Loading...
HomeMy WebLinkAbout20090266 Ver 1_Emails_20100317Mcmillan, Ian From: Dramby, Shearin [SDramby@BrwnCald.com] Sent: Wednesday, March 17, 2010 10:34 AM To: Pelletier, Josh R SAW; Mcmillan, Ian Subject: RE: GUC Extension- Urgent Importance: High Josh/Ian, Molly is out of the office today. Since today is the deadline, can we at least get a temporary extension via email today until she has time to review the information we submitted and make a formal decision? Our hands are tied at this point. Please advise. Thanks, Juanita Shearin Dramby Brown and Caldwell SDramby(@brwncald.com T 919.424.1433 -----Original Message----- From: Pelletier, Josh R SAW [mailto:Josh.R.Pelletier(@usace.army.mil] Sent: Wednesday, March 17, 2010 7:56 AM To: Ellwood, Molly M. Cc: Dramby, Shearin Subject: RE: GUC Extension Molly, I am forwarding you're your email to Shearin Dramby. She is my contact on this project and she will be able to answer all of your questions. You can PDF us a letter if that works for you. As soon as we get the go head from you guys we will get things rolling on our end. Thanks so much and let me know if you have any other questions. Thanks Josh R. Pelletier Regulatory Specialist United States Army Corps of Engineers Washington Regulatory Field Office Post Office Box 1000 Washington, North Carolina 27889 (252) 975-1616 ext 34 -----Original Message----- From: Ellwood, Molly M. [mailto:molly.ellwood@ncwildlife.org] Sent: Tuesday, March 16, 2010 6:15 PM To: Pelletier, Josh R SAW Subject: RE: GUC Extension Hey Josh, 1 I have been able to pretty much coordinate with everyone that I need to coordinate with on this and I want to make sure of a couple of details. I am assuming that all the work that GUC still needs to do is all within the coffer dams, right? Secondly, how quickly can the dams be removed, a couple of hours, a day? When they remove the dams would there be a lot of hammering and other disturbances? I will try and call you tomorrow, but if not, I will be in a meeting all day. Oh, one more thing, do require a letter head, or just an email for the extension request? Thanks, Molly Molly Ellwood Southeast Permit Coordinator NC Wildlife Resources Commission 127 Cardinal Drive Ext. Wilmington, NC 28405 (910) 796-7240 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. -----Original Message----- From: Pelletier, Josh R SAW [mailto:Josh.R.Pelletier@usace.army.mil] Sent: Thursday, March 11, 2010 4:30 PM TO: Ellwood, Molly M. Subject: GUC Extension Molly, We met with those guys yesterday and I am going to recommend that we give them until the end of March. I don't want to give them too much leeway on this thing but they should be able to get done what they need to get done by them. If the weather prevents them from having the coffer cell out by then, I suggest we revisit the issue at that time. Anyway just let me know what you think. Thanks for all your help on this Josh R. Pelletier Regulatory Specialist United States Army Corps of Engineers Washington Regulatory Field Office Post Office Box 1000 Washington, North Carolina 27889 (252) 975-1616 ext 34 2