Loading...
HomeMy WebLinkAboutNCC204673_ESC Approval Submitted_20201019ROY COOPER Governor MICHAEL S. REGAN 5ecrerary BRIAN WRENN Actk1g Direclvr NORTH CAROLINA Environmental Quality June 3, 2020 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Taylor Morrison of Carolinas, Inc. Attention: Alan Kerley, Vice president 1410 West Morehead Street, Suite 100 Charlotte, North Carolina 28208 RE: Project Name: Terraces at Farmington Acres Approved: 22.4 Project ID: CABAR-2020-076 County: Cabarrus City: Harrisburg Address: Misty Hill Lane & Clear Creek Lane River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Taylor Morrison of Carolinas, Inc. Date Received by LQS: May 12, 2020 Plan Type: New Dear Mr. Kerley, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and' found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette. lacas@nedenngov or Paul Clark at Patil.clark(@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413 .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. EMoorNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources esville Regional Office 16]O: East Center Avenue, Suite 3.01 1 Mooresville, North Carolina 28US Q Letter of Approval with Modifications and Performance Reservations Taylor Morrison of Carolinas, Inc. June 3, 2020 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. S , ly, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: McAdams Attention: Michael D. Duval, PE 3430 Toringdon Way Suite 110 Charlotte, North Carolina 28277 Inspection Department Letter of Approval with Modifications and Performance Reservations Taylor Morrison of Carolinas, Inc. June 3, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Terraces at Farmington Project ID: CABAR-2020-076 County: Cabarrus 1. A 30' stream buffer is being shown on the plans. However, land disturbance and proposed measures are located within the stream buffer. Stream buffers are to be undisturbed. Relocate all proposed land disturbance and measures out of the stream buffer. Revise plans as necessary. 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]