HomeMy WebLinkAbout20200797 Ver 1_More Info Received_20200902Tim Fisher’s Gold Dredge Stream Relocation The project engineer has redesigned the stream relocation in response to the applicant obtaining additional land that will allow the relocation to be significantly shorter. This demonstrates a tremendous reduction in land disturbance in this area and will result in less stream channel being abandoned resulting from the necessary relocation. Original Plans July 2020 Revised Plans September 2020 Notes Abandoned channel 429 LF 282 LF 50 LF of the abandoned channel length comprises the unauthorized excavation area New channel 493 LF 396 LF Wetland impact 1,874 SF 1,874 SF Temporary impact from possible construction activities Stream Impact 20 LF 20 LF Culvert for access Zone 1 Permanent Buffer Impact 1,265 SF 1,265 SF Resulting from the unauthorized excavation Zone 2 Permanent Buffer Impact 6,528 SF 6,528 SF Resulting from the unauthorized excavation Zone 1 Buffer Abandoned 12,943 SF 15,064 SF Zone 2 Buffer Abandoned 13,224 SF 7,691 SF Zone 1 Buffer Added 17,783 SF 16,274 SF Zone 2 Buffer Added 20,477 SF 11,311 SF