Loading...
HomeMy WebLinkAbout20090063 Ver 2_Triage Comments_20100319 D VY Q4 Use this form instead of writing inside the folder Triage Comment Sheet v V ? ?1 r ?^^ Triaged By: Reviewer 1 A 1-11) Reviewer 2 Reviewer 3 ? Issue Project (Reviewer 1) I *th conditions (R LAIA) Date: Date: Date: Teens with conditions ('Reviewer 2) ? More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY ?. Issue Project (Reviewer 2) SENDING CONFIRMATION DATE MAR-19-2010 FRI 16:27 NAME DWQ--WETLANDS TEL 9197336893 PHONE : 912523990804 PAGES : 4/4 START TIME : MAR-19 16:25 ELAPSED TIME : 01107" MODE : ECM RESULTS : OK FIRST PAGE OF RECENT DOCUMENT TRANSMITTED... North Carolina Department of Environment and Natural Resources Pivieion of Wear hre1lY bse Freeman gevery Ewes %rdue Coieen H. Sulft Secretary 00vemor oiredw Division of Water Quality Department of Environmental and Natural Resources 401 Oversight/Express Review, Program Development and Transportation Permitting Units Street Address: 2321 Crabtree Blvd. Suke 25% Raleigh, NC 276042250 Malang Address: 1650 man service Center Raleigh, NC 27699-1650 C01ktact100Mation: Phonetk919-733-1786 Fax#: 919-7336893 Fax To: .. V1 Fa: #: 2 ??Z f 3 ! ( D B ? ' Company- From: m: 3 1 ?I? 7 J Number of pages including cover sheet: Notre or special instructions: 4010vxvrdbpa? RewevPWd&V LWA Ism 8y3 sown C. ,, RWON NeM CrOw De341e50 L0CMew PJ41 CmVm ON, RaWak NoM Cuo1re 27903 Freya: 919-773.17811 FAX 919-733-NO Inwret. M,#?Rm saX,c.uYmvel3MY °ao fl NCaro??1;,mfl An Eq.! 0?!'IA11maiMAeran pglsnr Project Name: Rolesville Middle School DWQ Project #: 09-0063v2 Date Received: 02/05/2010 Date of Comments: 03/19/2010 SMP & Diffuse Flow Comments: Stormwater Comments: 1. Wet Pond: a. Please note that wet detention pond alone does not achieve 30% Total Nitrogen removal efficiency as required by the Neuse (NSW) stormwater requirements. You may do one of the following: i. Redesign the pond for 85% TSS and combine it with other treatment device such as grassed swale (meeting swale seeking credit design guidelines) or level spreader-vegetative filter strip system (minimum 30 feet to wetland). ii. Since the pond has been designed for 90% TSS (being larger than 85% TSS pond but less than area required for a stormwater wetland), you may choose to redesign it as a pond-wetland hybrid system. This can be achieved by creating a pond (large deep pool of water) in the middle, widening the 10-ft shelf to about 15-20 ft around the pool of water with the inner two-thirds as shallow water and the outer one-third as shallow land. b. Appropriate plants for the zones MUST be selected, and a detail planting plan shall be provided. We believe if designed and constructed properly, this could achieve the required 30% nitrogen treatment. Please refer to the stormwater wetland section of the NC DWQ BMP Manual for plant selection. c. Due to the close proximity of the wet pond to the wetland, coupled with the type of soils at the pond location, this office recommends that a clay liner or other engineering measure must be provided to avoid impacting the adjacent wetland. d. The 3" orifice appears to drawdown too quickly (1.75 days) by our calculations. Please use a 2.5" orifice unless design changes. It is recommended that you use a larger pipe with the orifice hole drilled in a cap on the pipe for easy maintenance. e. Please provide anti-flotation calculation for the outlet structure. f. Please show the emergency spillway on the plan view 2. Level Spreader: a. Please provide level spreader detail having all required components such as forebay, blind swale/channel, level spreader lip (concrete) and a 3-ft of #57 stone underlain by a filter fabric immediately downslope of the LS- lip. Bioretention Areas: a. Please note that the required surface area at the top of the bioretention cells shall be provided and measured at the top of the planting media and not the top of ponded water surface (berm). This area shall be equal to the design volume divided by the ponding depth. b. Please provide a depressed type of dissipation device rather than a flat apron at the pipe outlets into the bioretention cells. c. Please specify the soil media mix, source of the media, phosphorus index (P- Index) and they type of grass (Centipede or fescue/blue grass mix) on the plans. d. Please provide direct discharge for the larger storms to the stream. This can be achieved with a pipe or riprap channel from an overflow device, and the flow from the underdrain pipes must be connected to the bypass pipe/channel. 4. Operation and Maintenance (O & M) Agreement Forms: All sections and pages of the form for each device must be provided. Only the notarized pages were received for each device.