursday, September 17, 2020 10:54 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Byron Hamstead; Bowers,
Todd; Davis, Erin B; Haywood, Casey M CIV (USA); Leslie, Andrea J; Wilson, Travis W.
Cc: Reid, Matthew; Allen, Melonie; Wiesner, Paul; katie mckeithan; King, Scott
Subject: [External] NOTICE: IRT Review Request: As -Built Baseline Monitoring Report (MYO) -
Russell Gap (DMS#100003) - (SAW-2017-00826) (DWR#20150416) - Catawba
03050101 (Alexander County)
Follow Up Flag: Follow up
Flag Status: Completed
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning all,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: September 17, 2020
15-Day Comment Deadline: October 02, 2020
45-Day Credit Release Approval Deadline: November 02, 2020
Protect information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Russell Gap Mitigation Site
DMS Project # 100003
RFP# 16-006807 — Issued 2/15/2016
Institution Date: 9/15/2016 — Full Delivery
SAW-2017-00826
DWR# 20150416
Catawba River Basin
Cataloging Unit 03050101
Alexander County, North Carolina
Mitigation Plan Protect Credits:
9,166.960 SMUs (warm)
7.053 WMUs (riparian)
As-Built-MYO Protect Credits:
9,166.949 SMUs (warm)
7.053 WMUs (riparian)
Mitigation Plan Lengths/ Acreages:
12,519.16 ft.
7.332 ac.
As-Built-MYO Lengths/ Acreages:
12,507 ft.
7.332 ac.
FD Provider: Michael Baker Engineering —Contact: Katie McKeithan, Katie. McKeithan@mbakerintl.com, (919) 481-
5703
NCDEQ- DMS PM: Matthew Reid, matthew.reid@ncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site
here:
IRT-DMS SharePoint Page (Updated):
Blockedhttps://ncconnect.sharepoi nt.com/sites/1 RT-DMS/SitePages/Home.aspx
Russel IGa p_100003_MYO_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%20Drawi ng/Forms/AI Iitems.aspx?id=%2Fsites%2FI RT%2DDMS%2FAsBuilt%20Report%20/
20Drawing 2FRussell%20Gap%20%28100003%29%2FRussellGap%5F100003%5FMYO%5F2020%2Epdf&parent=%2Fsites
%2F1 RT%2DDMS%2FAsBu i It%20Report%20%20Drawi ng%2FRussell%20Ga p%20%28100003%29
Russel IGa p_100003_AB_2020. pdf
Blockedhttps://ncconnect.sharepoint.com/sites/IRT-
DMS/AsBui lt%20Report%20%20Drawi ng/Forms/AI Iitems.aspx?id=%2Fsites%2FI RT%2DDMS%2FAsBuilt%20Report%20/
20Drawing 2FRussell%20Gap%20%28100003%29%2FRussellGap%5F100003%5FAB%5F2020%2Epdf&parent=%2Fsites%
2F1RT%2DDMS%2FAsBuiIt%20Reoort%20%20Drawinia 2FRussell%20GaD%20%28100003%29
Please contact the Mitigation Office if you have any questions.
V/ r,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1
BUILDING STRONG