HomeMy WebLinkAbout20200797 Ver 1_More Info Received_20200902Tim Fisher’s Gold Dredge Stream Relocation
The project engineer has redesigned the stream relocation in response to the applicant
obtaining additional land that will allow the relocation to be significantly shorter. This
demonstrates a tremendous reduction in land disturbance in this area and will result in
less stream channel being abandoned resulting from the necessary relocation.
Original
Plans
July 2020
Revised Plans
September 2020 Notes
Abandoned channel 429 LF 282 LF
50 LF of the abandoned
channel length comprises
the unauthorized
excavation area
New channel 493 LF 396 LF
Wetland impact 1,874 SF 1,874 SF
Temporary impact from
possible construction
activities
Stream Impact 20 LF 20 LF Culvert for access
Zone 1 Permanent
Buffer Impact 1,265 SF 1,265 SF Resulting from the
unauthorized excavation
Zone 2 Permanent
Buffer Impact 6,528 SF 6,528 SF Resulting from the
unauthorized excavation
Zone 1 Buffer
Abandoned 12,943 SF 15,064 SF
Zone 2 Buffer
Abandoned 13,224 SF 7,691 SF
Zone 1 Buffer Added 17,783 SF 16,274 SF
Zone 2 Buffer Added 20,477 SF 11,311 SF