From: Chris L. Windley [CWindley@mckimcreed.com]
Sent: Thursday, March 18, 2010 11:16 AM
To: Mcmillan, Ian
Cc: tcolson@fandr.com; Tyler.crumbley@usace.army.mil
Subject: 30 day extension request - Poplar Creek Sewer Line
Ian,
Per our discussion, I am requesting a 30 day extension for response to the additional information
requested in the February 19, 2010 letter to Aaron Brower with the City of Raleigh PUD for the Poplar
Creek Sewer Line. The equivalent day we discussed was April, 16, 2010. As I mentioned we need
additional time to incorporate the permanent impacts for riprap along stream banks into the impact
maps and PCN tables. I anticipate we will have a complete response to the letter next week to be
well within the 30-day extension period. Likewise we will respond to the USACOE letter at the same
time.
Thanks,
Chris
Chris L. Windley, PE
Project Engineer
McKW&CREED
N? INE?f ; Yi)Rl, PLANN[
1730 Varsity Drive, Suite 500
Raleigh, NC 27606
919.233.5261 x168
919.233.8031 fax
919.417.3069 mobile
http://www. mcki mcreed.com
Follow us on:
YouTube I twitter I facebook I Linkedln
A Please consider the environment before printing this e-mail.
This e-mail and any files transmitted with it are confidential
and intended solely for the use of the individual or entity to
whom they are addressed. If you have received this e-mail in
error please notify the system manager. Please note that any
views or opinions presented in this e-mail are solely those of
the author and do not necessarily represent those of the
company. Finally, the recipient should check this e-mail and
any attachments for the presence of viruses. The company
accepts no liability for any damage caused by any virus
transmitted by this e-mail.
1