Loading...
HomeMy WebLinkAbout20090266 Ver 1_Emails_20100318 (2)Mcmillan, Ian From: Ellwood, Molly M. Sent: Thursday, March 18, 2010 7:25 PM To: Dramby, Shearin; Mcmillan, Ian; Pelletier, Josh R SAW Cc: Dunn, Maria T.; Barwick, Bob D.; Rundle, Kirk R.; Wynne, Bennett; Cox, David R. Subject: RE: GUC Modification - WRC concurrence on March 31st extension Attachments: image001.jpg The NCWRC is willing to grant the requested additional extension into the anadromous fish moraotirium for Greenville Utility Commission's (GUC) raw water intake project in the Tar River, provided our recommendations are followed. All work should occur within the already constructed coffer dam and should be completed, along with the removal of the dam, no later than March 31, 2010. It is our understanding that the removal of the dam would require the use of a vibratory hammer and we recommend that GUC use the quickest and least environmentally damaging methods to remove the sheet piling from the river substrate and minimize sound and vibrations from the hammer to the greatest extent practicable. There is currently a turbity curtain that is in place which we recommend being in place during the removal of the coffer dam. The NCWRC appreciates the coordination with us for the request for this extension. Please feel free to contact me if you have any additional questions or concerns. Molly Ellwood Southeast Permit Coordinator NC Wildlife Resources Commission 127 Cardinal Drive Ext. Wilmington, NC 28405 (910) 796-7240 t ?c,ni r nnnde^ce +o and frond IN,, sender is subject to the WO Public Records Law and may he disclosed to third partial From: Dramby, Shearin [mailto:SDramby@BrwnCald.com] Sent: Thursday, March 18, 2010 11:55 AM To: Ellwood, Molly M. Subject: FW: GUC Modification - WRC concurrence on March 31st extension Juanita Shearin Dramby Brown and Caldwell SDramby(oftrvvncald.com T 919.424.1433 From: Dramby, Shearin Sent: Thursday, March 18, 2010 11:23 AM To: 'Sharon.L.Barnett@usace.army.mil' Cc: Lekson, David M SAW; Pelletier, Josh R SAW; Jernigan, Emily N SAW; Taylor, Marshall; Teem, Robert; 'Barrett Lasater'; 'LANG LERG@guc.com'; 'EMORYRD@guc.com'; 'elksr@guc.com'; TNash@crowdercc.com'; Pritchard, David; 'wynnemb@suddenlink.net' Subject: FW: GUC Modification - WRC concurrence on March 31st extension Hi Sharon, I understand Josh is out of the office. We received the following email from DWQ stating that Wildlife Resources Commission (WRC) concurs with a March 31St extension. This should fulfill the WRC condition of the USACE 404 permit modification that Josh sent this morning. As such, GUC is continuing work and will touch base with the agencies next week on project status. Thank you and have a wonderful day. Juanita Shearin Dramby Brown and Caldwell SDramby0brwncald.com T 919.424.1433 From: Mcmillan, Ian [mailto:ian.mcmillan@ncdenr.gov] Sent: Thursday, March 18, 2010 11:12 AM To: Dramby, Shearin; Barnett, Sharon L SAW; Wynne, Bennett Cc: Pelletier, Josh R SAW; Jernigan, Emily N SAW; Bland, Raleigh W SAW; Lekson, David M SAW; Teem, Robert; Taylor, Marshall; Barrett Lasater; LANGLERG@guc.com; EMORYRD@guc.com; elksr@guc.com; Pritchard, David; SPRINGDW@guc.com Subject: RE: GUC Mod Shearin, Bennett Wynne left me another message this morning indicating he would support granting an extension (to the previously granted extension) for the work to be completed by March 31, 2010, with the request that the extension be conditioned such that noisy vibrating equipment utilization be kept to a minimum. Additionally, I would request that all parties reassess the project by mid-week of next week (March 22 - March 26, 2010) to determine if the project can realistically be completed by March 31, 2010. Thanks, Ian McMillan Ian J. McMillan, PWS, GISP NCDENR/Division of Water Quality Acting Supervisor - 401/Wetlands Permitting and Oversight Unit 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 Office: (919) 715-4631 Fax: (919) 733-6893 Email: ian.mcmillan(a)ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dramby, Shearin [mailto:SDramby@BrwnCald.com] Sent: Thursday, March 18, 2010 10:21 AM To: Barnett, Sharon L SAW Cc: Pelletier, Josh R SAW; Jernigan, Emily N SAW; Bland, Raleigh W SAW; Mcmillan, Ian; Lekson, David M SAW; Teem, Robert; Taylor, Marshall; Barrett Lasater; LANGLERG@guc.com; EMORYRD@guc.com; elksr@guc.com; Pritchard, David; SPRINGDW@guc.com Subject: RE: GUC Mod Importance: High Thanks Sharon. Ian McMillan (DWQ) is granting us a conditional approval until March 31St since Wildlife Resources Commission is not ready to make a decision. If WRC makes a decision prior to the 31s' then DWQ will revise their permit as necessary. Is there any chance the USACE is willing to do the same so GUC can complete work and get out of the river as soon as possible? We would greatly appreciate it. Please advise. % 0 Thank you. Juanita Shearin Dramby Brown and Caldwell SDramby(afbrwncald.com T 919.424.1433 From: Barnett, Sharon L SAW [mailto:Sharon.L.Barnett@usace.army.mil] Sent: Thursday, March 18, 2010 9:13 AM To: Dramby, Shearin Cc: Pelletier, Josh R SAW; Jernigan, Emily N SAW; Bland, Raleigh W SAW Subject: GUC Mod Shearin Here's the Mod for the GUC project from Josh. Please let me know if you have any problems with the file. Thank you Sharon 3