From: Dramby, Shearin [SDramby@BrwnCald.com]
Sent: Wednesday, March 17, 2010 10:34 AM
To: Pelletier, Josh R SAW; Mcmillan, Ian
Subject: RE: GUC Extension- Urgent
Importance: High
Josh/Ian,
Molly is out of the office today. Since today is the deadline, can we at least get a
temporary extension via email today until she has time to review the information we submitted
and make a formal decision? Our hands are tied at this point. Please advise.
Thanks,
Juanita Shearin Dramby
Brown and Caldwell
SDramby(@brwncald.com
T 919.424.1433
-----Original Message-----
From: Pelletier, Josh R SAW [mailto:Josh.R.Pelletier(@usace.army.mil]
Sent: Wednesday, March 17, 2010 7:56 AM
To: Ellwood, Molly M.
Cc: Dramby, Shearin
Subject: RE: GUC Extension
Molly,
I am forwarding you're your email to Shearin Dramby. She is my contact on this project
and she will be able to answer all of your questions.
You
can PDF us a letter if that works for you. As soon as we get the go head from you guys we
will get things rolling on our end. Thanks so much and let me know if you have any other
questions. Thanks
Josh R. Pelletier
Regulatory Specialist
United States Army Corps of Engineers
Washington Regulatory Field Office
Post Office Box 1000
Washington, North Carolina 27889
(252) 975-1616 ext 34
-----Original Message-----
From: Ellwood, Molly M. [mailto:molly.ellwood@ncwildlife.org]
Sent: Tuesday, March 16, 2010 6:15 PM
To: Pelletier, Josh R SAW
Subject: RE: GUC Extension
Hey Josh,
1
I have been able to pretty much coordinate with everyone that I need to coordinate with on
this and I want to make sure of a couple of details.
I am
assuming that all the work that GUC still needs to do is all within the coffer dams, right?
Secondly, how quickly can the dams be removed, a couple of hours, a day? When they remove the
dams would there be a lot of hammering and other disturbances?
I will try and call you tomorrow, but if not, I will be in a meeting all day.
Oh, one more thing, do require a letter head, or just an email for the extension request?
Thanks,
Molly
Molly Ellwood
Southeast Permit Coordinator
NC Wildlife Resources Commission
127 Cardinal Drive Ext.
Wilmington, NC 28405
(910) 796-7240
Email correspondence to and from this sender is subject to the N.C.
Public
Records Law and may be disclosed to third parties.
-----Original Message-----
From: Pelletier, Josh R SAW [mailto:Josh.R.Pelletier@usace.army.mil]
Sent: Thursday, March 11, 2010 4:30 PM
TO: Ellwood, Molly M.
Subject: GUC Extension
Molly,
We met with those guys yesterday and I am going to recommend that we give them until the
end of March. I don't want to give them too much leeway on this thing but they should be
able to get done what they need to get done by them. If the weather prevents them from
having the coffer cell out by then, I suggest we revisit the issue at that time. Anyway just
let me know what you think. Thanks for all your help on this
Josh R. Pelletier
Regulatory Specialist
United States Army Corps of Engineers
Washington Regulatory Field Office
Post Office Box 1000
Washington, North Carolina 27889
(252) 975-1616 ext 34