Plan Detail Incomplete - •
[] Plbaso provido a location map for tho project.
Who Roviawed: V~ -t.,~
~l,~r,~ru.,~51.~+
C7 Please show all stream impacts including a1i fill alopos, dissipaters, and bank•stabilization on the sito plan.
[]. Please show ail wetland impacts including fill slopes on the site plan.
f~-re- cr.a ~,~..,~~ ~ a,
^ ~ ~' o. Lli ~..
Please indicate all buffer impacts on the site plan. a~• ~. 3aQ~ Z
.~
^ Please indicate proposed Lot Layout ae overlays as the site plan.
Qf . Ploasa indicata the location of the protected buffers as overlays on the site plan. ~ `t•~'le ~~. ~- '
J~. r.;~i..e ~,,,~.lvi u
^ ease Locate aII isola#ed. or non-isolatat wetlands, •stiearns sad odhcr wat~•s of the State as overlays on the atte plan,
Please provide cross section details showing the provisions for aquatla life passage. ~ l N ~e`"'~'°''` •~ eta' 1 ~/s''b/os aP
,.
• ~p w v-~ o n~c.S ~ O'er S Yw'f•
^ Please locate eay plannad•sewer lines on the site plan. Qle lGr, yc ~,,.,-ai.•f ~~r..l •,, S•~ •
^ Please provide fhe location of any proposed stormwatar management practices as required by ~f .S..fie... ;~' .
33d `i it o, Z ~,c~-1-c .,
Please provide detail far the stormwatar management practices as required by C1CC .3 • ~ .~ ~ ~~s
^ Flease specify Wo percent of project imperviovsneas area based on the estimated builG~out conditions: - ~Y ~ •u ~-
~'~x lK.P
Please indicate all stormwatar~,o~}tfalle on the site phis.
Pleese~indicato ttn~ise flow provision measauos da the site plan.
Please indicate,whother or not the liroposod impacts ahmady been eo
Avoidance•and/or Minimization loot Provided •
• The Iaboleci as on the plans door not appear m bo necessary.
informatiot-~as m why it is accessary for Wis~project. ,
. •^
^.
This C1ffice beliox+es that Wo labeled on We plans as aan be
. Please revise Wo pleas to avoid thQ impacts.
This'Offioe beliav6s•th+at the . •labeled on the plans as• can be
• Please revise the Iaae to minimize the impacts. .
to the
~~ ••.
to ;minimize the impacts tQ the
• ~ p ~' ..
Tho stonnwatea• discharges at the location on Wo plans laboiod will.not provide dii~se flow through Wo buffer booause
. Please xevlae the plans and provIdq calculations to show that di8iase~8ow w111 be achieved through the entlrebuffar. If it
is aof possible to achieve•dit~se floyv thmugh.We ontIre buffer'then it may be necesearyto provide atormwata• management
practices Wet ranove nutrlseaits:before the stormwatar can be ,discharged through the. buffer. ` . .
Oilier ~ ~o ~~Q -~', ~. ~.~~e~ lnc~~ ~Q
^. Zhe application foe was insuffiaient~beeause oiler 150 fact of stream and/or.ovar 1 acre o#`wetland"anpacts ware regaested. Please
provide ~ . ~ Thin additional fee must ba recaivect bofioro your application ca5 be reviewed.
~' ^ Please complete Section(s) on We application. - • ~.~ ~~
' ~ ^ Pleasoprovide a signed Dopy of the appHcation.' ~ ~. •
• ^ Please provide ~ copies of the application, . copies of•the site plans and other supporting information:
,, _ ^ • Pleasasubmit electronic CAD files showirxg :.via: eimall to iaa.momillan(a~incmail,net and CD: •
• ^
Mitigation
of compensatory mitigation is required for this piojdct, ~ Please pmvido•e c~mpensatoiy mitigation plan,• Tho
plan must conform•to tharequire~rnents in 15 A NCAC 2H :OSOO~and must be appropriate to the typo•of impacts proposed.
Please indioate~which~404 Permit the USACE would use to authorize this project. ' . •