Loading...
HomeMy WebLinkAboutNCC203810_ESC Approval Submitted_20201020ROY COOPER Governor, wl i '�O MICHAEL S. REGAN Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality August 18, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Pinnacle Homes USA, LLC Attention: Ben Russell, Manager 4389 Indian Trail -Fairview Road Indian Trail, North Carolina 28079 RE: Project Name: Serena Hill Lots 5-8 Acres Approved: 3.77 Project ID: UNION-2020-073 County: Union, City: Unionville Address: E. Unionville -Indian Trail Rd. River Basin: Yadkin -Pee Dee Stream Classification: Other Submitted By: Matthew Kirchner, PE, Eagle Engineering Date Received by LQS: August 4, 2020 Plan Type: Revised Dear Mr. Russell: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Mooresville Regional Office S 610 East Center Avenue, Suite 301 i Mooresville, North Carolina 28115 n<;rzrEca!;:;rn Uepa entorEneho n1a,(watity 704.663.1699 Letter of Approval with Modification August 18, 2020 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Matthew Kirchner, PE Letter of Approval with Modification August 18, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Serena Hill Lots 5-8 Project ID: UNION-2020-073 County: Union 1. Stone outlets in the silt fence shall have 12" washed stone on the upstream face.