HomeMy WebLinkAboutNCC204591_NOI Application_20201020Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 10/11/2020 3:43:11 PM (NCG01 NOI Submission)
Approve by Clark, Paul 10/12/2020 9:30:48 AM (Review- Construction NOI 32895)
• The task was assigned to Clark, Paul by round robin distribution 10/11/2020 3:43 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 14, 2020 5:00
PM 10/11/2020 3:43 PM
Submit by Selkane, Aziza 10/20/2020 3:06:40 PM (Payment Verification for NCC204591)
* Dan Ryan Builders
• Selkane, Aziza assigned the task to Selkane, Aziza 10/20/2020 3:06 PM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 23, 2020 5:00
PM 10/12/2020 9:31 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Weavers Pond Phase 8
1 b. Specific Lot This field rray be used to list specifc lot numbers.
Numbers Lots 442-448, 478-524, 531-545
2. County* Wake
3. Highway or Street Lacewing Drive
Address* Street narre only is acceptable if no address number assigned yet
4.CityorTownship* Zebulon
5. State * NC
6. Zip Code * 27597
7. Latitude* Enter the latitude in decirral degrees
35.8650
8. Longitude* Enter the longitude in decir al degrees (M.JST be negative)
-78.3295
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
10/12/2020
Estimated Construction Project Start Date
10. Date to End*
10/11/2021
Estinated Construction Project End Date
11. SIC (Primary)*
Residential, Single Family Houses (SFE) (1521)
Standard Industrial Classification for Developrrent
12. Acres to be
15.37
disturbed*
(including off -site borrow and waste areas)
13. Total site area 38.45
(acres) *
14. Post- 4.00
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-WAKE-2020-Weavers Pond Phase 8
Tracking ID Assigned autonaticaly
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Beaverdam Creek
Waterbody* %rm of waterbody into which storrrwater runoff will discharge
15b. Waterbody 27-86-2-3
Index No.* NCWaterbody Index Nurrber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Dan Ryan Builders
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Jay
If Corporation, enter Faegistered Agent First %rre
3. Last Name* Lewis
It Corporation, enter Pbegistered Agent Last %rre
3b. Title Division President
4. Permitee E-mail jlewis@drbgroup.com
Address*
5. Permittee 919-478-8149
Telephone No.*
6. Permittee Mailing Street Address
Address* 3000 RDU Center Drive
Address Line 2
Suite 202
City State / Frovince / Fbgion
Morrisville NC
Fbstal / Zip Code Country
27560 USA
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
3000 RDU Center Drive
Address Line 2
Suite 202
City
State / Ftovince / Region
Morrisville
NC
Fbstal / Zip Code
Country
27560
USA
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Randy
Contact - First
Name *
2. Primary Site
Talton
Contact - Last
Name *
3. Title
Land Development Project Manager
4. Site Contact E-
rtalton@drbgroup.com
mail Address*
5. Site Contact
919-478-8149
Telephone No.
6. Organization
Dan Ryan Builders
Name
7. Site Contact
Street Address
Mailing Address*
3000 RDU Center Drive
Address Line 2
Suite 202
city
Morrisville
Postal / Zip Code
27560
8. Consultant Name
(Optional)
Andrea Agee
First and Last nacre
9. Consultant E-mail
aagee@thenauco.com
This person will be copied on all correspondence.
10. Consultant
703-785-9115
Telephone No.
State / Province / Region
NC
Country
USA
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 09/17/2020
Approved *
2. E&SC Plan Project SEC-041582-2020
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Wake County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan
SEC-041582-2020_Approval-
Approval letter or
S&EConstructionPlan ReviewChecklist-V.2 WM 9- 294.74KB
Grading Permit
17-20.pdf
Mast be RFfornat
6. Site Location Map
Helpful for linear project review
(Optional)
Wst be FDFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional)
Ffovide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies for linear projects if necessary.
8. NOI Certification
NCG01-eNO1-Certification-Form-Signed.pdf 37.83KB
Form
Mast be R7Ffon-rat
This is an Express
F No
Review Project*
r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* Jay Lewis
Title Division President
Organization Legally Ibsponsible Entity
Dan Ryan Builders
Date * 10/11 /2020
F. Tracking and COC Info
NOI Tracking No. 32895
NC Reference No. NCG01-2020-4591
Uses 'count_nunber' variable (increrrented by SP)
Certificate of NCC204591
Coverage (COC) Uses 'count nurrber' variable (increrrented by SP)
No.*
Count Number 4591
Sequential nunber for subnittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC204591-2020
Invoice Due Date 11/11/2020
Initial Fee $ 100.00
Invoice Status OPEN