Loading...
HomeMy WebLinkAbout20100110 Ver 1_Time Ext Request_20100318Mcmillan, Ian From: Chris L. Windley [CWindley@mckimcreed.com] Sent: Thursday, March 18, 2010 11:16 AM To: Mcmillan, Ian Cc: tcolson@fandr.com; Tyler.crumbley@usace.army.mil Subject: 30 day extension request - Poplar Creek Sewer Line Ian, Per our discussion, I am requesting a 30 day extension for response to the additional information requested in the February 19, 2010 letter to Aaron Brower with the City of Raleigh PUD for the Poplar Creek Sewer Line. The equivalent day we discussed was April, 16, 2010. As I mentioned we need additional time to incorporate the permanent impacts for riprap along stream banks into the impact maps and PCN tables. I anticipate we will have a complete response to the letter next week to be well within the 30-day extension period. Likewise we will respond to the USACOE letter at the same time. Thanks, Chris Chris L. Windley, PE Project Engineer McKW&CREED N? INE?f ; Yi)Rl, PLANN[ 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919.233.5261 x168 919.233.8031 fax 919.417.3069 mobile http://www. mcki mcreed.com Follow us on: YouTube I twitter I facebook I Linkedln A Please consider the environment before printing this e-mail. This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. 1